Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Nitrogen Control in the EAF and Post EAF Processes

    By B. Stettner, J. Asante, S. Abraham

    The levels of nitrogen in steel produced in various metallurgical vessels vary significantly. For example, the tap nitrogen levels in steel produced in the BOF are around 4Oppm, as compared to 70-100p

    Jan 1, 2004

  • CIM
    Recent Developments in Drilling Mud

    By R. B. Hyde

    "Severe drilling conditions and difficult mud problems are briefly out-lined as the major cost items in all production operations. The chief problems discussed are abnormal pressures, high temperature

    Jan 1, 1959

  • CIM
    Coal Gasification - The "New" Energy Source

    By J H. Dressel, J. E. Williams

    This paper presents a brief review of what coal gasification is, procedures that are available today and processes that may be available in the future. Examples are given as to how the process might b

    Jan 1, 1973

  • CIM
    Distribution of Gold in Hypogene Ore at the Ernest Henry Iron Oxide Copper-Gold Deposit, Cloncurry District, NW Queensland

    By P. J. Williams, A. R. Foster

    Petrographic studies, assay records, and laser ablation-inductively coupled plasma-mass spectrometer (LA-ICP-MS) analyses of major sulfides suggest nearly all of the gold at the Ernest Henry Cu-Au dep

    Jan 1, 2007

  • CIM
    Economic Considerations in the Production and Preparation of Coal for the Carbonization Market

    By Gerald Blackmore

    "This paper suggests that with the settlement of long-term contracts of fifteen years' duration, with prospects of extension, the coal mining industry has, for the first time, a complete commercial ju

    Jan 1, 1970

  • CIM
    Improving Construction Environmental Metrics Through Integration of Discrete Event Simulation and Life Cycle Analysis

    By H. Golzarpoor

    Life Cycle Analysis (LCA) is a methodology for evaluating the environmental impacts associated with a product during its life cycle. LCA is identified as the most reliable method for verifying environ

    Aug 1, 2013

  • CIM
    Explore or acquire? The dilemma

    By H. O. Seigel, J. C. Gingerich, E. O. Köstlin

    "To satisfy their continuing need to replenish or expand their ore reserves, mining companies are faced with the dilemma of arriving at a proper balance between the dual avenues of discovery through i

    Jan 1, 2002

  • CIM
    Comparison of the Catalytic Activity between Au and Pt for CO Oxidation within the Range of the Concentration of the Order from ppm to % for Indoor Air Purification

    By Hiroaki Sakurai

    Using batch reactors equipped with CO and CO2 gas sensor, CO oxidation over Au catalysts in room air has been investigated and compared with Pt catalysts. For both Au and Pt catalysts, the logarithm p

    Oct 1, 2003

  • CIM
    Review of Coal Beneficiation Practices in Canada

    By T. A. Lloyd

    "This paper indicates the extent to which Canadian coal mine operators have taken advantage of developments in the science and technology of coal that would allow them to better satisfy changing marke

    Jan 1, 1968

  • CIM
    Stacking of Potash Mill Tailings (a53a3fa3-c9c5-495d-81ff-6d030f92ec59)

    By P. G. Roden, G. A. Maki, P. J. Fullmann

    "In October 1984, Rocanville Division began using a stacking system to handle potash mill tailings. Previous to this date, mill tailings were slurried to the top of the tailings pile and allowed to de

    Jan 1, 1986

  • CIM
    Numeric Model of a Cemented Rockfill Span Test at the Turquoise Ridge Mine, Golconda, Nevada, USA

    By D. R. Tesarik

    Researchers from the National Institute for Occupational Safety and Health (NIOSH)1 and engineers from Placer Dome, Inc.2, conducted an underground rockfill span test at the Turquoise Ridge Mine near

    May 1, 2007

  • CIM
    The Horne Mine: Geology, History, Influence on Genetic Models, and a Comparison to the Kidd Creek Mine

    By Sergio Cattalani, David J. Kerr, Harold L. Gibson

    Abstract - The Horne mine was truly a world class Cu and Au deposit. Between 1927 and 1989, it produced some 260 t of Au and 1.13 Mt of Cu from 53.7 Mt of ore that averaged 2.22% Cu, 6.1 g/t Au and 13

    Jan 1, 2000

  • CIM
    Structural, Electronic, and Impurity-doping Effects in Catalytically Active Gold Nanoclusters and Nanostructures

    By Hannu J. Häkkinen

    Metal clusters exhibit unique size-dependent physical and chemical properties that differ from those of bulk materials or large particles. Here we discuss recent theoretical investigations of the cata

    Oct 1, 2003

  • CIM
    Melt Extraction of Gold Fibers and Precious Metal Doped Fibers and Preparation of Porous Gold Fiber Structures

    By Olaf Andersen

    Crucible melt extraction yields short metal fibers with eqivalent diameters as low as 50 µm from almost arbitrary metals and alloys. Highly porous components can be made from such fibers by suitable d

    Oct 1, 2003

  • CIM
    Tailings Disposal at Kidd Creek Mines Ltd.

    By T. J. Yeomans

    "The Kidd Creek metallurgical site is situated twenty-six kilometres east of Timmins, Ontario. The site consists of a 4.5 niillion tonne per year concentrator, a 127,000 tonne per year electrolytic zi

    Jan 1, 1986

  • CIM
    Application of Steam to the Dewatering of Metallurgical Concentrates

    By C. S. Simons, D. A. Dahlstrom

    "Growing interest in the developing technique of improving the dewatering of filter cakes by the direct application of steam has been apparent during the past year. A number of applications to iron an

    Jan 1, 1966

  • CIM
    The Starved Acid Leaching Technology (Salt) for Nickel Recovery from Saprolites

    By N. Waters

    "Nickel saprolite ores are normally mined as feed to Fe-Ni smelters or Ni matte smelting operations. The smelting processes typically require high Ni cut-off grades of approximately 1.5 to 2.2% Ni, de

    Jan 1, 2017

  • CIM
    Comparing the Behaviour of Modeled Paste in 2D and 3D, using Both Simplified and Complex Stope Geometries

    By Ryan L. Veenstra

    This paper presents a modelling study of a cemented paste backfill in an underground stope. The model was developed to help provide a better understanding of what is happening in the stope during the

    Jun 1, 2012

  • CIM
    Twelve Months' Milling at Noranda

    By C. G. McLaughlan

    The Noranda concentrator was placed in operation in October, 1928, and the object of this paper is to outline operations during the twelve months which have elapsed since that time. The ores milled

    Jan 1, 1930

  • CIM
    Removal, Control and Management of Total Dissolved Solids from Process Effluent Streams in the Non-Ferrous Metallurgical Industry- A Review

    By V. “Ram” Ramachandran

    "In view of the increasing number of environmental regulations that have been promulgated all over the world in the last thirty years, non-ferrous smelters and refineries have had to learn and adapt t

    Jan 1, 2012