Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Common pitfalls in sampling iron oreBy R J. Holmes
The procedures and equipment used for sampling iron ore process streams have generally improved in recent years. However, there are a number of areas where significant issues still commonly occur, inc
May 9, 2017
-
Rapid and reliable flow property testing – a modified uniaxial approachBy K Williams, W Chen, J Miller
The flow function of an iron ore material governs its flowability characteristics in material handling chains within the resource industry. A uniaxial compression test is able to obtain a flow functio
Jul 24, 2017
-
Amphibole Au-Cu Skarn and Massive Sulfide Replacement at the Peak Deposit, Eastern Interior, AlaskaBy P Illig, R Newberry
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Recent exploration efforts in Eastern Interior, Alaska have discovered significant ca 72 Ma
Mar 18, 2015
-
Auriferous Paleozoic Accretionary Terranes Within the Mongol - Okhotsk Suture Zone, Russian Far EastBy A C. Edwards
The Mongol-Okhotsk belt consists of detached fragments of the Circum Pacific fold belt which have been trapped within the Mongol-Okhotsk fold belt. In its western part, the structures of the belt form
Jan 1, 1999
-
Opening Speech for 2006 NZ Branch Annual ConferenceGood morning ladies and gentlemen, and may I thank you for inviting me once again to address your conference. I would first like to welcome you all, especially international delegates and conference s
Jan 1, 2006
-
Use of Backscattered Gamma Radiation for Determining Grade of Iron Ores in Blast Holes and Development Drill HolesBy Wylie A. W, Mathew P. J, Eisler P. L
Field studies of the radiations backscattered by iron ores from a 60Co source of primary gamma radiation located in a borehole logging probe have confirmed thatthe P" factor, a ratio of high ener
Jan 1, 1977
-
A Study of Extracting Vanadium from Stone Coal Using Cyclic OxidationA Study of Extracting Vanadium from Stone Coal Using Cyclic Oxidation
Sep 13, 2010
-
Development of the Professional Mining Technician – Henderson’s Underground Mine Continuous Improvement ProgramBy C Rizzardi, M Callahan, J Mahon
Henderson Operation’s underground molybdenum mine has been in production since 1976. Since that historic date, more than one billion pounds of moly has been produced, and over 120 Mt of ore extracted
May 9, 2016
-
Educating the next generation of geologistsBy D R. Cohen
As one of the four basic sciences, the study of geology is intrinsically worthy as a means of increasing fundamental knowledge of the behaviour and evolution of the universe. Geological knowledge can
Sep 20, 2017
-
The Macraes Gold Mine Development of a Major ResourceThe Macraes Mining Company Limited was listed on the New Zealand and Australian stock exchanges in January 1990, and the proceeds of the float were used to purchase a 70 per cent interest in the Macra
Jan 1, 1991
-
JumboGuard – automatic boom isolation systemBy J Dwyer, M Hill
Downer’s mining division has made an operational and financial commitment to developing engineered solutions that mitigate the risks associated with operator proximity to uncontrolled development dril
Oct 16, 2017
-
Improving Pentlandite Selectivity Over Pyrrhotite Using ReagentsImproving Pentlandite Selectivity Over Pyrrhotite Using Reagents
Sep 13, 2010
-
Raub Gold-Genesis and RecoveryThe Raub Gold Mines are situated approximately in the centre of the Malayan Peninsula in the State of Penang. Part of the area, now known as "Raubhole," was opencut some 800 years ago by the
Jan 1, 1945
-
Measurement of Blast Vibrations: Compliance under the RMAWith the change in legislation under the Resource Management Act 1991 (RMA), the responsibility for administering the effects of blasting on the environment, has transferred from an essentially centra
Jan 1, 1996
-
Minerals Processing and GreenhouseThe overwhelming weight of scientific opinion indicates that human activity is having a discernible and negative influence on the earthÆs climate system. The Australian Government, together with about
Jan 1, 2002
-
Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessmentBy A Kemp, I Taylor, S C. Lamoureux
Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo
Jul 24, 2017
-
Automated Train Ore TransportBy J Fisher, M Castro, A Hariyadi
The train haulage system being designed for PT Freeport Indonesia’s Grasberg Block Cave (GBC) will be located within the mine at an elevation of almost 3000 m above sea level on the west side of the i
May 9, 2016
-
Land Reclamation at Waihi û PrinciplesBy R B. Stewart
Where pasture production is the intended land use of the areas to be reclaimed, the creation of a suitable growing +medium is a major objective. To achieve this land reclaimers require a sound underst
Jan 1, 1991
-
Theory of Sampling – what’s next?By K H. Esbensen
The Theory of Sampling (TOS) has made remarkable strides and has witnessed a suite of achievements over its ~65-year history; especially in the last 15 years, since organised work began for the erstwh
May 9, 2017
-
Good Delay Timing-Prerequisite of Efficient Bench BlastsVariations in delay timing can have a marked influence on blasting effectiveness and, hence, on total production costs. In single-row bench blasts, delay firing is invariably more effective than simul
Jan 1, 1977