Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Pilot-Scale Kiln Processing of New Zealand Ilmenite

    By Mills R, Shannon W. T, Finch J

    As an extension to investigations into methods of upgrading the Iitania content of ilmenite concentrate from beach sands using 100 g/day, a small pilot plant treating 23 kg/ day of ilmenite was used.I

    Jan 1, 1977

  • AUSIMM
    Risk "Thinking" for Australian Tunnelling

    A paper presenting an overview of legislative and best practice approaches to the management of OHS&E and business risk for Australian tunnelling operations. Best practice can be achieved in

    Jan 1, 2008

  • AUSIMM
    The Kiewa Hydro-Electric Scheme Special Reference to Tunnelling Operations

    By Knevitt L. T

    PART 1Details of Kiewa Scheme.Introduction.Topography.Preliminary Investigations.Geology.Description of Project.Details of Main Works.Main Transmission of Power.Construction Facilities.PART 2Undergrou

    Jan 1, 1950

  • AUSIMM
    Notes on Mount Read and its Sulphide Ore Bodies

    Mount Read is 'situated in the county of Montagu, on 'the west coast of Tasmania, about 20 miles inland from. Remine in an easterly direction, 15 miles northerly from Mount. Lyell, and 30 mi

    Jan 1, 1901

  • AUSIMM
    PeckÆs Centrifugal Elevator

    The centrifugal elevator invented and patented by the writer is designed for the purpose of conveying the tailings of a gold dredge to such a distance that it shall not impede the dredging opperations

    Jan 1, 1904

  • AUSIMM
    Mining Licences - Instruments for Resource Management?

    Sufficient time has elapsed since the enactment of the amendments to the mining legislation in 1981 to enable an examination to be made of the way in which the licensing system operates in practice. O

    Jan 1, 1988

  • AUSIMM
    Optimising Metallurgy at the Planning Stage to Minimise Environmental Impact - A Feedback Loop from Geochemical Waste Characterisation

    By P Mulvey

    "Currently mine process studies and geochemical waste characterisation are considered as two interdependent studies, necessary for the development of the mine and inclusion in the environmental impact

    Jul 15, 2013

  • AUSIMM
    Notes on the Geology, Quartz Reefs and Minerals of the Waihi Goldfield

    The rocks of Waihi and the surrounding district are almost entirely rhyolitic and ande5itic in character. Sedimentary rocks, with the exception of some surface deposits of clay loosely compacted congl

    Jan 1, 1902

  • AUSIMM
    Quantity Estimation of Concentrate in Dams

    At the treatment plant of the Broken Hill South Limited, Broken Hill, the zinc concentrates, with water, are pumped out to a more or less level area, and stored in dams to dry by drainage and evaporat

    Jan 1, 1925

  • AUSIMM
    Wall-flow type diesel particulate filter system to replace existing wet element filter systems used in typical LHDs in underground coal operations

    By N Coplin

    Australian Coal Association Research Program (ACARP) project C25073 was proposed by industry stakeholders seeking a potential solution that improves underground air quality and reduces operational cos

    Aug 28, 2017

  • AUSIMM
    Porphyry Cu-Au Mineralisation, Advanced Argillic Alteration and Polymetallic Sulfide-Quartz-Anhydrite Veins at Ohio Creek, Thames, New Zealand

    By D N. B Skinner, M P. Simpson

    At Ohio Creek, 3 km northwest of the Thames bonanza goldfield, porphyry Cu-Au mineralisation is hosted in a dacite porphyry associated with porphyry intrusion breccias and overlying andesites and daci

    Jan 1, 1998

  • AUSIMM
    A Guide to the Understanding of Ore Reserve Estimation

    By Bujtor G. J, McMahon D. W

    This guide to the understanding of ore reserve estimation is the revised version of a report with a similar title circulated within the CRA Limited (CRA) group of companies in mid-1980. It is the prin

    Jan 1, 1982

  • AUSIMM
    Economical Evaluation of Use of Sinter in an Integrated Mini Steel Plant

    By Pfeifer H. C, Nicacio P. A D

    Sinter has been used as part of the metallic charge in large-scale blast furnaces for many years with the well-known benefits in terms of productivity and fuel consumption. However, because of the h

    Jan 1, 1999

  • AUSIMM
    The Selection Design and Application of Mill Liners for Large Wet Grinding Mills

    By C Thompson, D Connelly

    The history of mill liners has evolved over time and this paper tracks the changes and development of liner technology. It provides an overview of the primary types of liners, the design and the mater

    Jul 15, 2013

  • AUSIMM
    Comparison of Ore Dressing Methods Used by Ilmenite Producers in Western Australia

    Ilmenite production in Western Australia commenced in 1956. There are now five producers, all in the Bunbury-Capel district, and current total production capacity is about 450,000 t.p.a.The deposits o

    Jan 1, 1965

  • AUSIMM
    Geotechnical Challenges in Cave Monitoring – a Modern Approach

    By A Jäger, J L. Lett, J Rachocki and B Mobilio

    The Newcrest Mining Limited Cadia East Panel Cave mines near Orange, New South Wales, Australia commenced production 1200 m below the surface in May 2014. Understanding the mine-wide impact caving had

    May 9, 2016

  • AUSIMM
    Study on Mineral Processing of Refractory Copper-Nickel Ore

    Study on Mineral Processing of Refractory Copper-Nickel Ore

    Sep 13, 2010

  • AUSIMM
    Delivering a healthy atmosphere underground in a cost-conscious environment

    By D Reid, J Black

    The adverse health impacts from diesel particulate matter (DPM) exposure are a well-known global concern. The building evidence has triggered underground mining operations to review existing atmospher

    Aug 28, 2017

  • AUSIMM
    Lead and Zinc Smelting Charges

    By Grey CA

    Any economic evaluation of a lead-zinc mining project requires the estimation of net revenue per tonne of concentrate at the "mine gate". The value at the mine gate equals the Net Smelter Return min

    Jan 1, 1990

  • AUSIMM
    New Slurry Sampling Systems for Mineral Processing Plants

    By J Weir

    Accurate sampling of slurry streams is extremely important for metallurgical accounting in mining operations, not only for measuring the ore grade from the mine, but also for measuring the recovery of

    Jan 1, 2002