Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Aluminothermic production of silicon using different raw materials

    By M Zhu, G Tranell, N Simkhada, K Jakovljevic, M Wallin

    Silicon is a vital element in many products today, such as electronic components, solar devices, high-quality alloys, and many others. The growing global demand highlights the need for the development

    Jun 19, 2024

  • AUSIMM
    The Charging of Slurry Explosive with the Nitro Nobel Cartridge Loader at the Mount Lyell Mining and Railway Co. Ltd., Queenstown, Tasmania

    By Wilson J. R

    The main mining method employed at Mt Lyell is sub-level open stoping with a typical extraction level interval of 100 m and sub-level intervals of 30 m. Currently, pillar blasts provide the major p

    Jan 1, 1977

  • AUSIMM
    Successful Geostatistical Approach for a Nickel Ore Deposit – A Case Study for Nickel Laterite Deposit in Central I Pit, Kabaena Nickel Mine, Kabaena Island, Southeast Sulawesi, Indonesia

    By V Yadi

    Geostatistics has been widely used for more than four decades as a powerful tool in ore resource/reserve estimates and grade control. This method has gradually replaced the conventional method such as

    Aug 22, 2011

  • AUSIMM
    A History of Drill Consumable Control at Renison Mine

    By Davison GR

    The cost of drilling consumables is always a large component of any mine budget. It is important that this cost be carefully examined with a view to reducing the overall cost per inetre or at least mi

    Jan 1, 1985

  • AUSIMM
    Control of Acid Mine Drainage From Partly Oxidised,Polymineralic Mine Wastes Using Phosphate Coatings

    By B G. Lottermoser

    Phosphate induced stabilisation has been used to create passive iron phosphate coatings on pyrite and pyrrhotite. The formation of solid phosphate coatings on sulfide grains thereby inhibits sulfide o

    Jan 1, 2003

  • AUSIMM
    Settling Pond Design and Construction for the Malvern Hills Coal Project, Canterbury

    The Malvern Hills coal project is now in an advanced stage of development with the stripping of overburden from above former underground workings in which a 3 m seam of subbituminous C coal with very

    Jan 1, 2003

  • AUSIMM
    Durability Planning for Underground Infrastructure

    By D Wimpenny

    Underground infrastructure is often a critical component of transportation and utility schemes. It is characterised by long design lives with limited access for inspection and maintenance. The exposur

    Mar 8, 2011

  • AUSIMM
    Economics of Narrow Vein Mining

    During the past five years there has been a transformation in the operating costs which apply to narrow vein mining. Mechanised methods including sublevel uphole retreat and narrow vein cut and fill a

    Jan 1, 1993

  • AUSIMM
    Reduction of Airborne Dust on the E48 Extraction Level at Northparkes Mines

    By C Vejrazka, A Wyllie

    A common problem faced by underground mining operations around the world is airborne dust sourced from production and auxiliary processes. In most underground mining methods, air is generally directed

    Mar 24, 2014

  • AUSIMM
    A Comparison of Fluid Origins and Compositions in Iron Oxide-copper-gold and Porphyry-Cu (Mo-Au) Deposits

    By B Rusk, L Corriveau, P Emsbo, R P. Xavier

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Porphyry-Cu (Mo-Au) deposits and iron oxide-copper-gold (IOCG) deposits are both characteri

    Mar 18, 2015

  • AUSIMM
    Design of a Continuous Monorail Drilling System for Decline Development

    By M Kuruppu, B Besa

    Currently, conventional methods of decline development put enormous cost pressure on the profitability of mining operations. This is the case with narrow vein orebodies where current methods and mine

    Jan 1, 2008

  • AUSIMM
    Land Rights and Miners' Rights - Are They Compatible?

    The first grant of land rights in Australia was pursuant to the Aboriginal Land Rights (Northern Territory) Act 1976. That Act has been at the core of the dispute between land rights and miners&ap

    Jan 1, 1986

  • AUSIMM
    Cathode Zinc Morphology and Effects of Changed Conditions in Electrowinning Cells

    By Ault A. R

    The recent modernisation program at the Risdon electrolytic zinc smelter of Pasminco Metals - EZ (PMEZ) inyolved significant changes to the composition of cell electrolytes. The most significant wer

    Jan 1, 1993

  • AUSIMM
    Calcining Aluminum Trihydrate in a Circulating Fluid Bed, A New Technique

    Increasing demands on quality of metallurgical grade alumina and for lower production costs led to the development of a new fluid bed calcining process. The process, jointly developed in Germany by

    Jan 1, 1971

  • AUSIMM
    Industrial Minerals Reserves Assessment

    By Lee G, Stitt P

    The term "industrial minerals" covers a vary wide field. However in Australia this field tends to be characterised by the follow- ing: (1) Relatively low unit values. (2) Product specifications can

    Jan 1, 1979

  • AUSIMM
    Small Scale VAT Leaching

    Major exploration companies can have a problem with what to do with small precious metal ore bodies located through exploration programmes. Low tonnage, but high grade, ore bodies too small to justify

    Jan 1, 1990

  • AUSIMM
    The Financing of New Resource-based Projects in the Next Decade

    Depending upon the probability one assigns to project go-ahead, up to $10 billion (1978 figures) could be required for resource based projects in Australia in the next decade. In the past major reso

    Jan 1, 1979

  • AUSIMM
    Review of Seam Gas Drainage in Australia

    By Lunarzewski L

    Gas problems, largely instantaneous outbursts of coal and gas, arose in the early days of coal mining in Australia, leading to attempts at predrainage often including destressing. With deeper mining a

    Jan 1, 1985

  • AUSIMM
    Kalgoorlie Nickel Smelter: Integration of Flash Smelting and Slag Cleaning within one Process Unit

    By Hohnen CA, Limerick JM, Hall DRT

    An uniquely-designed flash furnace for smelting of nickel concentrate and for the recovering of metal values from the slag generated has been in successful use for nearly six years. Within the las

    Jan 1, 1984

  • AUSIMM
    Better Ideas-Brighter Future

    By Hedley TP

    Success for underground coal mine operators in the 1990's and beyond will be dependent upon better understanding of the dynamics of their operating environment, and extension of emerging tech

    Jan 1, 1987