Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Origin of High-Grade Iron Ores at the Thabazimbi Deposit, South Africa

    By N J. Beukes, S T. Netshio, M O. de Kock

    The Thabazimbi iron ore deposit comprises a series of stratabound orebodies, on average 18 - 25 m thick that are aligned along the faulted basal contact between the Penge Iron Formation and dolostones

    Jan 1, 2005

  • AUSIMM
    Can the concept of the circular economy help unlock complex orebodies?

    By G Corder

    The aim of the circular economy is to accelerate the transition from a conventional linear take-make-dispose economic model to a circular model. It is restorative and regenerative by design and aims

    Nov 21, 2018

  • AUSIMM
    The Distribution of Hydrothermal Minerals at the Golden Cross Epithermal Au-Ag Deposit, Waihi, New Zealand

    By S F. Simmons, A McOnie, J L. Mauk

    Three cross sections, 200 m apart, display the distribution of indicator hydrothermal minerals across the Empire zone of the Golden Cross epithermal Au-Ag deposit, Waihi, New Zealand. These minerals a

    Jan 1, 1995

  • AUSIMM
    Geometallurgical Sampling and Resource Estimation for Magnetite Deposits

    By J N. Farrell

    Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge

    Sep 5, 2011

  • AUSIMM
    Recovering RE with NH<sub>4</sub>Cl Roasting from Bastnasite Ore

    By Q Xin, X Shengming, C RuÆan, Z Zhigeng a

    The optimum defluorinating conditions for Sichuan bastnasite crude ore were determined by orthogonal experiments. Over 95 per cent fluorine in the crude ore was stripped by roasting 30 minutes of the

    Jan 1, 2000

  • AUSIMM
    Application of rock mass index in the prediction of mine water inrush and grouting quantity

    By W Zhu, J H. Zhao, H Ma

    The permeability coefficient is an essential parameter for the study of seepage flow in fractured rock mass. This paper discusses the feasibility and application value of using readily available RQD (

    Nov 29, 2022

  • AUSIMM
    Semi-automated Geological Interpretation Using Assay and Infrared Spectroscopic Sensing Parameters towards Improvements in Geological Modelling

    By F Flitti, M Haest, O Dominguez, D Mittrup, G Hird

    The automated geology interpretation (AGI) tool has been developed in BHP Billiton to automate stratigraphy logging of drill holes, using any available quantitative data sets. At present, AGI is set-u

    Jul 13, 2015

  • AUSIMM
    The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount Isa (ee90997b-915a-4723-962c-df13e11cf8b6)

    By Kuganathan K, Potvin Y

    Enterprise Mine at Mount Isa is to expand ore production from the current 1.4 to 3.5 mtpa by mining the 3500 Orebody, from which production is scheduled to start in February 1998 making this the dee

    Jan 1, 1998

  • AUSIMM
    South Island Lignite's Phase II Investigations

    By C J. McKenzie, D F. S Natusch

    The lignite deposits of Southland and Central Otago are a potentially significant energy resource for New Zealand. Current estimates put the technically mineable lignite reserves at 5.3 billion tonnes

    Jan 1, 1983

  • AUSIMM
    A Review of Fatal Outburst Incidents in the Bulli Seam

    By Singh RN

    The Bulli Coal Seam, located in the Illawarra Coalfield of New South Wales, has a long and varied history of sudden outbursts. From available information this problem has resulted in twelve fatalities

    Jan 1, 1998

  • AUSIMM
    Rehabilitation of Mine Tailings by Simultaneous Prevention of Oxidation and Treatment of Acid Effluents Using a Wood-Waste Cover

    By N TassT, J Cyr

    At the East Sullivan site, wood wastes covering the abandoned mine tailings impoundment prevent sulfide oxidation by creating an anoxic environment. The addition of coarse ligneous wastes and their hi

    Jan 1, 2003

  • AUSIMM
    æKeep the CreamÆ ù Reconciling Coal Recovery at BMA Goonyella Riverside

    By M J. Kelleher

    CREAM is an acronym for coal recovery, evaluation, analysis and management and is a business improvement project at BMAÆs Goonyella Riverside mine that is focussed on maximising coal recovered. In Au

    Jan 1, 2005

  • AUSIMM
    Sulfur – the new geometallurgical grade in gold-sulfide deposits

    By S Juras

    To our geologists at Eldorado Gold Corporation, the release of the gold assays on a new ore zone causes a flurry of excitement. But to our metallurgists, that news is often greeted with the question ‘

    Sep 20, 2017

  • AUSIMM
    Geophysical log applications to geological and geotechnical assessment

    By B Zhou

    Geophysical borehole logging, which measures various in situ petrophysical parameters, can be used not only for qualitative interpretation such as strata correlation, but also for geotechnical assessm

    Nov 8, 2021

  • AUSIMM
    Unravelling the Factors Impacting on Concentrate Quality by Geometallurgical Data Analysis at Fortescue Metals Group’s Iron Bridge Magnetite Mine

    By A Manfrino

    The Iron Bridge magnetite mine and infrastructure project is currently in development as a joint venture between Fortescue Metals Group, Formosa and Baosteel. It is supported by an extensive database

    Jul 13, 2015

  • AUSIMM
    A new approach to logging and modelling faults at the Dugald River Pb-Zn-Ag deposit, North West Queensland

    By K George

    The Dugald River lead-zinc-silver deposit is located approximately 60 km north-west of Cloncurry and 87 km north-east of Mount Isa. The development project is expected to turn operational in 2018. The

    Sep 20, 2017

  • AUSIMM
    Construction Management of Hydrogeological Aspects of Melbourne City Link Project

    By I A. Lamb

    The Melbourne City Link Project has two tunnels, the Domain and Burnley Tunnels, which have been constructed by Transfield Obayashi Joint Venture (TOJV) under a design and construct contract. The two

    Jan 1, 1999

  • AUSIMM
    Risk Assessment in Mine Rehabilitation Planning: Using the Option of an Above Ground Tailings Containment at Ranger Uranium Mine as an Example

    By Riley S. J

    Ranger Uranium Mine is located within the Alligator Rivers Region of the Northern Territory of Australia and surrounded by the World Heritage listed Kakadu National Park (Figure 1). The mining oper

    Jan 1, 1994

  • AUSIMM
    Trials, Tribulations and Triumphs of Unmanned Aerial Vehicle Surveying at St Ives Gold Mine

    By R Steven

    "Surveying, and as a result, surveyors, have been around since the start of time, and it has been said that so has their methodology!The theodolite and tape have been the backbone of a time-tested pra

    Nov 15, 2016

  • AUSIMM
    Instability analysis in three-way and four-way coal mine intersections

    By B Abbasi

    It is well known that most roof falls in coal mines typically occur at and around intersections. Room-and-pillar and longwall coal mining systems typically develop 3-way and 4-way intersections. This

    Nov 30, 2018