Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
TBM Design and Performance of Today - A Rapid Development - Where Will it End?The last decade has seen a very rapid development in TBM tunnelling. Some trends are purely technical or economical and others relate more to preferences of different interests. Power levels have more
Jan 1, 1993
-
Sampling and Analysis for Public Reporting of Portable X-ray Fluorescence Data Under the 2012 Edition of the JORC CodeBy G M. Jeffress, D C. Arne
There are two discrete aspects to collecting portable X-ray fluorescence (pXRF) data to obtain reliable results and to comply with reporting requirements under the 2012 edition of the JORC Code (JORC,
Jul 29, 2014
-
Longwall face floor failure assessment using a semi quantitative risk rating methodologyBy S Grimsey, E Janetzki, J Emery
Floor failure on the longwall face is a complex problem due to the dynamic interaction between the surrounding strata and powered roof supports involving multiple variables. It can also be highly prob
Nov 29, 2022
-
Improving Fine Sulfide Mineral Recovery ù Plant Evaluation of a New TechnologyBy K Ellis, B Lumsden
A full-scale statistically-based on/off plant trial of a new flotation conditioning technology designed to improve fine mineral recovery was undertaken to determine whether the recovery of selected fi
Jan 1, 2005
-
Development of a Submerged Injection Process for the Production of DoreÆ Silver at BHASBy Swayn G. P, Floyd J. M
BHAS, together with the G.K. Williams Laboratory, and Ausmelt Pty. Ltd., has examined a number of possible alternatives to conventional silver cupellation in gas fired reverberatory furnaces. Of th
Jan 1, 1989
-
A Brief History of Pierre Gy's Sampling Theory and Current Trends in its Acceptance in the Mining WorldSixty years after its inception, after an alternation of periods of admiration and rejection by the industry, Sampling Theory can now be seen as going through its golden age. A brief history of its su
Jan 1, 2008
-
Integration of Geological and Geotechnical Data for Three-dimensional ModellingBy K Zunica, A R. Penney
The principles of three-dimensional geological modelling are well understood and routinely used. Sample data is collated and geostatistical tools used to ensure that sample data is suitable for its en
Aug 18, 2014
-
A Review of the Acid Rock Drainage Potential and Hydrological Implications of Selectively-Placed Waste Rock at a Gold Mine in NSW, AustraliaBy J Jeffrey, G W. Wilson, L Gilbert, C
Prior to the commencement of mining, the acid rock drainage (ARD) potential of the waste rock to be produced by an open cut mining operation is assessed by a variety of techniques carried out on drill
Jan 1, 2003
-
Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)By C E. Woolley, H Jebaliya, J Foster
The East wall of the Kalgoorlie Consolidated Gold Mines Fimiston Open Pit (KCGM Superpit) has a history of wall instabilities impacting mining operations; the most significant of which occurred in May
Jun 22, 2022
-
Blast Optimisation for Downstream Processes - Heavy ANFO in Small Diameter HolesWhilst employed by Dyno Nobel as the Technical Services Engineer û Brisbane, I was asked, as part of a contractual agreement, to look at optimising PioneerÆs blasting process to provide the most effec
Jan 1, 1999
-
Risk Assessment in a Long Term Mining Contract - The Contractor's ViewpointInternational tenders for contract mining opportunities require the Contractor to make an assessment of risk for an operation with a life span of up to twenty-five years usually based on data mad
Jan 1, 1986
-
BHP Port Hedland wind fence – innovations in dust controlBy R Peiffer, L van Wyk
The Port of Port Hedland is the largest bulk export terminal in the world and is one of Australia’s most important pieces of economic infrastructure. BHP is the largest Port user to support the export
Sep 18, 2023
-
Stochastic Production Scheduling – Solution through Langrangian Relaxation with the Branch-and-cut AlgorithmBy S Chatterjee
The production scheduling of an open pit mine determines the optimal extraction sequencing that significantly impacts a mine’s life as well as net present value. The optimisation of production schedul
Nov 24, 2014
-
Subordinate Structures – Considerations and BenefitsBy M J. Nugus
The structural models developed by exploration and mining geologists are most commonly concerned with the ‘main structures’ or key constituents that pertain to the associated mineralisation. To this e
Aug 22, 2011
-
Inferring the earth moving equipment–environment interaction in open pit miningBy M Balamurali
In mining, grade control generally focuses on blasthole sampling and the estimation of ore control block models with little or no attention given to how the materials are being excavated from the grou
Jun 22, 2022
-
Geotechnical Challenges in Narrow Vein MiningBy J Hadjigeorgiou
Narrow vein mining, as most types of mining, faces important geotechnical challenges. The specificity of geotechnical challenges in narrow vein mines stems from the nature of the deposits, which are o
Mar 26, 2012
-
Estimating Comminution Indices from Ore Mineralogy, Chemistry and Drill Core LoggingBy R Berry, J Hunt, T Kojovic
Geometallurgy aids the understanding of orebody variability through the integration of geological and processing information, thereby enabling spatial mapping of processing (eg comminution or separati
Sep 29, 2013
-
Paper No. 163. The Mining And Metallurgy of Copper, Silver, Lead, and ZincIn order that the processes seen may be followed in their proper 'order, the subject will be dealt with as follows, (1) Wallaroo and Moonta Mines; (2) Wallaroo and Moonta Mines Smelting Works; (3
Jan 1, 1907
-
Preparation of Mine Fill from Process Plant TailingsThis paper reports the advances made during the development of underground mine fill technology from circa 1960 to the present and, in particular, indicates where increased input from process plant me
Jan 1, 2006
-
Developing Mineral Reporting CompetencyBy J Coombes
The JORC Code lists the three core principles of Transparency, Materiality and Competency as fundamental to how mineral estimates are publicly reported. But where the principles of Transparency and Ma
Aug 22, 2011