Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Comparison of bubble coalescence time and thin film balance techniques in studying the interaction of flotation reagents and salt

    By G Bournival, Y Pan, S Ata

    A custom-made set-up that measures bubble coalescence time and the thin film balance (TFB) technique were used to explore the role of residual xanthate (potassium amyl xanthate, PAX) and salt (NaCl) o

    Aug 24, 2022

  • AUSIMM
    A process-based approach to mine rehabilitation decision making using Bayesian modelling and risk-based principles for dispersive spoil rehabilitation

    By E Thomas, L McCallum, G Dale, J Bennett, K Reardon-Smith, S Raine

    Sustainable closure of coal mines in Australia to a safe, stable, non-polluting condition remains one of the industry’s biggest environmental and social challenges. A significant proportion of mines i

    Jul 25, 2018

  • AUSIMM
    Geostatistics in the Statigraphic Orebodies at Mount Isa

    By Scott IR

    In stratigraphic orebodies, estimation of footwall and hangingwall location is often of more importance than grade estimation. Contoured grade estimates often produce smeared boundaries and the us

    Jan 1, 1986

  • AUSIMM
    Ore Selection and Sequencing

    By J E. Everett

    A block model of the orebody is used to plan a mine. The first requirement is to identify ore to be extracted, discarding waste, so as to meet target grade, generally in multiple analytes. Commonly, c

    Sep 5, 2011

  • AUSIMM
    The Technology of Management ù An Overview of Technological Advances in the Mining Industry

    The major technological advances of the last 30 years have profoundly reshaped mining practices. Machines keep getting bigger while productivity continues to increase and manning levels drop. These tr

    Jan 1, 2001

  • AUSIMM
    Geological Modelling and Bench Face Survey to Improve Blasting Fragmentation

    By E Gabriel, J C. Koppe, A Gomes and P Crispim, R Schaarsdmit, I Pablos

    Drill and blast (D&B) is one of the most important production operations in open pit mining. The resulting fragmentation of the D&B reflects in the downstream unit operation. Good fragmentatio

    Aug 24, 2015

  • AUSIMM
    Nova copper-nickel project optimisation of the copper rougher-scavenger circuit through advanced measurement and control

    By M Thompson, N Vines, Z Hearne, S Lam, G A. Gomes-Sebastiaõ, D van der Spuy

    Construction and commissioning of the Nova Copper-Nickel project of Independence Group was completed in late 2016. The plant is in the Fraser Range of Western Australia, about 120km east of Norseman a

    Aug 29, 2018

  • AUSIMM
    Implementing and Managing New Technologies in Mining

    A very wide range of technologies are utilised in the mining and processing of ores and a great deal of effort is expended in the development of ænew technologiesÆ to improve mining performance and ec

    Jan 1, 1998

  • AUSIMM
    Lead-Smelting Practice at the Port Pirie Works of the Broken Hill Associated Smelters Pty. Ltd.

    By Hughes J. C

    THE smelting plant consists of five large furnaces operating in the treatment of current flintered material, and one small furnace operating periodically in the treatment of copper dross and antimonia

    Jan 1, 1922

  • AUSIMM
    Mining Safety - The Lessons Learned but not Applied

    By J M TORLACH

    Learning is an iterative process, and we might reasonably expect that after more than a century of mining during an era of sustained technological development, (following a millenium or two of unrel

    Jan 1, 1992

  • AUSIMM
    Managing Coal Loss Using Blast Models and Field Measurement

    By P Brown, M Nagarajan, A Green, P Dare-Bryan

    Coal loss is an important issue at many coalmines, with losses of five per cent being common. The type of loss varies from mine to mine but is dependent on mine strata, the drilling and blasting proce

    Aug 24, 2015

  • AUSIMM
    Traceability of native seed for mine rehabilitation

    By A Grant, H Thomas, C Clarke, B Fuller

    Native seed and plants are often a core input into the rehabilitation process of mine closure. Native plant establishment rate and performance is a function of many input elements including seed quali

    Aug 2, 2023

  • AUSIMM
    Paste Backfill for Enterprise Mine

    By D Morrison, P Goodman

    The cycle time between adjacent stopes is critical to achieving the required production rate from 3500 Orebody; one of the Enterprise Mine orebodies. Current Mt Isa cemented fills require a 90-day cur

    Jan 1, 1998

  • AUSIMM
    Spontaneous combustion hazard assessment of McArthur River Mine waste rock

    By P Marianelli, J Theiler, B Beamish, A Spillman

    The presence of reactive pyrite in waste rock contributes to the hazard of spontaneous combustion in emplacement facilities as it acts as an initiator of self-heating at low ambient temperatures. Orga

    Jul 23, 2018

  • AUSIMM
    Performance of Different Constructive Solutions against Explosions in Full-scale Masonry Walls

    By M Chiquito, R Castedo, P Segarra, L M. López, J A. Sanchidrián, J Navarro

    The aim of this work is to assess the performance of different constructive solutions against explosions on the strength of masonry walls. The solutions tested, namely an external metal mesh, a glass

    Aug 24, 2015

  • AUSIMM
    Determining the Open Pit to Underground Transition – a New Method

    By P A. Grossman, J H. Rubinstein, M Brazil, D Whittle

    Many ore reserves are harvested by a combination of open pit and underground mining methods. In these cases, there is often material that could be mined by either method, and a choice has to be made.

    May 9, 2016

  • AUSIMM
    Iron RoadÆs Prediction of Magnetite Concentrate Production from the Central Eyre Iron Project

    By P J. Marsh, P J. Bartsch, N J. Semler

    Iron Road Limited is currently studying the feasibility of producing 20 Mt/a of high-grade (67 per cent Fe) magnetite concentrate from a 2.6 Bt resource (JORC) located at Warramboo on the central Eyre

    Aug 12, 2013

  • AUSIMM
    Presentation of the Presidents Award, 1976 to Elliott Sylvester Timothy O'Driscoll

    ADDRESS BY THE PRESIDENT OF THE INSTITUTE (MR. J. G. SYMONS) IN PRESENTING THE AWARD TO ELLIOTT SYLVESTER TIMOTHY O'DRISCOLLTim O'Driscoll comes from a mixture of Irish and Scottish stock. H

    Jan 1, 1977

  • AUSIMM
    Application of Fluidsied Bed Technology to Reduction of Australian Mangansse and Iron Ores

    By Brent A. D, Olsen a. H, Mayfield P. L J, Grazier P. E

    Concentrates produced from MnO2 and Fe203 ore fines have been targeted as potential feedstocks for direct metallurgical processing. Prereduction of pyrolusite-rich Mn02 sands to MnO has been investi

    Jan 1, 1995

  • AUSIMM
    A Producing Miner's View of DCF Methods in Mineral Valuation

    By McMahon D

    The approach to valuations at the Normandy Poseidon Group is a measured and methodical process that utilises skills sourced from a number of different disciplines. Whilst being subject to a strict

    Jan 1, 1994