Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Tailings regulation – a South Australian perspective

    By G B. Smith, G M. Marshall, A Querzoli

    The South Australian mining regulatory framework has adopted a performance based approach to the management of risk. This approach has been in place in South Australia for more than 10 years and is in

    Jul 23, 2018

  • AUSIMM
    Processing of Pisolitic Iron Ore at Mesa J

    Robe River Iron Associates (RRIA or Robe) is widely regarded as the worldÆs most cost-effective, consistent and reliable supplier of iron ore. It has been in operation since 1972 and globally is the f

    Jan 1, 2000

  • AUSIMM
    Analytical Fingerprint of Columbite-Tantalite (Coltan) Mineralisation in Pegmatites - Focus on Africa

    By A Gerdes, H BrStz, E GSbler, D Davis, F Henjes-Kunst, S Dewaele, T Graupner, T Oberthnr, M Sitnikova

    Following the United Nations initiative to fingerprint the origin of conflict materials, the German Federal Ministry for Economic Cooperation and Development has decided to fund a pilot study on colta

    Jan 1, 2008

  • AUSIMM
    Evaluation of Gravity Spirals for Beneficiation of Banded Haematite Jasper Iron Ore of India

    By D R. Venkatesulu, N K. Nanda

    Due to increased production of steel in India, the thrust is now on iron ore producers not only to enhance productivity from existing mines, but to look also into alternative resources, like lean grad

    Jan 1, 2009

  • AUSIMM
    Benchmarking – Does it have a Role in Improving the Performance of Mining Geology?

    By M Berry

    Many mining companies routinely use benchmarking to review their operational activities and associated costs. The aim is to measure operational performance against industry norms, and identify areas w

    Aug 18, 2014

  • AUSIMM
    Justifying Slope Design Risks and Costs

    By N M. Player, R P. Varden, E Jones

    "An effective geotechnical design provides an accurate and appropriate assessment, balanced with a mining company’s risk profile. Justifying the cost of slope assessment requires an understanding of t

    Nov 15, 2016

  • AUSIMM
    The Median versus the Mean Fragment Size and Other Issues with the Kuz-Ram Model

    By F Ouchterlony

    Soviet precursors to Cunningham’s Kuz-Ram model from 1983 are described. They are rooted in the mean fragment size and Rosin-Rammler (RR) fits to sieving data and rely on approximations. Three version

    Aug 24, 2015

  • AUSIMM
    New Methods for Mapping the Structure of Rock Masses

    Remote sensing techniques can be used to map joint sets in a rock mass for the estimation of in situ block size distribution and improved optimisation of blasting. This paper reviews remote sensing us

    Jan 1, 2001

  • AUSIMM
    Olympic Dam mine closure planning process

    By G Hill, D Grant, M Tyler

    Located approximately 570km NNW of Adelaide in South Australia, the Olympic Dam mine (OD) is the world’s fourth largest remaining copper and gold resource and the largest uranium resource. Discovered

    Jul 25, 2018

  • AUSIMM
    Oversize Reduction Project at the Iron Ore Company of Canada

    By R Pinksen

    The Iron Ore Company (IOC) of Canada Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1 m × 1 m × 1 m) being produced and its subseque

    Jul 11, 2011

  • AUSIMM
    Instantaneous Outbursts of Coal and Gas - A Review

    Instantaneous outbursts of coal and gas have occurred in Australia in the Sydney Coal Basin since 1895 and in the Bowen Coal Basin since 1954. The largest has been about 500 tonnes of coal and so thei

    Jan 1, 1983

  • AUSIMM
    The Dispersion of Kaolinite

    By X Ma

    Kaolinite is of very fine particle size in nature and thus its dispersion plays a key role in the successful removal of kaolinite in iron ore flotation and selective flocculation processes. As the mos

    Jul 11, 2011

  • AUSIMM
    Kwinana Nickel Refinery the First Year's Operation

    The history of the discovery and development of the Kambalda nickel orebody. is reviewed and the decision to process the Kambalda concentrates by the Sherritt-Gordon process at Kwinana is discussed.

    Jan 1, 1971

  • AUSIMM
    Integrated Industry Relevant Research Initiatives to Support Geometallurgical Mapping and Modelling

    By S Walters

    The emerging discipline of ‘geometallurgy’ is not new but is becoming increasingly recognised as a discrete and high-value activity. Geometallurgy involves a quantified and spatially constrained appro

    Sep 5, 2011

  • AUSIMM
    Characterising the Reasons for the Difference in Performance of Two Ore Blends in Early Processing at OZáMinerals Prominent Hill Operation

    By D J. Bradshaw, E M. Wightman, C L. Evans, B Triffett

    During the commissioning phase of Prominent Hill, periods of reduced recovery were experienced with higher-grade ore blends. This was unexpected and as part of the process to identify the cause, surve

    Oct 29, 2012

  • AUSIMM
    Energy complexities in complex orebodies

    By M Ziemski

    The provision and management of energy in both fuel and electricity forms is an increasingly important consideration for mines. Pressures from communities, governments and markets are increasing towar

    Nov 21, 2018

  • AUSIMM
    A Dynamic Ore Reserve Calculation and Accounting System for a Stratiform Orebody

    By Jaczkowski B

    The lower orebody (LOB) at Chingola Divi- sion of Nchanga Consolidated Copper Mines Limited (NCCM) accounts for approximately 30 per cent of the total copper production for the company. The uniform

    Jan 1, 1977

  • AUSIMM
    Reducing WAD Cyanide at the Discharge Spigot

    By M L. Habner, S D. Munro

    In a gold CIP/CIL circuit, adding new circuit water to a final tails thickener and then directing the thickener overflow to the head of the circuit significantly reduces the cyanide concentration at t

    Jan 1, 2007

  • AUSIMM
    Risk Analysis in Open Pit Mine Planning

    Sophisticated pit optimisation software has allowed mine planning engineers to generate mining outlines that consider the numerous factors that have a major effect on the success or otherwise of a min

    Jan 1, 1998

  • AUSIMM
    Advances in Flotation Process Control at Porgera Gold Mine Using JK FrothCam Imaging Technology

    The Porgera gold mine has made significant progress with the successful installation of a JK FrothCam image analysis system. The system is used to measure and control froth velocity on the scavenger c

    Jan 1, 2003