Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A study of heat and material balances in direct reduction plant with various conditions

    By H Kim, M J. Sun

    Global steel companies are actively combating climate change by reducing carbon emissions. Traditional steel production, using the blast furnace (BF) – basic oxygen furnace (BOF) process, heavily depe

    Aug 21, 2024

  • AUSIMM
    Refurbishment of Brisbane's Rail Tunnels for Electrification

    By Fejes G

    An integral part of the Brisbane Suburban Railway Electrification involved the relining, refurbishment and track lowering in the Roma Street, Brunswick Street and Gloucester Street double track tu

    Jan 1, 1981

  • AUSIMM
    Mechanical and Electrical Maintenance as Practised in Mount Isa Mine Lead (No. 2) and Copper (No. 4) Concetrators

    This paper describes the mechanical and electrical maintenance activities as practised at Isa Mine. The principles of preventative maintenance adopted are described as well as the basis of mainten

    Jan 1, 1978

  • AUSIMM
    Variability of Gravity Recoverable Gold Values in Relation to Test Sample Size

    By S C. Dominy

    The gravity recoverable gold (GRG) parameter reflects liberated gold or gold-dominated composite particles that can be recovered by gravity separation. Recoveries depend upon mineralogy, in situ parti

    Sep 29, 2013

  • AUSIMM
    Rock Mass Characterisation and Analysis for Excavation Design – A Discrete Fracture Network Approach

    By F M. Weir, M Fowler

    The design of excavations in rock must, implicitly or explicitly take into consideration the influence of small- and large-scale geological structures. For most sites the complexity of a fractured roc

    Nov 5, 2014

  • AUSIMM
    Beneficiating a Low Yield Coking Coal at Iscor's Grootegeluk Coal Mine

    The Grootegeluk coal beneficiation plant is situated near Ellisras in the Waterberg coal= field in the Transvaal, RSA. At this plant 15 million tons of coal bearing material per annum are benefici

    Jan 1, 1987

  • AUSIMM
    Olympic Dam Operations Review

    The Olympic Dam copper/uranium deposit was discovered in 1975 and subsequently commenced production in 1988 at a rate of 1.5 Mtpa using the sublevel open stoping mining method. In the following five y

    Jan 1, 1998

  • AUSIMM
    Design and Operation of Backfill for Reliable High Solids Concentration Discharge

    By A G McLean

    This paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying p

    Jan 1, 1998

  • AUSIMM
    Optimum Priming Systems for Ammonium Nitrate/Fuel Oil-Type Explosives

    Conflicting claims and views on the priming of ammonium nitrate/fuel oil (ANFO) are reviewed; certain fallacies and misconceptions are rectified. Optimum priming systems for a range of blasthole co

    Jan 1, 1974

  • AUSIMM
    Driving Future Tunnels with Mechanical or Explosion Energy - A Blasting Engineer's View

    The current drill-and-blast method of tunnelling is cyclic and, for this reason above all others, has a future application potential which is lower than that of continuous methods. There is scope

    Jan 1, 1987

  • AUSIMM
    Fluid Inclusions and Sulfur Isotopic Studies from a Possible Southeast Extension of the Toyoha Polymetallic Deposit, Japan

    Fluid inclusions and sulfur isotopic compositions were studied in a possible extension of the Toyoha polymetallic vein deposit. The objective of this work was to gain a better understanding of the ore

    Jan 1, 2002

  • AUSIMM
    Remediation of Wall Failure at Kalgoorlie Consolidated Gold Mines’ Golden Pike Cut-back 2016

    By J Darbritz

    "This paper details the events leading up to a slope failure that occurred at Kalgoorlie Consolidated Gold Mines (KCGM) and the remediation method executed using rope access specialists.n January 2016

    Nov 15, 2016

  • AUSIMM
    A Comparison of Two Methods for Calculating the Constants K and Alpha in a Broken Ore

    By R Minnitt

    Two methods of calibrating the parameters K and Alpha for use in Gy’s formula for the fundamental sampling error were investigated. Approximately 480 kg of broken ore from Harmony’s Target gold mine i

    Jul 29, 2014

  • AUSIMM
    Challenges and solutions for deformation management of Cannington’s hoisting shaft

    By A Clarkson

    Cannington Mine is an underground silver lead zinc operation located in north-west Queensland which has been in production since 1997. Ore is primarily moved through an underground material handling s

    Mar 29, 2023

  • AUSIMM
    Heavy Medium Separation at Iscor's Sishen Iron-Ore-Mine

    The Sishen iron-ore-mine produces 3 pro= ducts with size gradings of 25 to 8 mm, 11 to 5 mm and 5 to 0,2 mm and has a product capacity of 20 Mtpa. Ore is produced at an average Fe content of 66,2

    Jan 1, 1987

  • AUSIMM
    Iron Ore Tailings Reprocessing to Maximise Ore Production

    By I Sherrell, R Jain

    Worldwide iron ore feed grades are trending downwards and will continue to do so with the increasing difficulties of upgrading ores. This has led to operations looking for ways to capture current tail

    Jul 13, 2015

  • AUSIMM
    Drilling and Blasting to Achieve Lower Costs for Deeper Stripping

    By Lemberg D. W, Friday R. G

    Potential means of lowering overall costs to permit deeper stripping include : 1. the use of larger diameter blastholes in highly-fissured strata (to reduce drilling costs); 2. dewatering from semi-

    Jan 1, 1981

  • AUSIMM
    Gold Room Procedure at Lake View and Star, Ltd.

    Recovery of gold by smelting zinc dust concentrate has been carried on at Lake View and Star, Ltd., since July, 1930, when the Merrill-Crowe precipitation plant was first put into operation.Part I des

    Jan 1, 1948

  • AUSIMM
    Determination of Gas Content of Coal Seams

    By Bartosiewicz H

    A method for the determination of the gas content of coal seams is presented which improves upon existing methods. The method makes use of a gravitational technique for measurement of the gas deso

    Jan 1, 1982

  • AUSIMM
    Zinc Recovery From Commercial EAF Dust by the Iron-Reduction Distillation Process

    By A Kyllo a, D R. Swinbourne

    Electric arc furnace (EAF) dusts contain significant quantities of zinc, found almost entirely as either zinc oxide or zinc ferrite. The dust has been classified as a hazardous waste due to the relati

    Jan 1, 2000