Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Observations From the Magazine Dump Clay Capping Trial

    By D Ray, D Brett

    A clay-capping trial was established in 1996 on Magazine Dump at the Mt Lyell Copper Mine. The trial was initially constructed under the Mount Lyell Remediation Research and Demonstration Program, a c

    Jan 1, 2003

  • AUSIMM
    Large Event Sequence Analysis and 3D Velocity Models for Seismic Event Location Accuracy

    By D S. Collins, Z Hosseini, I Pinnock, Y Toya

    Microseismic monitoring is regularly used in the mining and geotechnical industries to provide detailed information about rock mass response to operational activities. This paper implements a variable

    May 9, 2016

  • AUSIMM
    The Chemical Basis of Flotation (4f77fd10-2462-403e-873d-32f147f6cfd3)

    Dr Wark said: I have not come to Broken Hill to tell you how to conduct flotation operations; indeed, during my short stay here I have already learned much concerning the process, of the many difficul

    Jan 1, 1994

  • AUSIMM
    Systems Analysis Tools for Promoting Effective Energy/Minerals Partnerships

    By M Stewart, J Petrie, L Basson

    This paper explores tools which have the potential to promote and assess the formation of partnerships between the minerals and energy industries to enhance the economic, environmentally responsible a

    Jan 1, 2004

  • AUSIMM
    Dynamic grade control modelling processes at the Waihi Underground Gold Mine

    By A Whaanga, W Vigor-Brown

    IGO Ltd’s (IGO’s) Nova-Bollinger Deposit (Nova-Bollinger) is a magmatic nickel-copper-cobalt (NiCu-Co) sulfide deposit found 160 km east-north-east of the town of Norseman in Western Australia (WA). T

    Mar 22, 2022

  • AUSIMM
    Optimisation Opportunities for High Pressure Grinding Rolls Circuits

    By B Davis, A H. Benzer, A N. Mainza, C M. Evertsson, L M. Tavares, M M. Hilden, M S. Powell, C Rule, G Asbj÷rnsson

    The Mogalakwena North Concentrator of Anglo Platinum Operations was built with the capability to allow for future projected expansion. Several research groups, currently working with Anglo American on

    Oct 29, 2012

  • AUSIMM
    Reducing the Effect of Wind on Airblast Measurement During Blasting

    By K Henley

    One of the greatest practical difficulties of measuring airblast occurs when a significant wind is blowing onto the microphone. Small windscreens are usually used to mitigate the wind noise on the mic

    Aug 24, 2015

  • AUSIMM
    Driving Haulage Productivity Improvements through Industry–Academia Collaboration

    By R Thompson, J Miedecke, D Handel, E Tomicek, D Tulloch

    "The Mine Haul Road Optimisation Alliance (HROA) is a unique Australian industry–academia collaboration that has been developed to support mine haul road operators. The alliance integrates industry, e

    Nov 15, 2016

  • AUSIMM
    The Spatial and Temporal Variation of the Type and Rank of Australian coals

    Commercial or potentially commercial deposits of coal occur in Australia in strata ranging in age from Permian to Tertiary. The coals of each period tend to show a community of petrographic character

    Jan 1, 1975

  • AUSIMM
    Petrology of the Broken Hill Lode and its Bearing on Ore Genesis

    LIST OF CONTENTSAbstractIntroductionSelected Sections of the Broken Hill LodeLocality PlansPetrology1. Zinc Corporation Mine: DDH. 5.98, section 30, No. 26 level2. Zinc Corporation Mine: DDH. 838, sec

    Jan 1, 1959

  • AUSIMM
    Enhancing geoscience model confidence via digital twins – integrated modelling, simulation, and machine learning technologies

    By M Liang, C Putzmann, D Gokaydin

    The mining industry faces numerous challenges in swiftly evaluating and exploiting new mineral deposits to meet the escalating demand for critical minerals and metals. These challenges necessitate the

    Sep 1, 2024

  • AUSIMM
    The coalmine roof rating – an update in its calculation and mechanistically why it works

    By M Colwell

    The Coal Mine Roof Rating (CMRR) is a rock (roof) mass classification (RMC) system/index that was originally developed by the United States Bureau of Mines (USBM) for aspects of underground coalmine g

    Nov 29, 2022

  • AUSIMM
    Realisation of Value through Identification of Various Oxidation Fronts and Mineralisation Styles at Trilogy Cu-Au-Ag-Pb-Zn Deposit

    By B Armstrong

    The Proterozoic poly-metallic Trilogy deposit was discovered in 1997, and until recently, mining evaluation was stalled due to poor metallurgical performance. Unlocking the substantial economic value

    Sep 5, 2011

  • AUSIMM
    Tube bundle analyser flow rate, why it is important

    By M Tsai

    Tube bundle gas monitoring systems have been used in the mining industry for over 50 years. The initial design was based on four individual gas analysers along with a series of solenoid valves, gas sa

    Oct 12, 2022

  • AUSIMM
    Towards the Implementation of Discrete Fracture Network Modelling as a Geotechnical Design Tool – Case Study of Callie Underground Mine

    By S F. Rogers, K Doumis, J H. Graaf, B J. Barsanti

    Advances in technology now allow geotechnical practitioners to better describe the properties and variability of a rock mass through advances in surface and underground mapping, borehole technology an

    Nov 5, 2014

  • AUSIMM
    Some Practical Problems in Running Statistically Valid Plant Trials, and Their Solution

    Operating metallurgists spend a significant part of their time running plant trials to compare two or more conditions in order to improve the process, such as a new reagent, flow sheet or piece of equ

    Jan 1, 2008

  • AUSIMM
    An Approach to High Solids Slurry Pipeline Design

    By M Griffiths

    This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she

    Aug 8, 2011

  • AUSIMM
    Milling Methods and Cost at the Concentrator of the Mount Isa Mines Ltd., Mount Isa, Q.

    LOCATIONThe property of the Mount Isa Mines Ltd. is situated in Western Queensland, 603 miles by rail west of Townsville, the nearest seaport. All supplies and the bullion are railed between Mt. Isa a

    Jan 1, 1933

  • AUSIMM
    The Physical Chemistry of Carbothermic Reduction of Sulphide Minerals: 'A Novel Metal Production Route'

    By Grieveson P, Terry B. S

    Carbothermic reduction of sulphide minerals for achieving a selective separation of metallic species from complex minerals has been discussed by considering the prevailing oxygen potential during th

    Jan 1, 1992

  • AUSIMM
    Selection Criteria for Open Pit Production Equipment û Payload Distributions and the æ10/10/20Æ Policy

    By R J. Hardy

    The aim of this study is to examine the volumetric and mass movement characteristics of load and haul operations using statistical modelling of relatively large samples of bucket loads that are transp

    Sep 26, 2011