Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Potential Use of Mine Fire Simulation Software as an Enhancement for Mine Safety and Mine Rescue TrainingBy C Slaughter, J C. Tien
Commonly held ideas about effective training have long emphasised the importance of realism. Realistic training builds better experience among the trainees and a better perspective on the training mat
Aug 31, 2015
-
Fluid Bed Roasting at Mount ISABy Casley G. E, Pritchard J
A single slurry fed fluosolids roaster was chosen to replace six multiple hearth roasters in the Copper Smelter at Mount Isa as part of the overall program to increase production from 100 000 to 15
Jan 1, 1974
-
Construction and monitoring of development access into highly stressed rock massesBy R Talebi
A research project to better understand the rock mass behaviour and the seismic response has been conducted during the design and construction of the 9215 level at the E-Block sector of the Northern S
Mar 29, 2023
-
Geothermal gradient determination for ventilation and air conditioning modelling at Malmberget MineBy F K. R Klose
Malmberget is a sublevel caving mine owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB), a Swedish state-owned iron ore mining company, in northern Sweden. The mine has an annual iron or
Oct 12, 2022
-
Traffic and Emission Modelling for Surface Roads near the Lane Cove Tunnel CorridorThe Lane Cove Tunnel (LCT) is an important infrastructure link in New South Wales (NSW) and runs from the end of the Gore Hill Freeway at Artarmon at its eastern extremity, to the end of the M2 at Nor
Jan 1, 2008
-
Application of Engineering Discipline and a Full-process Optimisation Focus – Productivity to Profitability without Profuse PruningBy W R. Adamson
"Optimisation of drill and blast design and engineering can deliver a significant positive impact on the profitability of any mining operation; however, true engineering of the blasting process is les
Aug 24, 2015
-
Surface Mining and Legacy Mining Communities in South Wales, UKBy R N. Humphries, R J. K Thompson
Large-scale coal mining in South Wales dates back to the late 18th and early 19th centuries with the birth of ironmaking on an industrial scale. This rapidly gave rise to new and large communities wit
Jul 16, 2014
-
DeGrussa Copper Mine, Western Australia - Feasibility to First Production: A Case Study in Developing a Working Geometallurgy Model from First PrinciplesBy P Vass, C Butler, J Condon, B Hooper
DeGrussa Copper Mine, resource status 10.2 Mt at 5.7 per cent Cu, 2.1 g/t Au (Sandfire Resources, 2013), commenced concentrate production through its 1.5 Mt/a conventional copper flotation processing
Sep 29, 2013
-
The critical role of mine planners in the evolution of closure at BHPBy J Heyes, R Getty, M Sanapala
Closure is an inevitable part of the life cycle of every mine. Successful closure outcomes critically depend upon early and ongoing integration of closure planning and mine planning. Early and holisti
Sep 18, 2023
-
A guide to reporting Mineral Resource exclusive of Mineral ReserveBy H Arvidson, V Chamberlain, R Marinho, B Parsons, T Rowl, M Noppé, M Mattera
With the introduction of CRIRSCO (2019) based mineral asset disclosure, Regulation S-K part 1300, 2019 (S-K1300) by the United States (US) Securities and Exchange Commission (SEC), applicable to compa
May 24, 2023
-
Improving Flotation Performance in the Good, the Bad and the Ugly Economic Times û The Century StoryBy D Obeng, D Alexander
Over the past five years, commodity prices have been high and the focus of many plants has been æthe more metal the better, at whatever costÆ. In the recent economic crisis, the focus has shifted more
Jan 1, 2009
-
Improving the performance of blind uphole rises at Ernest Henry Mine – a case studyBy T Purvis, Z Liu
Ernest Henry mine (EHM) is an underground sublevel caving mine located in north-west Queensland with a production rate of 6.4 Mt/a. The mine has sublevels spaced with a 25 m vertical interval. The pro
Oct 16, 2017
-
Deformation of Retreat Gatroad in Interpanel-Pillar SystemBy Ichinose M, Tsuru T, Gotoh K
Since 1980, the Department of Mining Engineering at Kyushu University, in co-operation with the Ikeshima Colliery, Matsushima Coal Mining Co. Ltd., has been conducting a research project into longw
Jan 1, 1992
-
The Design, Installation and Commissioning of the Northparkes MinesÆ Lift 2 Ground Handling SystemBy I Ross
The ground handling system needed for the second lift of the underground block caving operation at Northparkes Mines had to link into the existing infrastructure. Production requirements indicated tha
Jan 1, 2005
-
Development of a nitrogen prediction model for 320 tonne converterBy Y D. Jeon, K S. Kim, C-H Eom, C M. Yoon
The carbon neutrality continues to require reduction of carbon usage in ironmaking and steelmaking processes. Specially, it is expected that the hot metal ratio (HMR) in the steelmaking process should
Aug 21, 2024
-
Telfer Project Process Plant DesignBy R Dunne, G Lane, S Ha, D Dreisinger
The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine
Jan 1, 2003
-
The Effect of Inter-Hole Timing on HeaveBy Grant J
In surface mining, significant improvements in efficiency can be obtained through greater control over the formation of the muckpile. By tailoring the muckpile shape and its looseness to the requir
Jan 1, 1988
-
Upgrading the Gravity Circuit at Marvel LochBy W Newton, J Price
This paper outlines the design, justification and performance of a gravity circuit upgrade at the Marvel Loch treatment plant. The design of the upgrade was simple but effective. The key components of
Jan 1, 2000
-
Procuring Control and Intelligent Traffic Systems for Major New Build Projects – Avoiding Pitfalls and Maximising ValueBy G M. Taylor
The application of high technology to monitor and control fire life safety, critical functionality in tunnels and underground spaces generally has progressed at an ever accelerating rate over the past
Sep 17, 2014
-
Beyond Grade Control - Broken Links in the Chain of ValueBy A Weeks an, R Bertinshaw, S Khosrowshahi
Good mining is central to any approach to value tracking. Good mining occurs where the ore is correctly delineated, measured and fed to the mill. This process is usually referred to as grade control,
Jan 1, 2002