Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Spatial distribution of geohazards in Western Australia and Imposed risks to tailings storage facility inventoryBy J Penman, N Turner, H Liu
This paper aims to present a snapshot of the risk profile for tailings storage facilities within Western Australia by comparing the spatial distribution of known facilities against common geohazards s
Jul 1, 2021
-
Maximise Orebody Value through the Automation of Resource Model Development Using Machine LearningBy S Oliver, D Willingham
"Although a resource model is central to the mineral resource value estimation process (Glacken and Snowden, 2001), creating it is a labour intensive task and in the end it is a limited representation
Jun 15, 2016
-
Planning the Extraction of the Lead Orebodies Below 15 Level at Mount IsaBy Clifford C. E
The Black Star and Racecourse orebodies below 15 level contain a major portion of the primary silver-lead-zinc ore reserves of 56 million tonnes at 150 g/t Ag, 6.4% Pb and 6.5% Zn at Isa Mine. Extr
Jan 1, 1979
-
Mineral project risk and orebody knowledge – quantifying the value of drilling using decoupled net present value analysisBy D Espinoza, I Rees, J Pocoe, P Collier
P Collier, I Rees, J Pocoe and D Espinoza
Mar 22, 2022
-
Integrated Planning, Mining and Rehabilitation for Effective Results and Sustainable Land Use - A Western United States PerspectiveBy V Pfannenstiel
The United States (US) coal mining industry has been working under comprehensive planning, operating and rehabilitation regulatory requirements for nearly 35 years. The public desire for environmental
Jul 10, 2012
-
Discovery and Geology of the McPhee Creek Iron Deposit, Northern Pilbara, Western AustraliaBy J D. Goldsworthy
The McPhee Creek bedded iron deposit is a recent discovery made by Giralia Resources NL (Giralia) in the northern Pilbara of Western Australia. The deposit lies 30 km north of the town of Nullagine al
Jul 11, 2011
-
Productivity Enhancement Driver Assistance for Mining Machinery Based on Unique Two-Dimensional Radar Sensor Fusion ConceptBy C Augustin, M Hahn, K Nienhaus
Operators of mining machinery like haul trucks or excavators have very limited information about the exact distance to other equipment as well as to the natural boundaries like berms, walls and struct
Sep 26, 2011
-
Ranges of Validity of Some Distribution Functions for Blast-fragmented RockBy J A. Sanchidrián
The general ranges of validity of some distribution functions are assessed from their behaviour with 119 sets of fragmentation data from bench blasting obtained by sieving. The emphasis is on determin
Aug 24, 2015
-
Pillar Recovery at Cracow Gold Mine using Grouted Consolidated MullockBy V Mutton, L Potts, D Joyce
This paper describes the method of extracting sill pillars within the underground operation from under unconsolidated mullock fill at the Cracow Gold Mine. This pillar recovery method was initially su
Mar 26, 2012
-
The Re-opening of CSA Mine, Cobar NSWBy M Scamardella
The CSA Mine is located at Cobar, New South Wales, where it was in continuous operation from 1966 to the time it went into receivership on 29 January 1998. When it closed it was under the ownership of
Jan 1, 2000
-
Open Issues in Tunnel Boring Machine Excavation of Deep TunnelsBy G Barla
In Europe, a major interest in the infrastructure and tunnelling fields is in the new crossings of Alps in the form of base tunnels, which are important components of the high-speed (for passengers)/h
Mar 8, 2011
-
Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal ReefsBy J J. Laas, A J. S Spearing
Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Vaal
Jan 1, 1998
-
Plan Implementation ù How Communication Impacts on Securing Organisational Success in the 21st CenturyBy W Roy
When it comes to plan implementation and securing success in organisations in the 21st century, if there was such a thing as the secret to success it would be effective communication. Commoditisation
Jan 1, 2006
-
Geotechnical Challenges for Underground Commercial Space and Quarrying in AustraliaBy A B. Bayooke, A C. Robertson
In terms of underground tunnelling in metres advance per capita, Australasia compares well with the best world performers. This is because of the large number of metalliferous mines, coalmines and civ
Nov 5, 2014
-
Application of SMELT-2 Package to a Study of Continuous Converting in Sirosmelt ReactorsBy Denholm W. T
The SMELT-2 package is specifically designed to perform on-line simulation of smelting processes. This paper describes its application to the simulation of continuous matte converting followed by r
Jan 1, 1989
-
Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal Reefs (Minefill '98)By Laas JJ, Spearing AJS
Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Va
Jan 1, 1998
-
Sodium Removal from Heat and Leach Process Treated Zircon SandsBy K J. McDonald
All commercially available zircon sands contain radioactivity sourcing from the decay of trace amounts of contained uranium (U) and thorium (Th). The fine particle size zircons of the Horsham area in
Jan 1, 2001
-
Structural Controls and Strain Partitioning in the Red October Gold Mine, Western AustraliaBy D Howe, J Conn, J G. McLellan, K Gates
The Red October Gold Mine, owned by Saracen Gold Mines Pty Ltd, is located approximately 80 km south of Laverton, Western Australia. It is considered to be of a similar nature to many of the Archaean
Aug 18, 2014
-
Improving drill productivity and delivering better geophysical data fasterBy T A. J Hopper, S Mukkisa, K-O Ott, D Palmer
RIG Technologies has developed new technology that can successfully acquire high quality natural gamma ray (GR) and hole deviations, downhole while drilling, on reverse circulation drills. This techno
Nov 8, 2021
-
Introduction of and Experience Gained with Cemented Hydraulic Fill at the Gossan Hill Mine, Western AustraliaBy E M. Jones
On 26 June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19 000 m3 of saturated hydraulic fill into the
Jan 1, 2008