Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Feasibility to Mine Completion – The Real Impacts on Project Economics

    By J Ranford, A Harris, K Laughton

    The Angas Zinc Mine (Angas) is a poly-metallic, underground mine in the Adelaide Hills that has been developed through arguably one of the most volatile financial time periods in living memory. From b

    Mar 24, 2014

  • AUSIMM
    Plant Improvements and Cost Reduction at the Great Boulder Proprietary Gold Mines Limited

    By Harris J. W

    Mr. Gillie and Mr. Harris have given us a wealth of information and food for thought on the vital subject of information and food fo rthought on the vital subject of reducing costs and mention conside

    Jan 1, 1956

  • AUSIMM
    Managing Geotechnical Risk Through Non-Destructive Rock Reinforcement Testing Trialled at the George Fisher Mine, Mt Isa

    Corrosion affects the performance of rock support and reinforcement at various underground mines, including the George Fisher Mine, where recent studies showed that this risk to mining operations is g

    Nov 25, 2010

  • AUSIMM
    A Modified Software Tool for Mine Waste Rock Dump Planning

    By Z Fu, E Topal, O Erten

    "Mine waste rock management involving waste rock movement and placement, is a critical aspect in the planning of open pit mining operations, as the waste rock haulage cost can be the largest portion o

    Nov 15, 2016

  • AUSIMM
    Using SAP Business Objects to Deliver Actionable Information for Operators to Management

    Real-time data collection and plant historians are becoming common place in mining and processing plants. This vast quantity of data must be turned into easily accessible and actionable information fo

    Sep 26, 2011

  • AUSIMM
    Automated Production Data Collection and Reporting at a Large Open Pit Mine

    By T Mattiske

    The Fimiston Open Pit (commonly referred to as the æSuper PitÆ) is a part of the Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) operation in Kalgoorlie-Boulder. KCGM manages the Fimiston Open Pit,

    Jan 1, 2002

  • AUSIMM
    An Integrated Geology-Mine-Plant and Eco-Efficiency Simulator for Anglo Platinum's Evaluation and Operational Improvement Initiatives

    An Integrated Geology-Mine-Plant and Eco-Efficiency Simulator for Anglo Platinum's Evaluation and Operational Improvement Initiatives

    Sep 13, 2010

  • AUSIMM
    Cape Lambert Upgrade Project

    By S Russell

    The completion of the $1.1 B Cape Lambert Upgrade project is the second ‘pillar’ in Rio Tinto Iron Ore’s expansion program that has enabled Rio Tinto Iron Ore to effectively double iron ore shipping c

    Jul 11, 2011

  • AUSIMM
    The Evolution of Wall Control Programs at Kidston Gold Mines

    By A Marton

    Concerns with crest losses have seen changes to a number of design and operating parameters to retain the integrity of the wall and the berms of the Kidston Gold MinesÆ Eldridge Pit. Until trials bega

    Jan 1, 2001

  • AUSIMM
    Managing the Diamond Drilling Interactions in Commissioning the Ankata Underground Mine

    By L Sandery, S Light

    Within 22 months of commencing decline development, the Prominent Hill Ankata Underground Project achieved its full production rate of 1.2 Mt/a.In 2010 construction of the Ankata Underground Project w

    Mar 24, 2014

  • AUSIMM
    Development of Inhibitors to Reduce the Spontaneous Heating Susceptibility of Indian Coals

    By R S. Sing, M D. Yadav, G Udaybhanu

    This paper presents the results of the first part of a research project to study the effect of various inhibitors to reduce the spontaneous heating susceptibility of some highly susceptible Indian coa

    Jan 1, 2005

  • AUSIMM
    Pongkor Gold Mine (Indonesia) ù Changing From Traditional Handheld Cut and Fill to Mechanical Cut and Fill

    The Pongkor Gold Mine employs 678 staff. The mine is owned by the Indonesian state company PT Antam Tbk and is located 100 kilometres south west of Jakarta, in Java, Indonesia. Mine and infrastructure

    Jan 1, 2002

  • AUSIMM
    Design of Grade Control Sampling Programs for Underground Gold Mines

    By S C. Dominy

    Grade control programs aim to deliver economic tonnes to the mill via accurate definition of ore and waste. The foundation of a successful program is high quality sampling supported by geology and a s

    Aug 22, 2011

  • AUSIMM
    Assessment of Mill-Feed Sampling Strategies Based on a Variographic Experiment

    By K L. Olzard

    At the WMC Resources Phosphate Hill operation, monitoring the quality of the ore delivered by the mine to the beneficiation plant is of prime importance to ensure the fertilizer is produced cost-effec

    Jan 1, 2005

  • AUSIMM
    Predicting and modelling Bond Work Index using chemistry (as a proxy for mineralogy)

    By K Gardner, R Fraval, V Singh

    Using new technology to create optimised infill drill programs in underground or open pit settings, it is possible to quantify the value of a drill program. The computer designed programs are optimise

    Mar 22, 2022

  • AUSIMM
    A System of Diluting Methane to Safe Levels

    By R Hughes

    "Spring Creek Mine uses high pressure water to extract the thick Main seam in the Upper Rewanuicoal measures. The extraction method results in the creation of large voids which collapsespontaneously.

    Jun 1, 2012

  • AUSIMM
    Superior Productivity and Margins Using Modern Mining Management Systems

    With commodities suffering dramatically low real prices, mining business margins are under intense scrutiny. Unfortunately, management systems developed early this century for manufacturing are drivin

    Jan 1, 1999

  • AUSIMM
    Pre-Strip-Mining by Bucket Wheel Excavators

    Dragline performance drops considerably when chop-down and double handling of material is needed due to increasing overburden thick- ness or total pit depth. Beyond a certain pit depth the dragline

    Jan 1, 1981

  • AUSIMM
    Dynamic drop testing of Sandvik’s D47 and D39 MDX bolts at the Swerim’s testing facility

    By B Darlington, L Sandberg, O Vallati

    The D47 and D39 Mechanical Dynamic Extra bolts (D47 MDX and D39 MDX) have been developed in response to the ever-increasing demand from the mining industry for rock bolts with high dynamic capacity. T

    Nov 29, 2022

  • AUSIMM
    Proneness of competent over-stressed intact rock to violent fracturing

    By B L. Sainsbury, M F. Lee, A Penney

    For most practical rock engineering purposes, stress versus strength conditions around underground openings for which rock masses fail and their various modes of failure, are reasonably well-understoo

    Nov 30, 2018