Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Primary Framework for the Mechanism of the Mine Reclamation Monitoring in China

    By Y Zhou, Y Liu, J-P Yang, P Wang, K Hu

    "Large-scale mine reclamation has taken place recently in response to the implementation of mining regulations in China. Effective monitoring of the progress of reclaimed land is a critical procedure

    Jul 10, 2012

  • AUSIMM
    Some Considerations in the Mining of Saddies, Spurs and Backs on the Bendigo Goldfield

    Any future developer of underground mining on the Bendigo goldfield will need to understand the unique geology and gold occurrence of this field. The development and sloping system employed will be pr

    Jan 1, 1993

  • AUSIMM
    Application of SLon Magnetic Separators in Modernising the An Shan Oxidised Iron Ore Processing Industry

    The An Shan iron ore deposit is the biggest low-grade oxidised iron deposit in China. Over the past ten years, about 120 SLon verticalring-pulsating high gradient magnetic separators units have been i

    Jan 1, 2009

  • AUSIMM
    Olympic Dam Operation - An Overview of Underground Design and Planning

    Olympic Dam Operation is located in the Stuart Shelf Geological Province approximately 520 km north-north-west of Adelaide in South Australia. It is estimated to be one of the worldÆs top five copper

    Jan 1, 1999

  • AUSIMM
    Characterisation and Beneficiation of Low-Grade Indian Iron Ore Fines

    By P K. Banerjee, S Kumar

    Indian iron ores with less than 62 per cent Fe are currently unexploited, except for a few sectors which export them to foreign countries. It is anticipated that by 2012 the countryÆs domestic steel p

    Jan 1, 2007

  • AUSIMM
    Measuring ore quality using real-time on-belt elemental analysis – more than grade control

    By H Kurth

    Mining geologists utilise many technologies to map, sample, measure, model and plan before and during the mining process. Predicted ore quality rarely corresponds with feed quality determined by proce

    Sep 20, 2017

  • AUSIMM
    An Analysis of Blasting Profitability and Productivity

    The mining industry is quite often faced with declining selling prices for its products in the face of rising prices for the input cost resources that it uses. Blasting is a key activity within the mi

    Jan 1, 2001

  • AUSIMM
    Local Resource Development Initiative - Developing a New Project Sustainability Model (Ambatovy Project Case Study)

    By S Novak

    A world-class example of sustainable development in practice, the Local Resource Development Initiative (LRDI) grew from agreements between the Ambatovy nickel mine developers and the Government of Ma

    Jan 1, 2009

  • AUSIMM
    The Use of High-Water Rapid-Solidifying Material as Backfill Binder and its Application in Metal Mines (81971fc4-4a86-4ab3-9271-1e5b157046a8)

    By Yucheng H, Baogui Y, Wenyong L

    High-water rapid-solidifying material, called 'high-water material', is a new material developed by the authors over many years. The material can solidify nine times its volume of water in

    Jan 1, 1998

  • AUSIMM
    Reflectance Spectroscopy with X-ray Fluorescence for Rapid Online Assaying in a Copper-nickel Flotation Plant

    By A Rantala, J Timperi and J Kaartinen, T Maksimainen, O Haavisto

    "X-ray fluorescence (XRF) is the most common technique used for online slurry assaying in base metal flotation applications. Typically, assays from feed, concentrate and tailings slurries are used to

    Oct 10, 2016

  • AUSIMM
    Legislation, Litigation and Liability

    Safety and health at work is about people. It is about people who plan for work, organise work and perform work. It is about those who come in contact with the workplace and those who are responsible

    Jan 1, 2005

  • AUSIMM
    Bituminous Geomembranes in Mine Construction

    By R McIlwraith, B Breul

    "This paper discusses the successful use of bituminous geomembranes (BGMs) in mining applications since their development in 1974. It explains and illustrates the structure of a BGM composite, which i

    Jul 27, 2015

  • AUSIMM
    The Wapolu gold deposit, Papua New Guinea: discovery to development

    Gold mineralisation was first noted in 1983 at the Wapolu Point area of Fergusson Island, Papua New Guinea (PNG) during a follow-up regional reconnaissance program. Subsequent exploration programs thr

    Jan 1, 1994

  • AUSIMM
    Evaluation of Underground Coal Mine Communication and Tracking Systems

    By C Harwood

    Underground coal mines in the United States are in the process of completing installations for tracking and communication systems, mandated by Congress after a number of recent coal mine disasters. Ye

    Nov 22, 2011

  • AUSIMM
    Determination of the Sampling Liberation Diameter in a High-Grade Coarse Gold Ore by High-Resolution X-ray Computed Tomography

    By I M. Platten, Y Xie, R-M F. Bell, S C. Dominy, L E. Howard, R C. A Minnitt

    For any resource evaluation program, the collection and processing of representative samples for assaying is critical. Sampling, sample preparation and assay protocols must be designed to suit the sty

    Aug 21, 2012

  • AUSIMM
    The Petroleum Industry's Future Self-Sufficiency and Taxes- A Review

    The performance of the Australian Mining Industry over the past 10 years using key indicators of production, revenue, aftertax return investment, together with key cost elements, market changes and

    Jan 1, 1987

  • AUSIMM
    Reducing Risks at Syncrude Canada Ltd's Mining Operations Through the Application of Technology

    By Fair A, Oxenford J

    Syncrude Canada Ltd operates one of the largest open pit mines in the world at Fort McMurray in northern Alberta, Canada. In 1993, Syncrude mined and processed 131.2 Mt of oil sands to produce 67.0

    Jan 1, 1994

  • AUSIMM
    Rotary Boring and Resin Bolting at Metropolitan Colliery

    By Vnenk L, Hargraves AJ

    Metropolitan Colliery has some areas of roof where immedi- ate support is required in development. The disadvantages of percussive roof bolting at the face have led to recent produc- tion trials with

    Jan 1, 1971

  • AUSIMM
    A Ventilation System for Large Block Cave Mines

    By M Stephens, T A. Sutra

    Currently, there are several open pit mines with production rates of about 200 000 tpd of ore that are reaching the end of their economic lives. In most cases, the remaining orebody extends to depths

    Jan 1, 2005

  • AUSIMM
    The application of secondary crushing at the Jundee gold mine

    By S Tyrrell, B Jackson, K Matson

    Northern Star Resources Limited Jundee Gold Mine in Western Australia operates a comminution circuit that consists of a primary crusher, 3.85 MW semi-autogenous grinding (SAG) mill, 1.8 MW ball mill a

    Aug 29, 2018