Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Mapping-based Approach to Geological Continuity Prediction Using Examples from the Balmat-Edwards-Pierrepont Zinc District, St Lawrence County, New York, USA

    By R H. Knight

    Uncertainty in prediction and modelling of geological (physical) ore continuity in geometrically complex ore deposits is a key risk factor in mining. Reducing geometric uncertainty of hard-boundary or

    Aug 18, 2014

  • AUSIMM
    An innovative application of gravity separation technology to beneficiate ultrafine iron ore

    By J Lyons, M Hasan, D Pepper, C Vadeikis

    Processing of large volumes of ultrafine ores has long challenged mineral processing operators because of lower recoveries and increased tailings. This has led to many deposits, or parts of existing d

    Nov 8, 2021

  • AUSIMM
    Valid spontaneous combustion hazard assessment for surface mine environmental impact statements

    By J Theiler, B Beamish

    Spontaneous combustion hazard assessment from an environmental impact perspective is not well understood and is seldom given due consideration in environmental impact statements. In surface mining ope

    Jul 25, 2018

  • AUSIMM
    An integrated and balanced approach to developing pre-concentration technologies across the mining value chain

    By G J. Wilkie, P A. Revell

    The R&D landscape for ore pre-concentration technologies within mining is characterised by the development of individual technologies and point solutions. This presents METS and mining companies with

    Nov 10, 2020

  • AUSIMM
    Testing and modelling of diverse iron ore slurries for pipeline friction and pump head derate

    By V Matousek, A Sellgren, R Visintainer, G McCall

    A 4-component model for settling slurry pipe flow has been previously described by Wilson et al (2006) and Sellgren et al (2014) to predict pipeline friction loss (hydraulic pressure gradient) over a

    Nov 8, 2021

  • AUSIMM
    Six Metre Raisboring at Z.C. Mines

    Production from a major, deep orebody requires the construction of two 6 m diameter, 1000 m deep ventilation shafts over the next three years. Further ventilation upgrades have foreshadowed an ad

    Jan 1, 1988

  • AUSIMM
    Field Parametric Geostatistics Geostatistical Rigorous Solutions Dealing with Extreme Grades During Resource Estimation

    By M Armony, J F. C L Costa, J C. Koppe

    Linear kriging methods fail to estimate local grades and local reserves for highly skewed variables due to three reasons: it uses only part of the available data information, it has no physical princi

    Sep 26, 2011

  • AUSIMM
    Differences between the Engineering Cultures of Australia and Brazil

    By C Fountain

    Australian mining and engineering companies have increasingly been investing in the mining industry in Brazil. It is a country of enormous mineral and agricultural wealth, with a well-established mini

    Aug 8, 2011

  • AUSIMM
    Thermal phosphorus – it’s a hot commodity with a hot process

    By R Atmuri, W Liang, R Prasad, Y Liu, E Wingate

    Yellow phosphorus (YP) has been commercially produced since the 1920s. First in the USA by the Tennessee Valley Authority (TVA), next in Russian (Kazakhstan) in the 1950s, and finally in China in the

    Aug 21, 2024

  • AUSIMM
    An Integrated Technology Solution for Optimised and Environmentally-controlled Blasts

    By C Parihar, R Garg, A Bhandari, S Bhandari

    Blasting can impact the efficiency of entire downstream mining operation. Individual technology solutions for blasting have been available in the industry for many years but all of them only cater for

    Aug 24, 2015

  • AUSIMM
    The Broken Hill Proprietary Company Limited. (Iron and Steel Works.) The Basic Open Hearth Process

    By Walker E. R

    IN the early age of steel it was made hy what is known as the cementation proeess, in which wrought iron was embedded in charcoal and heated in a mufflc furnace to a tcmperature of approximately 1100&

    Jan 1, 1930

  • AUSIMM
    The Influence of Charge Distribution on the Grindability of the Blasted Material

    By J Seccatore, G Sadao, M Cardu, G De Tomi, L Finoti, F Galvão, J Romero Huerta, A Rezende, J Bettencourt

    In the mining industry, rock blasting can be considered as the first phase of comminution. The downstream phases of comminution are mechanical, and consist in consecutive stages of crushing and millin

    Aug 24, 2015

  • AUSIMM
    Guidelines for the Design of Rope Guides

    Rope guides, consisting of ropes spanning between anchor points at the top and bottom of shafts, have frequently been considered as a viable alternative to fixed guides, comprising buntons and guides.

    Jan 1, 2005

  • AUSIMM
    High Pressure Particle Bed Comminution of Ores Minerals a Challenge

    By Kellerwessei H, Oberheuser G

    A major breakthrough in extending the life of the wear material of high pressure roll crushers when treating moist, highly abrasive material has removed the last impediment to the widespread accepta

    Jan 1, 1993

  • AUSIMM
    Smoothed Particle Hydrodynamics Modelling of Blast-induced Fracture Processes in Naturally Jointed Rock Medium

    By D Deb, R Pramanik

    This paper presents a generalised methodology in smoothed particle hydrodynamics (SPH) framework to analyse dynamic failure process of rock mass having natural joint under blast-induced stress wave an

    Aug 24, 2015

  • AUSIMM
    Modelling and Design of Block Caving at Bingham Canyon

    Open pit mining at Bingham Canyon commenced in 1904 and about two billion tonnes of ore have been extracted since then. There remain just under one billion tonnes of ore in the pit and this will be mi

    Jan 1, 2000

  • AUSIMM
    The Development of a Procedure for the Inspection of Unlined Rock Service Tunnels

    By D Lees, D Gilchrist

    Sydney has hundreds of kilometres of sewer tunnels. Many of these are over 50 years old and some have been in service for more than 100 years. The tunnels are predominantly constructed in Hawkesbury S

    Sep 17, 2014

  • AUSIMM
    Long-Term Water Management - The Forgotten Legacy of Mine Closure

    By G Byrne

    Long-term water management is typically ignored in mine closure planning. A review of 73 mine closure plans dating from 2007 to 2013 shows that, on average, relinquishment is proposed to be achieved i

    Nov 26, 2013

  • AUSIMM
    Ore Characterisation for Mine to Mill Fragmentation

    By A Scott, S Kanchibotla, J Segui

    The æMine to MillÆ concept is not new. In fact, it is the underlying objective of every mine. Unfortunately, in many operations the management structure and reporting systems have created independent

    Jan 1, 2000

  • AUSIMM
    A Critique of the Push-Pull Hybrid Ventilation System

    By A S. Derrington

    This paper describes a hybrid ventilation system, which uses secondary fans that also act as de-facto primary fans to extract fresh airflow from the mine intake raise system. Also discussed are the as

    Jul 1, 2013