Fine Iron Ore Beneficiation Through an Integrated Modular Gravity Concentration CircuitBy P Pieterse
Kumba Iron Ore Ltd is currently commissioning the Sishen Expansion Project (SEP) û a brownfields project on the Sishen Iron Ore Mine located in the Northern Cape Province, South Africa. SEP is designe
Jan 1, 2008
-
The Wedge Theory of Borehole Charge Design for Bench Blasting and Its Numerical SimulationBy Q Yu, G Ren, Z-Y Chen, J Yang
The wedge shape theory of the rock fragmentation range in bench blasting is presented according to the dynamic characteristics of rock fragmentation by blasting in open pit under the condition of hole
Aug 24, 2015
-
Geometallurgy in Mineral Sands Deposits – Linking Geological Artifacts to Metallurgy and Mine PlanningBy G Williams
Somewhat to the surprise of many heavy mineral sands (TiO2 and zircon) producers, there are important geological structures within their typical placers and aeolian sands deposits that affect plant me
Oct 5, 2011
-
Dewatering the Bowmans Trial PitBy Waterhouse J. D, Harris B. M
This paper briefly describes the construction in 1979/80 of a 70m deep trial open pit coal mine near Bowmans S.A. and describes more fully the hydrogeological aspects of the exercise. The primary p
Jan 1, 1981
-
KEYNOTE: Back to the Future – Still on the Dark SideBy P D. Munro
"This is a reprise of the paper ‘Back to the Future – Why Change Doesn’t Necessarily Mean Progress’ presented to the Tenth Mill Operators’ Conference in 2009. It was observed that the ‘boom and
Oct 10, 2016
-
Melbourne Main Sewer Project – Construction Phase – Soft Ground Tunnelling in the Yarra DeltaBy P Clark
This paper discusses the challenges, solutions and lessons learnt as tunnelling work continues on the Melbourne Main Sewer Replacement (MMSR) project.The MMSR project is a $220 million dollar project
Mar 8, 2011
-
Mining's Image in the Twenty-First CenturyLast September, when I was asked to prepare this paper, I was told the subject was "mining," a broad subject indeed! Rather than choose one of the many important technical and economic details whic
Jan 1, 1991
-
Managing remediation, and risk of failure, to complete extraction of a short life open pitBy C E. Woolley, A Hosseini, J Foster
Northern Star’s Thunderbox Open Pit C-Zone cutback was designed to maximise extraction in a short life excavation; In fresh rock on the western wall this included 20 m to 30 m bench heights with 6.5 m
Jun 22, 2022
-
AGL Energy, Loy Yang and GHD – a Further Case Study in Alliancing: Ten Years onBy J Missen, P Currie, J Bohan, D Clark
AGL is one of Australia’s leading integrated energy companies and the largest ASX listed owner, operator and developer of renewable energy and thermal generation in the country. AGL owns and operates
Jun 22, 2016
-
Grinding Media ù Its Effect on Pulp Chemistry and Flotation Behaviour ù Fact or Fiction?By J Kinal, P Steinier
A considerable volume of work exists in the literature examining the electrochemical interactions between grinding media and sulfide minerals. Broadly, most sulfide minerals are more noble than forged
Jan 1, 2005
-
BioHeap® – Breaking the Grade/Recovery Curve for Nickel ConcentratorsBy J Fewings, T McCredden, S Seet, C Fitzmaurice
"Flotation of nickel sulfide ores are generally constrained by nickel grade and impurity concentrations (notably magnesium and arsenic) in the product delivered to smelters. Being a physical separatio
Oct 10, 2016
-
Materials Handling at Olympic Dam Mine - Olympic Dam Aiming for æGoldÆWMC Limited, owner/operator of Olympic Dam, the worldÆs largest underground uranium mine and the fourth largest underground copper mine has now completed an expansion that has been classed as a benchm
Jan 1, 2000
-
What’s Stopping You? The Role of Sheeting Material Selection in Safe Haulage OperationsBy R Thompson, D Tulloch
"Wet-weather or 24×7 wet-trafficability is a commendable design objective for unpaved mine haul roads, but practically often difficult to achieve, due both to the road sheeting material selected, and
Nov 15, 2016
-
Resource Estimation Practice at The Granites Gold Mine, Northern TerritoryThe development of the Australasian Code for Reporting of Identified Mineral Resources and Ore Reserves is a significan step towards informing the financial community and the public about the futur
Jan 1, 1990
-
In-Pit Crushing and Conveying Bench OperationsBy T Atchison
In-pit crushing and conveying (IPCC) systems have come under growing scrutiny as a perceived mitigation to fuel and equipment price fluctuations, labour shortages and the need to move everincreasing v
Jul 11, 2011
-
æShot to ShovelÆ ù Understanding the Impact of Muckpile Conditions and Operator Proficiency on Instantaneous Shovel ProductivityBy J Battista, J Grace, I Brunton
The need to better understand and develop strategies to improve instantaneous shovel productivity at the Cadia Hill Open Pit Mine (CHM) instigated the development of the æShot to ShovelÆ project. This
Jan 1, 2004
-
Explosive dust management system for underground coalmines, digitally integrating stone dust application, sampling plans, and results to help mitigate explosion riskBy B Waldon, M Valastro
A coal dust explosion is one of the most significant risks in the harsh and complex environment of an Underground Coal Mine (UCM). Reviewing literature, regulations and existing systems surrounding ex
Apr 16, 2024
-
The Resource Valuation and Optimisation Model Real Impact from Real OptionsBy C Tonkin, S D. Howell, P V. Johnson, J Moriarty, P W. Duck
This paper presents the scientific framework underpinning the resource valuation and optimisation model (RVOM). The RVOM is a partial differential equation based real options software package, which h
Sep 26, 2011
-
The Ore-Deposits of Captain's Flat, New South WalesThe revival of the mining industry at Captain's Flat after a long period of years of inactivity has attracted attention to the importance of the ore-deposits of that field as potential sources of
Jan 1, 1941
-
George Fisher Mine - Feasibility and ConstructionBy G S. B Karunatillake
Following a pre-feasibility study, Mount Isa Mines commenced a feasibility study on the deposit of the George Fisher Mine in May 1997. Board approval was granted in May 1998 to construct a 2.5 million
Jan 1, 2000