Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Simplified Hybrid Semi-autogenous Grinding Mill Control – Explanation and Practical Results at the Porgera ConcentratorBy E Beltran, S Ngunz, F Orrante, F van Zyl, M Westcott
"The primary control objective of the project is to achieve milling optimisation by ensuring that the energy available for rock breakage is used as efficiently as possible. This is achieved by increas
Oct 10, 2016
-
The Development of a Low Shock Energy Ammonium Nitrate Based Explosive (8713d132-bd41-4f8d-9030-9017776cdfb9)By Moxon N. T
The detonation pressure of ANFO can be significantly reduced by the addition of low density materials such as polystyrene, bagasse, swadust or perlite. Laboratory and field test results have shown t
Jan 1, 1989
-
Adding value with reverse circulation drilling at Pueblo ViejoBy L Ventura, M Almond
The Pueblo Viejo project in the Dominican Republic installed an innovative sample system on its reverse circulation (RC) drilling rig during commissioning and subsequent commencement of operations. As
Sep 20, 2017
-
Near field blast vibration monitoring for slot or winze blast analysisBy E Wargem
The optimum mining of an orebody in an underground mining operation is fundamental to the mine’s ability to operate both sustainably and efficiently. The effective mining of an open stope or a cave is
Mar 29, 2023
-
Full-round Numerical Modelling of a Macro Synthetic Fibre Reinforced Tunnel Boring Machine Tunnel in the Shanghai Metro ExtensionBy L Nagy, K P. Juhasz
The authors were engaged to optimise a traditional rebar cage reinforced concrete segmental lining by means of finite element analysis (FEA) using macro synthetic fibres for the Shanghai metro extensi
Sep 17, 2014
-
Recent improvements in the milling circuit at Tropicana mineBy G R. Ballantyne, B Putland, I Lovatt, M Di Trento
The Tropicana Gold Mine, owned by AngloGold Ashanti Australia Ltd (70% owned and managed) and Independence Group NL (30%) is located 330 kilometres east-northeast of Kalgoorlie, Australia, in the newl
Sep 11, 2017
-
Modelling of Real-time Marker Data to Improve Operational Recovery in Sublevel Caving MinesBy A D. Campbell, G R. Power
The increasing availability of marker data in sublevel caving operations is changing the way draw can be managed to achieve positive recovery outcomes in these mines. This paper describes how marker d
May 9, 2016
-
Use of a Pre-existing Microseismic Monitoring System to Detect Trapped Miners (with Reflections on Beaconsfield 2006)By D Cumming-Potvin
Incidents that trap miners in underground mines have serious consequences for the miners and the mine operators involved. It is of utmost importance that mine operators utilise all available tools whe
Mar 24, 2014
-
Whole-of-System Analysis Using CFD to Reduce Emissions of Fugitives Gases Inside a Copper Smelter BuildingBy E Nik, A Manzoori, H Namavari, P Witt
The smelter building at Sarcheshmeh Copper Complex, Iran, houses two reverberatory furnaces and five Pierce-Smith converters. Under normal operating conditions SO2 emissions fill the building, posing
Jan 1, 2004
-
An Evolving Understanding of the Controls of the Trident Gold Deposit, Higginsville, Western AustraliaBy C F. Stokes
The Trident Gold Deposit has been successfully developed by Alacer Gold (formerly Avoca Resources Limited) into a 1.3 Mt/a operation in the space of four years from discovery to first gold pour (2008)
Aug 22, 2011
-
Explosibility Limits - Establishing Criteria for Mine Re-EntryBy D Cliff
"Recent underground coal mine incidents have again raised the issue of: under what circumstanceis it safe for personnel to re-enter the mine? Mine rescue guidelines make recommendations aboutthe limit
Jun 1, 2012
-
The Application of Automated Samplers in Copper/Nickel ProcessingBy J E. Powalisz
"The application of automated sampling techniques can help to provide a representative sample of process fluids and slurries that provide data for controlling process, custody transfer and quality ass
Jul 29, 2014
-
The Effect of Drilling and Blasting Performance on Fragmentation in a Quarry and Time for Loading, Secondary Breakage and CrushingBy J Seccatore, T Marin, M Cardu, G De Tomi, F Galvão, A Rezende, E Melo
Small-scale mining operations are characterised by a large variety of equipment availability and a high level of operational flexibility. Mine planning is usually scarce or absent in small quarries in
Aug 24, 2015
-
Legacy tailings dams – asset or liability? A case study on sub-aqueous tailings reclamationBy M Jones
Legacy tailings storage facilities exist within operating mine sites across Australia. These tailings storage facilities are often viewed as rehabilitation liabilities but with considered assessment m
Sep 1, 2024
-
Fine Sizing in Magnetite ConcentrationBy J Wheeler
The benefits of fine size separation in magnetite concentration are detailed focusing on published research from various iron ore producers. Basic principles of fine sizing and advancements in screeni
Jul 11, 2011
-
Trajectory Design and Economic Analysis of Asteroid Mining Missions to Asteroid 2014 EK24By S Dorrington, J Olsen, N Kinkaid
Several studies have been conducted on the economic analysis of mining near-Earth asteroids for resources for use in Earth orbit. While these studies use detailed economic figures of merit, they often
Nov 4, 2015
-
Vertical Pit Mining - A Novel Alternative to Open Pit or Underground Methods for Mining of Appropriate Massive Shallow OrebodiesBy P J. Terbrugge
The concept of vertical pit mining has been developed as an alternative mining method for the exploitation from surface of small, vertical or near-vertical, massive orebodies down to depths of some 20
Jan 1, 2000
-
Advances in the Simulation of Flexible CircuitsBy M M. Hilden, M S. Powell, B Foggiatto
In an environment of decreasing ore grade, increasing costs and uncertainty with respect to commodity prices, the industry could benefit from evaluating alternative technologies and innovative circuit
Sep 1, 2014
-
Open Pit Production Scheduling Optimisation - Why the Mining Industry Needs a New Phase Design ApproachThe long-term production schedule of open pit mines that maximises the net present value (NPV) of a given project relies on the proper design of phases (pushbacks) within the ultimate pit limits. Ther
Dec 6, 2010
-
Reducing the Energy Required in Grinding Clinker to Cement – Some Case StudiesBy H Benzer
Grinding clinker to finished cement consumes more energy than any other comminution process. World production of cement in 2009 was 2840 million tonnes and the energy required for comminution was 40-6
Aug 8, 2011