Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Challenge of Waterproofing Cross Passages in Segmentally Lined Tunnel Boring Machine Tunnels

    By E P. O’Dwyer

    Segment and gasket lining in tunnel boring machine (TBM) tunnels; and sheet membrane lining systems in driven tunnels are robust waterproofing systems each with a proven history of performance in Aust

    Sep 17, 2014

  • AUSIMM
    Improvements in estimating strengths of loose tailings: results from the TAILLIQ research project

    By D Reid, J Vinod, M Rahman, A Fourie, T Vo, J Ayala, A Russell

    This paper reports on an industry and Australian Research Council funded research project, TAILLIQ, that is a joint initiative between four Australian Universities. The paper discusses the accuracy wi

    Jul 1, 2021

  • AUSIMM
    Update of the geometallurgical model of a spirals circuit

    By R Belissont, C Veloso, L Senez, F Vasconcelos, E Kleiderer, J Mesquita, Y Basselin

    Mont-Wright mining complex is an important asset of ArcelorMittal located in the province of Quebec, Canada. It is composed by Mont-Wright and Fire Lake mines, operating 365 days per annum, and produc

    Sep 18, 2023

  • AUSIMM
    Iron Ore Washing – Achieve More with Fewer Resources

    By M Zlatev, S Silge

    Producers of primary resources such as iron ore face the challenge of processing crude materials with increasing levels of impurities, which may result in the requirement for wet processing. This resu

    Jul 13, 2015

  • AUSIMM
    Refining of Hot Metal with Na2CO3

    By Kajioka H, Nakamura Y

    Na2CO3 is a powerful flux for both dephosphorization and desulphurization in oxidizing atmospheres. In order to study refining with Na2CO3 and the nature of the Na2CO3 slag itself, hot metal (4Kg)

    Jan 1, 1980

  • AUSIMM
    Maldon to Dombarton Rail Link – Design Development of the Avon Tunnel

    By A Bagis, T Baker

    In 1983 the New South Wales (NSW) Government began to construct a 35 km freight rail line to provide additional rail capacity to Port Kembla in the Illawarra region, south of Sydney, through a direct

    Sep 17, 2014

  • AUSIMM
    Universal Reconciliation – A Multidisciplinary Approach across the Entire Mining Value Chain to Identify Loss of Value and Maximise Operational Performance

    By R Hargreaves, C Morley

    The authors often see problems on mine sites that are due to insufficient feedback between technical discipline silos as the realities on the ground fail to inform the models and plans used to drive r

    Aug 18, 2014

  • AUSIMM
    Surrounded by Change - Collective Strategies for Managing the Cumulative Impacts of Multiple Mines

    By D Brereton, C J. Moran

    Intensive resource extraction, in the form of multiple mining operations, presents significant assessment and management challenges for resource developers, governments, community and the environment.

    Jan 1, 2009

  • AUSIMM
    Managing Stress and Ground Condition Changes with Increasing Depth at Callie Underground Mine

    The Callie Underground Gold Mine (Callie) is owned by Newmont Asia Pacific and located 531 km north-west of Alice Springs in the Northern Territory. Historically, stopes have been mined util

    Nov 25, 2010

  • AUSIMM
    Industrial Strength Optical Image Analysis System - Mineral4/Recognition4

    By S Hapugoda, J R. Manuel, M J. Peterson, A Poliakov, E Donskoi

    ################

    Aug 12, 2013

  • AUSIMM
    Mining-RoX – Mobile Robots in Underground Mining

    By H Mischo, M Ferber, M Donner, B Jung, S Grehl, A Dietze

    Mobile robots have been making impressive inroads in a variety of domains. Within the Mining-RoX project, Technical University Bergakademie Freiberg is exploring a further frontier for mobile and auto

    Nov 4, 2015

  • AUSIMM
    Theory of Sampling meets the National Science Foundation I-Corps™ program

    By V Rodríguez, M Hormaza, R J. Romañach, C Pinzón-de la Rosa

    The authors have presented their ideas for developing a powder sampling device in the I-Corps™ program sponsored by the National Science Foundation (NSF). This is an intensive customer discovery progr

    May 9, 2017

  • AUSIMM
    Fast, Safe and Fully Mechanised Installation of High-Tensile Chain-Link Mesh for Underground Support

    By V Louchnikov

    Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in situ stresses and associated seismicity with potential rock burst hazards are th

    Mar 21, 2011

  • AUSIMM
    The Economic Life of a Rock Drill

    With the use of 86 rock drills of the jackhammer type at the West Lyell Open Cuts of the Mt. Lyell Mining & Hailway Co., it is of importance to determine the economic as well as the physical life

    Jan 1, 1942

  • AUSIMM
    Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?

    In most mining operations the ore undergoes several processes such as drilling, blasting, loading, hauling, crushing, grinding and liberation to become the final salable product. Drilling and blasting

    Jan 1, 2001

  • AUSIMM
    Measurement of Payloads Carried by Mine Haul Trucks and the Influence of Payloads on Production Rates and Material Movement Costs

    By Alexander RB, Hollis AJ

    The magnitude of the payloads carried by mine haul trucks can have a strong influence on the mine production rates and costs. Consequently control of truck payloads is highly desirable, but in man

    Jan 1, 1986

  • AUSIMM
    Underground Ore Handling Systems

    By B Olsson, C Glassock

    Computer simulation modelling (discrete event) has been used at Olympic Dam (OD) to model the handling of ore from the point of extraction at the stope drawpoint through to the ore stockpile on the su

    Jan 1, 2005

  • AUSIMM
    Design and Specification of Permanent Shotcrete Tunnel Linings

    By D Mather

    Fibre reinforced shotcrete has long been accepted as temporary ground support in both mining and civil tunnel linings. Greater knowledge and understanding of shotcrete as an engineering material and a

    Mar 8, 2011

  • AUSIMM
    Mine productivity and equipment selection impacts with operational grade engineering

    By A F. von Wielligh, M Scott, L Keeney

    Operational Grade Engineering (GE) is the early (pre-processing) discard of low-grade mineralised and/or barren rock to improve the ore grade and/or reduce deleterious elements within the run of mine

    Nov 10, 2020

  • AUSIMM
    The Use of Sprayable Waterproofing Membranes in Underground Structures – Concept, Design Options, Benefits and Limitations

    By W Mahoney, F Clement, E Saraiva

    Prefabricated waterproofing sheet membranes are extremely complicated to install in underground sections with complex geometries and, despite being already subjected to quality tests in the factory, t

    Sep 17, 2014