Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ventilation Duct Leakage ù A Method of Assessment

    The tangible effects of leakage are presented graphically, and a technique for quantifying the leakage characteristics of a ventilation column using the æSolveÆ capabilities of a common spreadsheet is

    Jan 1, 2002

  • AUSIMM
    Blasthole Cone Sampling Experiments for Iron Ore Flitch Mining

    Blasthole cone samples are used for grade control in most of the iron ore mines of the Pilbara of Western Australia. This method of sampling is straightforward when the target sampling interval matche

    Mar 1, 2010

  • AUSIMM
    Australian by Product Coking Practice

    Byproduct coking is practised in three of the major Australian ironmaking centres, the Newcastle and Whyalla works of the Broken Hill Proprietary Co. Ltd. and the Port Kembla works of Australian Ir

    Jan 1, 1972

  • AUSIMM
    Approaches to Reporting Grade Uncertainty in High-Nugget Gold Vein Projects

    By W B. Edgar, S C. Dominy

    High-nugget effect vein-gold systems are generally considered to be one of the most challenging of deposit types to evaluate and exploit. To potential investors and mining companies, they are viewed a

    May 24, 2012

  • AUSIMM
    Developments in Explosive SupplierûCustomer Relationships

    The original and most basic relationship between mining company and explosive supplier was a simple one of consumer and product supplier. The divide between the two was quite clear-cut with neither ta

    Jan 1, 2004

  • AUSIMM
    Project Management for All Seasons ù Financial Risk Mitigation in a Challenging World

    By O C. Aitken

    Mining project developers are committed to taking on all the challenges and obligations of financial risk management. It is interesting that our current models of project finance have not changed mark

    Jan 1, 2004

  • AUSIMM
    Design of Segmental Lining for Waterview Project, Auckland, New?Zealand

    By S Pradhan, A Kuras, R Mahajan

    This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan

    Sep 17, 2014

  • AUSIMM
    Exploding the Myths ù A Case Study on Land Use Planning and Quarry Buffers

    By M Freeman

    In a visionary move, the Planning Commission and the Ministry for Planning in Western Australia decided to invite three extractive industry quarry operators, local government councils and State Govern

    Jan 1, 2001

  • AUSIMM
    Elevating geotechnical considerations in the Australian underground coal industry and mine planning process

    By T Stambolie

    Mine planning processes are continuously evolving, increasing in complexity, and are required to be developed in shorter timeframes, often missing important steps in the process. Underground coal mine

    Nov 30, 2018

  • AUSIMM
    Parallel Implementation of a Tabu Search Procedure for Stochastic Mine Scheduling

    By R Dimitrakopoulos, R Senécal

    This paper presents a metaheuristic solution to the optimisation of open pit long-term production scheduling with a stockpile and geological uncertainty. The optimisation formulation is a two-stage st

    Nov 24, 2014

  • AUSIMM
    Geoscan Online Analyser Use for Process Control at Fortescue Metals Group Sites in Western Australia

    By B J. Beven, A Harris, L Balzan

    Fortescue Metals Group flagship operation, Cloudbreak, is located in the Pilbara region of Western Australia. The mine is capable of delivering an annualised production rate of 40 Mt/a. Positioned 50

    Jul 13, 2015

  • AUSIMM
    Design and Construction of No. 2 Residue Dam at Rosebery

    By West Coast Staff

    Attention to the design of facilities for drainage, of both surface water and seepage, made it possible to attain, for a qam impounding residues from a concentrating mill, a more stable sand wall whic

    Jan 1, 1958

  • AUSIMM
    Determination of the Transition Point from Open Pit to Underground Mining

    By A K. Ghosh, J Chung, E Topal, M Asad

    "Many open pit (OP) mines with considerable vertical extent are approaching the end of their life-of-mine; some of them are seeking the opportunity to make the transition from OP to underground (UG) m

    Nov 15, 2016

  • AUSIMM
    Chlorine Based In-Situ Leaching of Alluvial Gold Deposits

    Alluvial mining even of shallow deposits is often economically a marginal proposition and causes significant disruption of the land surface through the need for large scale excavation. In-situ leach

    Jan 1, 1992

  • AUSIMM
    Improving the prediction of stope hanging wall dilution – a critical factor to the success of Dugald River

    By J Player, R de Vries, J F. Carswell, R Hassell

    "The feasibility of Dugald River mine was highly sensitive to mining and geotechnical design assumptions, particularly stope dilution and strike length. Following the start of initial mine development

    Oct 16, 2017

  • AUSIMM
    Upgrading Low-grade Gold Ore Stockpiles by Preconcentration Using Ore Sorting – an Assessment of the Economic Impact and Viability

    By A N. Parry, G van Wyk

    "Sensor based automatic ore sorting technologies are used in the minerals industries to efficiently remove waste and submarginal grade material from crushed and screened run-of-mine (ROM) ore, produci

    Oct 10, 2016

  • AUSIMM
    Life of Asset Planning, Uncertainty and Value Optimisation of the Iron Ore Business – From Exploration, to Market, to Closure

    By J McCluskey, N Barros

    "Long-term strategic planning at BHP Billiton’s Western Australia Iron Ore business aims for sustainable value maximisation of its large, long-life, low-cost, expandable mineral inventory and supply c

    Nov 24, 2014

  • AUSIMM
    Case Study on the Remediation of a Remote Acid Mine Drainage Site in South Africa With Emphasis on Low Cost Measures and Cost Benefit Assessments

    By N Swiegelaar

    Loubert Witbank is a defunct coal mine situated near Ermelo in South Africa. Mining ceased in 1992, and within a short period acidic decant occurred, with a significant impact on the regional catchmen

    Jan 1, 2003

  • AUSIMM
    The Need for Specification Development in Australian Road Tunnels

    By T Brown

    Australia is now committed to the most significant period of infrastructure investment since the 1960s and the current climate of project finance and public private partnership (PPP) model uncertainty

    Mar 8, 2011

  • AUSIMM
    Improving compliance in mining through an effective geoscientific information management framework

    By S Mundell, A Atkins, S van de Water

    Geoscientific information management enables the capture, management and delivery of the original geoscientific observations and measurements of the earth’s natural resources. However, original observ

    Nov 8, 2021