Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Quantifying Plant Flow Availability for an Alumina Refinery Expansion using Dynamic Simulation

    By B Reynolds

    The process design for green- or brown-fields metallurgical plants typically starts with two fundamental elements: the detailed mass and energy balance and the plant flow availability. The detailed m

    Aug 8, 2011

  • AUSIMM
    Separation and enrichment of copper, nickel and cobalt from acidic leach solution of smelter slag using solvent extraction and selective precipitation

    By K Haga, G Danha, A Shibayama, L L. Godirilwe

    The hydrometallurgical separation and enrichment processes provide an effective way to selectively recover metals from relatively dilute multicomponent sulfuric acid leach solutions. The multicomponen

    Aug 24, 2022

  • AUSIMM
    Metallurgical Performance Models to Improve Cut-Off Grade Determination at Mount Isa Mines

    By J Simpson, M Johnston

    Recently Mount Isa Mines undertook a study to review the lead-zinc orebodies to extent of resource and reserves and determine the new life-of-mine schedule, as the Mount Isa and Hilton orebodies had n

    Jan 1, 2003

  • AUSIMM
    How to Obtain Cost-Effective Continuous High Production from TBMs

    By Jones A

    Today there is a vast amount of information available relative to the performance of tunnel boring machines, and associated systems. The data referred to here consists of project reports, manufacturer

    Jan 1, 1993

  • AUSIMM
    Developing Australia's First Block Caving Opeartion at Northparkes Mines - Endeavour 26 Deposit

    The introduction of a new mining method to Australia is not without its risks and challenges. This paper discusses the processes of planning a new operation, with particular emphasis on block caving

    Jan 1, 1995

  • AUSIMM
    Utilisation of Underground Space in Final Open Pit Walls at Surface Mines

    By T Sasaoka, H Shimada

    Mined-out limestone/aggregate quarries in Japan contain many high and enormous pit walls. Many precious resources are abandoned in these final pit walls. In addition, there are many mines which are lo

    Jan 1, 2008

  • AUSIMM
    Technological Innovations to Reduce Operating Cost at Kalgoorlie Nickel Smelter

    By Remilton D, Raston GR

    The low price of nickel which has prevailed since 1982 has dictated that unit production costs must be minimised. Early in the crisis, a decision was made within Western Mining Corporation to reduce u

    Jan 1, 1985

  • AUSIMM
    Thirty years since Moura No.2 – so what has changed?

    By D I. Cliff

    The loss of 11 miners in the 7 August 1994 Moura No.2 Underground Mine Disaster was the catalyst for major change in the way safety was managed in the Australian Mining Industry. The impact was felt a

    Apr 16, 2024

  • AUSIMM
    Design of raise caving operations in LKAB mines

    By T Ladinig

    Raise caving is a novel cave mining method, which has been proposed for mass mining at increasing mining depths in LKAB operations. The method makes use of the raise mining technology and an active st

    Mar 29, 2023

  • AUSIMM
    Sustainable Development and the Minerals Sector ù Leaving a Lasting Legacy

    By L Chaffey, M Buckland

    The minerals industry has enormous potential to positively contribute to sustainable development and many leading companies have concluded that their long-term success is directly linked to their abil

    Jan 1, 2006

  • AUSIMM
    Integrating Environmental Impact Assessment into Life-of-Mine Planning

    By J Jones, J Blunt

    "The requirement for environmental approvals and associated environmental impact assessments (EIAs) is now commonly regarded as a key milestone and body of work during project development. EIAs can be

    Jul 10, 2012

  • AUSIMM
    Removing some Subjectivity from Traditional BS 848 and ISO 5802 In Situ Fan Flow Tests

    Traditional in situ fan flow test methods under accepted standards require determinations to be made of both static pressures and total pressures during testing. This is to determine the resultant vel

    Jul 1, 2013

  • AUSIMM
    Mt Wright – geotechnical learnings from a sub level shrink

    By P Wilson

    The Mt. Wright Underground Mine is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. The establishment

    Nov 30, 2018

  • AUSIMM
    The Downward Trend of Mining - Infrastructure Costs

    By Glassock C. D

    Most Australian mining projects are becoming smaller, more remote and with lower grades of ore. Their small size has been making it harder for mining companies to absorb the large infrastructure co

    Jan 1, 1997

  • AUSIMM
    Application of Simulation Technology to the Design of Coal Clearance Systems

    Longwall mining operations have been in place in Australia since the early 1960s. This mining method is currently used to extract the bulk of coal obtained from underground mines in Australia (CSIRO,

    Sep 26, 2011

  • AUSIMM
    Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning Scheduler

    By D R. Seaman, R P. Tooher, B A. Seaman

    "Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove

    Oct 10, 2016

  • AUSIMM
    Geodynamic Modelling as an Exploration Tool

    By Y Zha, J L. Walshe, A Ord, N J. Archibald

    The purpose of this paper is to discuss the concept of Geodynamic Modelling as an exploration tool and to provide a specific example, namely, the Century Zinc deposit in Northern Queensland. Geodynami

    Jan 1, 2000

  • AUSIMM
    Benefits of Advanced Technology in Underground Mining

    By M Edhammer

    In 2007, Atlas Copco introduced an integrated tunnel scanner/profiler. The tunnel scanner, which is integrated into the control system, is mounted on the drill rigs, and replaces the previous variants

    Mar 21, 2011

  • AUSIMM
    Assessing Uncertainty with Drill Hole Spacing Studies – Applications to Mineral Resources

    By H M. Parker, G Verly, T Postolski

    Assessing the uncertainty and risk in mineral resource estimation is required for best practice and is implied by the public reporting codes in the categorisation of mineral resources and reserves. On

    Nov 24, 2014

  • AUSIMM
    Higher Energy Bulk Explosives – Matching Products to Rock Types Using an Energy Map Concept

    By S Thomson, G Rigby, J Norgard, D Wilkinson

    Bulk explosives provide the energy to move a rock mass and reduce it to an optimal size (fragmentation). The intensity of energy needed depends on several factors including a customer’s geology and en

    Aug 24, 2015