Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Key Drivers of Energy and Cost Efficiency in Autogenous/Semi-Autogenous Grinding Circuits

    By G Lane, M Bueno

    In a recent publication (Bueno and Lane, 2011) the authors presented the analysis of a consolidated dataset composed by 137 autogenous/semi-autogenous grinding (AG/SAG) mill pilot trials. By comparing

    Oct 29, 2012

  • AUSIMM
    Optimisation Improvements for Narrow Vein Open Pit Deposits Using Mineable Shape Optimiser

    By C Mann, S Swapp

    "The mining industry is often challenged with the task of evaluating narrow vein open pit deposits. A realistic mineable solution from optimisation needs to accurately represent mining dilution and th

    Nov 15, 2016

  • AUSIMM
    Slag volume effects on direct-reduced iron (DRI)-based electric furnace steelmaking

    By Q Zhuo, P C. Pistorius, M N. Al-Harbi

    A likely increasingly important pathway for future low-carbon ironmaking and steelmaking is the combination of gas-based direct reduction with electric furnace steelmaking (DRI-EAF route), or with ele

    Aug 21, 2024

  • AUSIMM
    Consideration for Multiobjective Metaheuristic Optimisation of Large Iron Ore and Coal Supply Chains, from Resource to Market

    By J Balzary, A Mohais

    Dynamic market and operating conditions, coupled with an environment in which multiple objectives and trade-offs are common, pose major challenges for planners and schedulers working in any mining ent

    Nov 24, 2014

  • AUSIMM
    Geology, Grade Control and Reconciliation at the Douglas Mineral Sands Deposit

    The Douglas mineral sands deposit is located 75 km north of Hamilton in western Victoria, Australia. The deposit was discovered in the late 1990s by Basin Minerals Limited and purchased by Iluka Resou

    Jan 1, 2009

  • AUSIMM
    High shear rotor trials in the Mount Isa Mines Copper Concentrator

    By H Law, M Muller

    Mount Isa Mines (MIM) Copper Concentrator currently utilises Agitair 120 banks for its roughing flotation circuit. Apart from a rotor change, the only other significant work completed to the Agitair b

    Aug 29, 2018

  • AUSIMM
    Automated Multi-Drills in Rio Tinto

    By C McHugh, F Oppolzer, B Rogers, A Stokes

    Rio Tinto has embarked on a journey to use automation to improve the performance of its surface mines. The driver for automation has more to do with improving the accuracy and consistency of mining pr

    Sep 18, 2012

  • AUSIMM
    Microwave heating behaviour of ores and its application to high-power microwave assisted comminution and ore sorting

    By X Tian, J Forster, A Olmsted, E R. Bobicki, M Goldbaum, D Boucher, C A. Pickles

    As the global demand for metal values expands, it becomes increasingly important to create more sustainable mining operations. Consequently, considerable research and technology development is require

    Aug 24, 2022

  • AUSIMM
    Minimising Blast Damage to the Extraction Level of Northparkes Mine's E26 Block Cave

    Optimal drill and blast design is a process often neglected by many underground hard rock mines. This is even more important to the new mine where ring designs need to be implemented and refined in

    Jan 1, 1995

  • AUSIMM
    An Alternative Genesis for Pisolites and Channel Iron Deposits in Western Australia

    The current genesis of pisolites and channel iron deposits (CID) has been defined in a way that presents CID as unique in the world. The published material on detrital pisolites mostly details the Wes

    Jan 1, 2009

  • AUSIMM
    The Underground Quarrying of Backfill Material - A Potentially Viable Option (3e0fe107-4258-4ea0-abd2-b85d48fc35ff)

    By Robertson AC

    Studies by Tennent, Isokangas Pty Ltd (TIP) have indicated that underground quarrying of backfill may be a cost competitive option for providing backfill for specialised situations in underground mi

    Jan 1, 1998

  • AUSIMM
    æDryÆ Granulation of Slags for Producing Cement Binder

    By B, T Norgate, S Sanetsis, R Davidson

    Global cement production accounts for about five per cent of man-made CO2 emissions (WBCSD, 2002). Such operating practices will increasingly be considered unsustainable, unless significant reductions

    Jan 1, 2004

  • AUSIMM
    The Influence of Inertisation Techniques on Gas Interpretation

    By D M. Brady

    Underground coal mines in Australia have embraced the use of various inertisation techniques both proactively and reactively. The use of such techniques can have a significant influence on ratios and

    Jul 1, 2013

  • AUSIMM
    Geotechnical Management at the AGL Loy Yang Mine

    By S Cyphers, J Missen, B Jansen

    The AGL Loy Yang Mine is one of the largest and most significant coalmines in Australia. Commencing in 1982, this mine produces 30–35 Mt/a to supply more than 50 per cent of Victoria’s electrical powe

    Nov 5, 2014

  • AUSIMM
    Modular SAG mill discharge trommel for maintenance flexibility and performance

    By K Katov, S T. Ciutina, J D. Pyke

    The development and optimisation of mill discharge trommels, and specifically their screen panels, can be a neglected area in the complex operation of a minerals processing plant. Trommels are often s

    Aug 29, 2018

  • AUSIMM
    Opening Supports to Segmental Linings – A Novel Shotcrete Support Solution

    By M Burdick, A Harding, M Krulc, M Chappell

    Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How

    Sep 17, 2014

  • AUSIMM
    Creating optimised drill programs that add real value, and integrate with mine planning

    By N Anderson

    With traditional grade control processes, geological models are created by geologists at the completion of the data collection stage and wireframe construction is closed off at a set date to allow for

    Mar 22, 2022

  • AUSIMM
    Improving Excavation Efficiency at the St Helena Tunnel Using Best Practice Drill and Blast Techniques

    By D Miller, M Dowling, R Domotor

    "This paper is focused on blasting activities undertaken as part of the Pacific Highway Upgrade – Tintenbar to Ewingsdale – project (T2E). This is a ‘priority 1’ Pacific Highway road construction proj

    Sep 17, 2014

  • AUSIMM
    Recent Experiences at the Kangaroo Flat Mine, Bendigo

    By M Hernan

    Bendigo Mining Limited has established a modern underground gold mine and processing plant at Bendigo in central Victoria. The Bendigo goldfield produced around 22 000 000 oz of gold between 1851 and

    Jan 1, 2008

  • AUSIMM
    Taming the dragon – the art of transitioning from reactive to proactive tailings management through strategic operator engagement

    By C N. Hatton, K Ward

    Tailings operations are inherently reactive as operations personnel continuously contend with a concentrator reject feed (tailings) transient in physical and engineering properties, which places a con

    Jul 1, 2021