Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Platform for Managing and Analysing Atmospheric Data in Underground Coalmines

    By S J. Schafrik, Z Agioutantis, E C. Jong, K Luxbacher

    Real-time monitoring of mine operating parameters is available at most mines. However, access to these data for an individual operation is typically underutilised by mine managers and technical person

    Nov 4, 2015

  • AUSIMM
    Application of Design Concepts and Engineering Controls Necessary to Deliver Well-designed and Rehabilitated Landforms

    By T Leidich, M Van Zyl, H Lacy

    Mining ‘as usual’, until the most recent decades has resulted in limited landform planning and a general lack of mine waste landform design. Material characterisation, mine planning and dedicated prof

    Jul 16, 2014

  • AUSIMM
    The Product Quality System at Cliffs Natural Resources – Koolyanobbing Iron Ore Operations

    By A L. Wills

    Cliffs Natural Resources Pty Ltd (Cliffs) operates iron ore mines in the Koolyanobbing region of Western Australia. Ore is mined from three separate hubs and trucked to Koolyanobbing. There it is crus

    Jul 11, 2011

  • AUSIMM
    Improved Ground Control Using Hydro Scaling and In-Cycle Shotcrete

    By B Upton, J Mitchell

    The use of hydro scaling and in-cycle shotcrete to replace conventional jumbo scaling, mesh and bolting as the primary method of ground control for run of mine development has been investigated throug

    Jan 1, 2005

  • AUSIMM
    Flexigel™ – A Variable-density Solution

    By D R. Andrew, K T. Morrison, J F. Tiedgen

    Waste blasting in iron ore operations can pose a number of technical challenges, including blasting through variable geology and blasting soft ground in wet conditions. Blast patterns are designed to

    Jul 13, 2015

  • AUSIMM
    Technology and Changes in Mines Rescue

    As the mining industry looks to new technologies for a safe work environment and increased production rates, so should emergency response teams when dealing with organisational incidents. Implementati

    Jan 1, 2004

  • AUSIMM
    Metallurgical Efficiency in the Recovery of Alluvial Gold

    The character of alluvial gold deposits presents severe difficulties, and sometimes limitations, on the extent to which metallurgical efficiency can be measured. Very little monitoring of metallurgica

    Jan 1, 1984

  • AUSIMM
    Latest fifth generation (Mk V) gyratory crushers with focus on safety and maintenance features

    By W Malone, J Garrett

    FLSmidth (FLS) has spent the last 15 years, working with customers and engineering houses to deliver innovative improvements in crusher safety, coupled with the latest, maintenance friendly, crusher d

    Sep 18, 2023

  • AUSIMM
    Process development for the Mina Justa project

    By I Ritchie, A Johnston, D Yataco

    Marcobre SAC (Marcobre) is developing the Mina Justa copper mine project, located in the Ica region of Peru. The Mina Justa IOCG orebody comprises of a sulfide mass overlain by an oxide cap with a sha

    Sep 11, 2017

  • AUSIMM
    The Application of AS 61508 to Road Tunnel Fire and Life Safety Systems

    By M Taylor

    The Project Specification and Technical Requirements documents associated with several recent large road tunnel projects within Australia have specified the application of AS/IEC 61508 – FunctionalSaf

    Mar 8, 2011

  • AUSIMM
    Bulk Mining Explosives ù Technical Tool or Commercial Commodity?

    By G Le Juge, K Waldock

    The current suite of bulk mining explosives has been available to the industry for over 20 years. The flexibility and performance of ammonium nitrate based emulsion blend explosives were accepted by t

    Jan 1, 2004

  • AUSIMM
    Muck Pile Shaping for Draglines and Dozers at Surface Coalmines

    By M Nagarajan, S Esen

    This paper presents three case studies from three surface coalmines. The first case study is from a coalmine where a dragline operates in 60 m wide and 1 km long strips. Typical overburden height rang

    Aug 24, 2015

  • AUSIMM
    Sustainable Development Reporting in the Australian Minerals Processing Industry

    By A Bossilkov

    Although environmental and sustainable development reporting has now become widespread in the Australian mining and minerals processing sector, there remains a great deal of diversity in reporting con

    Jan 1, 2004

  • AUSIMM
    CIP ù Who Needs It? A Combination Circuit of Gravity, Flotation and Intensive Leach May Provide the Optimal Environmental and Cost Outcome for Gold Plants ù Stage II ù Results

    By A McCallum, J Abols, G Patrick, G Johansen

    The authors challenge the traditional thinking that whole ore cyanidation followed by Carbon in Pulp (CIP) or Carbon in Leach (CIL) should be applied as a standard process in the majority of gold proc

    Jan 1, 2004

  • AUSIMM
    Thick Seam Mining Techniques In Japan

    The author describes 1. The classification and characteristics of various thick seam mining techniques in various Japanese coal mines. 2. Practices of thick seam mining methods experienced in Ta

    Jan 1, 1976

  • AUSIMM
    Testing and quantifying geological uncertainty (or a gram of drill data is worth a kilogram of geological interpretation)

    By M P. Murphy, C M. D Barton

    When developing a new underground mine, the geological interpretation that guides the mineral resource is crucial to the preparation of a reliable ore reserve. In preparing a robust geological model t

    May 24, 2023

  • AUSIMM
    A case study in managing a high consequence geotechnical risk in a Queensland coalmine

    By K Young, M Martin, D Payne

    This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor

    Nov 29, 2022

  • AUSIMM
    Advanced Customisable Leach Columns – A New Kinetic Testing Method to Simulate Site-specific Conditions

    By J Pearce, M Barteaux, S Pearce

    The prediction of how waste materials will evolve geochemically within waste storage facilities has been the subject of hundreds of thousands of hours researched by geoscientists globally. Despite the

    Jul 27, 2015

  • AUSIMM
    Underground Mine Radio Automation Systems

    By S Munn

    Today, it can be said that the majority of mines utilise communications equipment in one form or another. Either for communications between staff making their day-to-day operations more efficient, or

    Jan 1, 1999

  • AUSIMM
    A Comparative Study of Manual Wagon Top Sampling and Auto Mechanical Sampling of 200 mm Size Coal with Respect to Stopped Belt Sampling of Thermal Coal at Indian Super Thermal Powerplants

    By K M. P Singh, K M. K Sinha, G S. Jha, T Gouricharan, K K. Sharma

    The majority of the powerplants in India are fed with non-coking coals, with the coals dispatched from their respective mines via wagons loaded by a rapid loading system or pay loader. The usual top s

    Jul 29, 2014