Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Implementation of Localised Uniform Conditioning for Recoverable Resource Estimation at the Kipoi Copper Project, Democratic Republic of the Congo

    By M G. Millad, M Zammit

    The Kipoi Central (KPC) copper project is located in the Katanga Province in the Democratic Republic of the Congo and is presented here as an example of an operating mine where the Mineral Resource wa

    Aug 18, 2014

  • AUSIMM
    Evolution of SAG Milling Performance ù A Comparison of Alumbrera and Ernest Henry

    By J Mar·n, R Anderson, S Strohma, R Harvey

    Xstrata is the operator of both Minera Alumbrera Ltd (50 per cent Xstrata, 50 per cent Wheaton River) and Ernest Henry Mining Pty Ltd, (99.99 per cent Xstrata), both copper-gold deposits, using conven

    Jan 1, 2003

  • AUSIMM
    Gold-Silver Vein Mineralisation at Cononish, Scotland

    By I M. Platten, C J. S Sangster, Y Xie, S C. Dominy

    Cononish is a steep, narrow NE-SW trending vein system that was emplaced into late Proterozoic metasediments. It shows brittle style deformation and postdates metamorphism and associated Caledonian fo

    Sep 26, 2013

  • AUSIMM
    Mining What's in it for New Zealand?

    By B M. H Sharp, R P. Hide, S P. Devine

    Uncertainty and debate currently pervade the mining industry in New Zealand. The operational uncertainties, whether external (eg gold prices, the exchange rate), or internal (eg coal expansion difficu

    Jan 1, 1985

  • AUSIMM
    Processing options for removal of silica and alumina from low-grade hematite-goethite iron ores

    By M I. Pownceby, S P. Suthers, V Nunna, G J. Sparrow

    Global demand for iron and steel has increased substantially over the past 20 years and there has been a greater focus on developing suitable processing options to treat low-grade hematite-goethite or

    Nov 8, 2021

  • AUSIMM
    Deep Paste Thickening Systems (Brisbane, 14 - 16 April1998)

    By Laros T, Schoenbrunn F

    Deep paste thickeners have been proven capable of consistently producing medium to low slump material for disposal without the need for filters. However, proper design of the entire system is critic

    Jan 1, 1998

  • AUSIMM
    Geometallurgical Modelling of the Dumont Deposit

    By M Sciortino, J Korczak, J Muinonen, A St-Jean

    The Dumont deposit is a large (1179 Mt reserve), low-grade (0.27 per cent nickel) nickel sulfide project located in the Abitibi region 25 km west of Amos, Quebec. Royal Nickel Corporation (RNC) acquir

    Sep 29, 2013

  • AUSIMM
    Improvement of Existing Ore-forming Models Due to Systematic Sampling During Mining – An Example from Kambalda, Western Australia

    By C Laming, S Staude, D Hammond, S Sheppard, J Griffith, S Stanfield, S Marriott

    Long Operations is located on the eastern slope of the Kambalda Dome in Western Australia. Kambalda hosts nickel deposits that are modelled to have formed from an exsolving sulfide melt from a parenta

    Aug 18, 2014

  • AUSIMM
    A Mineragraphic Study of Mount Morgan Copper-Gold Ore

    The Mount Morgan eopper-gold orebody is contained within a series of Mid-Devonian volcanics which occurs as a roof pendant within Permian granite. The ore minerals comprise pyrite, chalcopyrite, and l

    Jan 1, 1967

  • AUSIMM
    The Inter-dependence of Mining and Mineral Beneficiation Processes on the Performance of Mining Projects

    By McKee D. J

    Much research is aimed at providing a revolutionary advance in technology that has the potential to render current mining and beneficiation problems obsolete. Such revolutionary advancements have b

    Jan 1, 1994

  • AUSIMM
    Catalysing lower-carbon mining supply in Australia

    By M Rea, E O’Connell

    Decarbonising explosives manufacturing and catalysing low-carbon mining supply is a significant global challenge. Low-carbon manufacturing precincts – clusters of geographically close businesses acros

    Sep 1, 2024

  • AUSIMM
    Development of Robot System for Automatic Assembling of Bolted Segments

    By Harada M, Katsuta S

    In order to shorten the time taken to com- plete shield tunnel excavation work, reduce labor costs and to improve safety, an automatic assembly robot system for the segments used has been developed

    Jan 1, 1987

  • AUSIMM
    Regeneration of 2-Naphthol from Cobalt Precipitate

    By Haigh C. J

    A process has been developed to recover at least 75% of the 2-naphthol contained in cobalt precipitate produced during the removal of cobalt from electrolytic zinc plant solution. The recovered mat

    Jan 1, 1977

  • AUSIMM
    Developments in Steel Recycling Technology

    By Y Pan

    The recycling of steel is a crucial aspect of the shift toward a sustainable metals industry. The emphasis on steel recycling through the introduction of the scrap based mini-mill concept is also matc

    Jan 1, 2004

  • AUSIMM
    Prediction of Solute Transport from Gold Mine Wastes, Coromandel, New Zealand

    This paper describes a case history of using an integrated geochemical and hydrogeological approach to predicting solute transport from gold mine tailings in highly fractured volcanic terrain. Two m

    Jan 1, 1988

  • AUSIMM
    Iron Ore Characteristics and their Application in Optimising the Granulation Process

    By R Zhang, X Huang, M Zhou, X Lv, C Bai

    Iron ore sinter accounts for a large proportion of blast furnace ferrous burden in Chinese steel mills. Depleting high-grade iron ore resources and spreading complexity of iron ores in mineralogy and

    Aug 12, 2013

  • AUSIMM
    The interaction between slag and MgO refractory at conditions relevant to nickel laterite ore smelting

    By A D. Pradana, D R. Pradana, Y H. Putra, Z Zulhan, T Hidayat

    The high temperature processing of nickel laterite ore is currently dominated by the Rotary Kiln- Electric Furnace (RKEF) technology. The ratio of SiO2/MgO (S/M) in the ore is one of the critical para

    Aug 21, 2024

  • AUSIMM
    Positive influence of WHIMS concentrate on the sintering performance of Roy Hill fines

    By S Hapugoda, J R. Manuel, X Cao, B D. McDonald, N A. Ware, L Lu

    Roy Hill is a large iron ore mining, processing, railing and port operation in the Pilbara region of Western Australia. Since delivering its first shipments to customers in December 2015, Roy Hill has

    Nov 8, 2021

  • AUSIMM
    The Status of Mine Water Pollution in South Africa

    This paper presents an overview of the current status of mine water management in South Africa. The regulatory framework within which mine water management operates is set out, based on the principles

    Jan 1, 2003

  • AUSIMM
    Pressure Distribution of 2-Leg Shield Supports

    By Peng S. S

    Measurement of pressure distribution under the base plate of the Hemscheidt 2-leg 800-ton shield was performed underground for two shifts using 12 pressure cells installed in two rows, one each und

    Jan 1, 1992