Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
An evolution of drill hole spacing studies at Newmont CorporationBy A Jewbali, L Allen
At Newmont Corporation drill hole spacing studies are done to support the business in understanding the cost of collecting additional information (with a specific focus on drill hole sampling density)
May 24, 2023
-
Differential Cut-Off GradesDetailed underground mine design and optimisation studies undertaken by the author over the past few years have clearly demonstrated that additional value can be created by varying the cut-off grade (
Jan 1, 2005
-
Hydrogen reduction of as-received and pre-oxidised NZ titanomagnetite ironsands in a small-scale high-temperature fluidised bedBy B J. Monaghan, R J. Longbottom, S Prabowo, D Del Puerto, B Maisuria, C W. Bumby
The use of hydrogen as a reducing agent can substantially reduce carbon dioxide (CO2) emissions from the ironmaking process. Iron ore fines can be reduced in a fluidised bed (FB) using hydrogen (H2) a
Sep 18, 2023
-
Enhancement of the Becher Process by Ball MillingIlmenite (FeTiO3) is the primary global source of titaniumdioxide which is commonly used as a whitening agent in papermanufacture and a pigment in paint manufacture. In WesternAustralia ilmenite is pr
Jan 1, 1997
-
Quantitative airblast risk assessments for block and sublevel cavesBy C Vejrazka1
The occurrence of airblasts is one of the principal mining hazards in caving operations between the time of cave establishment and breakthrough of the cave to surface. As such, it needs to be managed
Oct 12, 2022
-
Integrated Site Water Balances and Water Quality Models for Decision-making over Life-of-mineBy R Strand, B Usher
Environmental compliance and mine designs are increasingly including assessment of flows and water qualities as a key driver to decision-making over life-of-mine. Integrated site-wide water quality mo
Jul 16, 2014
-
The North Strathfield Rail Underpass – Driven Tunnel Design and ConstructionBy E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares
The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,
Sep 17, 2014
-
Australia and it's Minerals Industry-Sharing the Same FutureIn Australia we usually define "resource" in purely material terms, and rarely relate it to intellect and human capacity. We look at the sheer abundance of our natural resources and are satisfied w
Jan 1, 1986
-
Effect of Concentrate and Micropellet Addition on Iron Ore Sinter Bed PermeabilityBy A M. Nyembwe, A M. Garbers-Craig, R Cromarty
With the depletion of high-grade lump iron ore, concentrates have been identified as an alternative material for sinter making. Adding concentrates to the sinter mixture reduces sinter bed porosity an
Jul 13, 2015
-
Incorporation of ore sorting into a proposed greenfields tin mining and processing project in MoroccoBy A N. Parry
In May 2018 Kasbah Resources Limited (“Kasbah”) completed an ore sorting test work program which was a precursor to releasing in July 2018 an updated Definitive Feasibility Study (“DFS”) for the Achmm
Nov 10, 2020
-
The McArthur River Mine - The First Years of OperationBy C M. Stewart, P Bowen
McArthur River Mine, in the Gulf Country of the Northern Territory, exploits one of worldÆs largest deposits of zinc, lead and silver. It was officially opened in September 1995, 40 years after its di
Jan 1, 1998
-
Assessing and monitoring food and feed safety – a 15 year quest for proper samplingBy C Paoletti
About 15 years ago the debate on the reliability of sampling procedures for agricultural food and feed commodities was initiated by a few brave scientists who questioned the representativeness of what
May 9, 2017
-
The Development of Mineral Sands Separation Technology-Solving Today's Problems, Anticipating Tomorrow'sBy Richards RG, Cross MS
The development of alluvial mining, processing systems and associated gravity separation technology over the last 30 years is largely linked to the mineral sands industry. Attention has been focusse
Jan 1, 1986
-
Predictive Site-Wide Water Quality Modelling as a Tool for Mine Planning and Permitting - A Recent Canadian ExampleBy A Fitzpatrick
An integrated and dynamic water balance and water quality model for a proposed base metal mine has been created using the GoldSimÖ software package. The model was initially developed to address the wa
Jul 10, 2012
-
Bit to Bag - The Importance of a Total Coordinated System in Reverse Circulation DrillingBy M Goers, M Almond
"The use of reverse circulation (RC) drilling for grade control sample collection was selected by the Pueblo Viejo Mine Geology department at the recommencement of the operation in 2010. This method w
Aug 21, 2012
-
Non-Destructive Testing of In Situ Underground Mine Seals - Initial Technology AssessmentBy C Harwood, EáWestman, K Luxbacher
Testing of in situ seals in underground coal mines is critical to determine seal integrity and to provide safe working conditions. In the wake of the 2006 Sago Mine explosion, the United States of Ame
Jul 1, 2013
-
The Effects of Increased Salinity on Microbially Mediated Ecosystem Processes in Ephemeral StreamsBy J L. Kerr, J Beyer-Robson, S Vink
Driven by an increasing need for water conservation, coal mine operators in the upper Isaac River catchment have placed significant emphasis upon the reuse of water. This initiative led to an overall
Nov 26, 2013
-
Application of foam as a ventilation control for spontaneous combustion management in a longwall goafBy O Salisbury
Ingress of air into the longwall goaf environment needs to be managed appropriately to reduce the risk of creating a spontaneous combustion event. The maingate goaf edge is an area of particular conce
Oct 12, 2022
-
Controlled Explosives Demolition of Concrete Bridge – Canberra 2010: Blast Design, Procedures, Risk Assessment and ExecutionBy N Elith
The explosives demolition of a post-stressed, steel reinforced, concrete road bridge in Australia’s capital city, Canberra. The bridge was 50 m from the new replacement bridge, 320 m from community st
Nov 8, 2011
-
Increasing the deportment of titanium species to, and the stability field of pseudobrookite phase for valourisation of titaniferous slagsBy J Nell, J Petersen, X C. Goso
The feasibility of increasing the deportment of titanium species and the stability of the pseudobrookite solid solution (M3O5) in a titaniferous slag was investigated, to facilitate the valourisation
Jun 19, 2024