Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Comparison of One Stage and Two Stage Classification ù A Case Study

    By M N. Mian

    The Cayeli volcanogenic massive sulphide deposit is located in Black Sea region of Turkey. Cayeli Bakir Isletmeleri (CBI) was formed as a joint venture between Inmet (Canada) and Eti Holding (Turkey).

    Jan 1, 2003

  • AUSIMM
    An Advanced Modelling Technique for Scale-Up of Batch Flotation Results to Plant Metallurgical Performance

    By O N. Savassi

    A rigorous methodology for prediction of flotation plant performance is presented, which is based on a standardised batch flotation test called the MFT. The work is part of the FLEET program, develope

    Jan 1, 2005

  • AUSIMM
    Use of Geostatistically-constrained Potential Field Inversion and Downhole Drilling to Predict Distribution of Sulfide and Uranium Mineralisation

    By M Zengerer

    The Basil Cu/Co deposit comprises a 26.5 Mt Inferred Resource of copper and cobalt, grading 0.57?per cent Cu and 0.05 per cent Co. It lies in the Harts Range, Central Australia, within the Riddock Amp

    Aug 18, 2014

  • AUSIMM
    A new cut-off grade method to maximise resource utilisation of underground metalliferous mining operations

    By M Nehring, M Kizil, P Knights, A Mousavi, F Sotoudeh

    A cut-off grade is used to distinguish an economically viable block of ore from non-economical ones in mining operations. In order to obtain a high Net Present Value (NPV), a strategic and precise det

    Nov 10, 2020

  • AUSIMM
    Fluid Pressure, Geomechanical Evolution and Predictive Targeting of the Sunrise Dam Gold Deposit, Western Australia

    By M J. Nugus, J G. McLellan, T G. Blenkinsop

    High fluid pressures and deformation have been instrumental in the formation of high-grade gold lodes at the Archaean granite greenstone 12 Moz Sunrise Dam gold deposit in Western Australia. Historica

    Sep 26, 2013

  • AUSIMM
    Deck hands needed! Experience necessary – addressing the impending qualified tailings professional resource shortage

    By K J. Ward, C N. Hatton, J Scalia IV, C A. Bareither, D L. Spencer

    The mining industry is experiencing change in the governance of tailings facilities (TFs). Guidance and regulations across many jurisdictions contribute to this amorphous change. The Canadian Dam Asso

    Jul 1, 2021

  • AUSIMM
    Deep Wind Koepe Winders ù Rational Selection of Koepe Head Ropes

    This paper addresses, in particular, the influence of winding depth on the selection of head ropes for Koepe winders. Because this is just one aspect of winder design that affects the operational safe

    Jan 1, 2005

  • AUSIMM
    A novel approach to evaluating gravity pre-concentration amenability utilising the hydrodynamics of dense liquids in inclined channels

    By J Zhou, T D. McGrath, K P. Galvin, C P. Lowes, J J. Eksteen

    Pre-concentration of low grade ores can improve the economic and environmental sustainability of an operation significantly, with opportunities for implementation ranging from run-of-mine to mill disc

    Nov 10, 2020

  • AUSIMM
    Modelling Full-scale Blast Heave with Three-dimensional Distinct Elements and Parallel Processing

    By A Tawadrous, B Wheeler, D S. Preece, S A. Silling

    The two key results of rock blasting are fragmentation and movement of geomaterials. Movement/flow of the blasted rock is often referred to as heave. Moving rock with explosives rather than mechanical

    Aug 24, 2015

  • AUSIMM
    Minimum sample mass from reverse circulation grade control drilling at Rocklands copper project

    By M G. Hawtin

    The Rocklands copper project is a multilode, iron oxide copper gold (IOCG) + cobalt mineralised system located in the Eastern Fold Belt of the Mt Isa Inlier. Rocklands orebodies cover a range of oxida

    Sep 20, 2017

  • AUSIMM
    Understanding your work health and safety obligations – risk-based psychosocial safety: a framework for leaders and supervisors to demonstrate that they are working to meet their obligations

    By S Harrison

    Work health and safety duties around Australia include duties to manage psychosocial health and safety (mental health) of workers engaged by businesses or undertakings and of other persons impacted by

    Apr 16, 2024

  • AUSIMM
    Leadership in Projects – A Recipe for Success

    By A A. Roberts, R F. Dewhirst

    "Extensive literature surveys, research in the project environment and personal experiences both within and consulting to project teams have revealed some consistent ‘people factors’ that contribute m

    Mar 8, 2016

  • AUSIMM
    PIMS ù The Road to Efficient, Cost-Effective Plant Operation

    By D Hunter

    A production information management system (PIMS) was recently implemented at Queensland NickelÆs Yabulu Refinery. Although a strong business case was developed to justify the significant investment i

    Jan 1, 2003

  • AUSIMM
    Modelling Blast Movement for Grade Control at an Open Cut Gold Mine

    By E J. Sellers, A Cocker

    Movement of the fragmented rock mass is an inevitable consequence of open cut blasting. Uncontrolled, unaccounted movement from blasting commonly causes ore loss and dilution from waste mixing. Theref

    Aug 18, 2014

  • AUSIMM
    Direct reduced iron (DRI) – value of process monitoring using X-ray diffraction

    By M Pernechele, U König

    Most of the operating steelmaking capacity currently relies on conventional, coal-based steelmaking processes. Currently, direct reduced iron (DRI) is only produced in regions where energy is availabl

    Sep 18, 2023

  • AUSIMM
    Determination of Bulk Density in Anglo American plc, Methods and Impacts, with a Case Study from Los Bronces Mine

    By R M. Arellano, D M. W Harney, M Makhuvha

    Mineral resource and ore reserve estimates are founded on two sources of data: tonnage and grade. The tonnage is a product of volume and density; both of which are estimates. Density impacts numerous

    Aug 18, 2014

  • AUSIMM
    Drilling Techniques for Resource Estimation of Mineral Sand Deposits

    By M Z. Abzalov

    Drilling mineral sand deposits has specific challenges, which are different from drilling hard rock deposits: Drilled sequences are represented by non-consolidated free-flowing sands to semi-conso

    Oct 5, 2011

  • AUSIMM
    Characterisation of Long-Term Scaling Effects of Ceramic Filter Media Used in the Dewatering of Iron Ore

    By R Salmimies

    Choosing a ceramic capillary action filter is often favoured in processes where low energy consumption is important, such as the dewatering of iron ore. In addition, the performance of the filter medi

    Jul 11, 2011

  • AUSIMM
    A Geometallurgical Study of the Witwatersrand Gold Ore at Carletonville, South Africa

    By D L. Reid, G Nwaila, J Petersen, J-P Franzidis, Y Ghorbani, M Becker, F C. de Beer, L C. Bam

    Traditional methods of gold extraction have involved comminution and processing via cyanide leaching, all of which are associated with energy, cost and environmental implications. Subsequently, numero

    Sep 29, 2013

  • AUSIMM
    Surface Cooling at Kidd Creek Mine

    By K Hortin

    Kidd Creek mine in north western Ontario is developing phase 1 of the deep mine project for mining between 2100 m and 3100 m below surface. Heat problems were experienced during the 2003 summer in wor

    Jan 1, 2005