Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Possible Impact of New Safety Technology Developments on the Future of the United States Mining Industry

    The future of the United States (US) mining industry will be affected greatly by recent coal mining disasters. These have resulted in new legislation which will have an impact on mining economic costs

    Jan 1, 2008

  • AUSIMM
    Controlled Blasting for Civil Construction in an Urban Environment

    By R Domotor

    Brisbane’s Airport Link is Australia’s largest road infrastructure project, worth a total value of A$4.8 billion. The project is using surface and underground blasting to excavate hard volcanic r

    Nov 8, 2011

  • AUSIMM
    Geostatistical modelling of geometallurgical classes

    By W Patton, I Minniakhmetov, H Talebi, U Mueller

    The sustainability of mining projects is linked to informed investment decisions based on public reporting of exploration and mineral resource estimation results. In Australia, public reporting guidel

    Mar 22, 2022

  • AUSIMM
    Waihi Gold Mine's Community Story

    Waihi Gold Mining Company Limited, a wholly owned subsidiary of Normandy Mining Limited, operates the Martha gold mine, located in the township of Waihi, New Zealand. The operation, an unincorporated

    Jan 1, 2000

  • AUSIMM
    Challenges and Lessons Learnt Operating the Tiwest ‘North Mine’ (Cooljarloo Mine, Western Australia)

    By D Audeyev

    The Cooljarloo North Mine has been shaped not only by operational and processing challenges, but by climatic and economic factors. This paper outlines some of these challenges and discusses how the op

    Oct 5, 2011

  • AUSIMM
    Integrating Measurement, Systems and Leadership to Build Safe, Productive Cultures

    By M I. Roberts

    As Australia’s mining industry painfully retrenches, mining executives and managers strive to remain viable by seeking significant productivity increases directly through process improvement and indir

    Nov 4, 2015

  • AUSIMM
    High-speed Video – An Essential Blasting Tool

    By S Wellink, D Chalmers, D Adermann, C Martin

    The practice of recording blasts for quality control purposes has been conducted for several decades. However, at the low frame rates of a standard video camera, essential data is frequently missed as

    Aug 24, 2015

  • AUSIMM
    Alternative Access, Mining and Hoisting for Underground Deposits

    It is proposed to consider a new access, mining and hoisting system for underground deposits, as an alternative to the commonly used decline or vertical shaft access. The proposed system offers fundam

    Jan 1, 2000

  • AUSIMM
    The MTM copper process

    By R W. Shaw

    The MTM Process targets treating lower grade and/or problem concentrates that are not attractive to smelters. The process has been developed at laboratory scale for copper and is based on a related de

    Aug 24, 2022

  • AUSIMM
    Blast Fragmentation Measurement Based on Three-dimensional Imaging in Sublevel Caving Drawpoints and Underground Excavator Buckets at LKAB Kiruna

    By M J. Thurley, M Wimmer

    To assess the present-day functionality of large-scale sublevel caving at LKAB Kiruna a comprehensive measurement program was undertaken involving blast function, fragmentation and gravity flow. As pa

    Aug 24, 2015

  • AUSIMM
    Development Philosophy

    By Bruington T, Perkins J, Hutton R

    Natural resource developments are among the largest and most challenging projects taking place in the world. They involve capital intensive investment with long lead times and the management of geo

    Jan 1, 1997

  • AUSIMM
    Is the Python Right for Me? Python

    Gekko Systems Pty Ltd have developed the Python Underground Processing Plant for the concentration of gold and sulfide ores. The Python plant has an established flow sheet including fine crushing, scr

    Aug 1, 2010

  • AUSIMM
    Practical Approaches to Managing Business Critical Water Risk

    By A Tang, K Ringwood

    "Water is increasingly being recognised as a material business risk that many companies are still not well-equipped to deal with. Despite a raft of water-risk focused initiatives, methodologies and gu

    Nov 26, 2013

  • AUSIMM
    Introducing and Sustaining a Continuous Improvement Program in Mines and Smelters

    By M Costa, L Polizzi

    Process optimisation and continuous improvement are usually acknowledged when making a process more effective, efficient and transparent. During the last few decades, thousands of companies around the

    Sep 1, 2014

  • AUSIMM
    The Casposo Gold-Silver Project – Process Selection and Design

    By D Connelly

    Silver and gold bearing ore from the Troy Resources NL Casposo Gold-Silver Project, located within the San Juan Province of Argentina contains a complex mix of gold, silver, electrum and silver sulphi

    Aug 8, 2011

  • AUSIMM
    A Broker's Overview of Mineral Valuation Methodologies

    A broker relies heavily on mineral valuations and independent experts' reports to provide the fundamental information, both technical and commercial, which provides the basis of estimating the

    Jan 1, 1994

  • AUSIMM
    Quantifying economic and environmental impacts of preconcentration

    By E Amini, M Scott

    Grade Engineering® involves the planning, integration and operation of coarse preconcentration techniques to reject uneconomic material as early as possible in the mining value chain to improve the qu

    Nov 10, 2020

  • AUSIMM
    Application of Lateral Crater Test in Open Pit Blasting Parameters Optimisation

    By Y M. Wang, W Z. Liu, L F. Li, X L. Zhang

    Based on the blasting crater theory, the equation between k under typical cases and burden line, charge height was obtained by open pit bench blasting analysis model. The model was calculated with min

    Aug 24, 2015

  • AUSIMM
    Critical Assessment of Machine Learning Algorithms as Estimation Techniques for a Polymetallic Ore Deposit

    By D Misra, R Ganguli, S Bandopadhyay

    The objective of this paper is to assess the accuracy and applicability of recent state-of-art methods such as the machine learning algorithms (MLA) for mineral resource estimation. Conventional metho

    Sep 26, 2011

  • AUSIMM
    The Waterview Connection Project – Progress to Date

    By S Hanke, J Burden, P Spies

    The Waterview Connection will complete Auckland’s long-planned Western Ring Route, a 48 km north-south motorway alternative to State Highway 1 that bypasses the central city to the west. The project i

    Sep 17, 2014