Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Nova-Bollinger reconciliation and riskBy C Laming, P M. Hetherington, F A. Pym, M P. Murphy, K E. Crook
Reconciliation is a powerful tool used by mining operations to compare the mass and grade of ore produced with what was estimated before mining. The primary objective of reconciliation is to verify th
Mar 22, 2022
-
Integrating Sustainability Principles into Mineral Processing Plant DesignBy G Corder
Even though most major operating companies in the minerals industry have Board-level endorsed sustainability principles and objectives, design engineers typically have no mechanism that allows them to
Aug 8, 2011
-
Building AsiaÆs Latest Hard Rock MineBy T J. V Duffy, L H. D Siahaan, P G. Albert
G-ResourcesÆ Martabe Mine in North Sumatra, Indonesia, is a US$700 M world-class and world-scale operation in a country which, with a few notable smaller scale exceptions, has had no significant hard
Nov 20, 2012
-
Application of enterprise optimisation considering ultra high intensity blastingBy J Pan
This case study assesses the application of Mine-to-Mill optimisation combined with Whittle Consulting’s Prober<sup>®</sup> economic optimisation for the purpose of economic value upl
Nov 21, 2018
-
New Innovations in Field Portable X-Ray Fluorescence for the Iron Ore IndustryBy S Bailey
In-field sampling programs generally take time, equating to money, and unless you have an onsite laboratory, you have the issue of having to wait long periods for your data. Until recently, field port
Jul 11, 2011
-
Mentoring and Your CareerYoung professionals are riding the current wave of high demand for their services and relatively little competition for placements. The attraction and retention of quality incumbents has therefore bec
Jan 1, 2006
-
A Remote, Rapid and Accurate Three-dimensional Ore Waste Boundary Tracking SystemBy A T. Spathis, K E. Leslie, K R. Blay
Many open pit mining operations seek to control blasting-related movement of ore and waste to minimise loss and dilution. Tracking the movement of ore boundaries can result in the maximisation of ore
Aug 24, 2015
-
Ground Support Design and Application for Developing in Pastefill at BHP Billiton – Cannington MineBy J Li
Cannington Mine has been developing through paste backfilled stopes since the year 2000. These paste drives have been used as either production drill accesses or long-term bypasses. Prior to this stud
Mar 21, 2011
-
Directional Blasting Rock Cutting TechnologyBy W Z. Liu, Q Q. Shi, H T. Yang, X L. Zhang
In order to improve the cutting blasting effect of dimension stone mining, the water coupling directional cutting blasting technology was put forward. Based on the test apparatus and special charge co
Aug 24, 2015
-
Control System Selection, Strategy and the Future at Pasminco Mining - Broken Hill's Southern ConcentratorIn 1987 the control strategies at the then ZC Mines' New Broken Hill Consolidated concentrator were a miscellaneous mixture of computer hardware and technology for ISA, grinding and residue thi
Jan 1, 1991
-
Supervisors and Teams at WorkBy T G. Neville, G Terrey, J Burns
This paper explores recent industry training programs and lessons for supervisors. The Belbin Team Role model was used to increase participants’ awareness of behaviour and its application. The applica
Jun 22, 2016
-
Improving industrial copper processing operations through the application of thermodynamic fundamentals and advanced predictive toolsBy G R. F Alvear Flores
Mineral resources are becoming more complex in composition and structure making it more difficult to produce clean concentrates for primary metal smelting. In parallel, providing technological solutio
Jun 17, 2024
-
Integrated process modelling for the Kalgoorlie Nickel SmelterBy G Sartor, A Rich, D Grimsey, R Forzatti, M White
An in-depth process model was developed for the pyrometallurgical, off-gas systems and water balance of the Kalgoorlie Nickel Smelter. This model was used to assess plant capacity with changing concen
Aug 21, 2024
-
Development of a remotely operated robotic mechanism for accessing and removal of metal tramp from primary gyratory crushersBy H Lemos, E Nunes, D Jacobson, R Costa, L Ono, A Alves, H Delboni Jr
Oversize rock breaking and metal tramp removal are key issues for reducing primary crusher downtime, as well as improving the safety associated with its operation. Remote operation of such tasks would
Nov 8, 2021
-
Development Strategy of the Trident Underground Gold MineAvoca Resources LimitedÆs Higginsville Gold Project has a resource base of over 1 300 000 oz of gold. The Trident underground mine, which forms the basis of the project development, has a resource bas
Jan 1, 2008
-
Cable Tunnel VentilationBy P Ridley
EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil
Mar 8, 2011
-
Mining Administration and LegislationThis paper discusses some topical issues on the mining administration and legislation fields including: 1. Licensing û Administration and associated specialist functions including:Processin
Jan 1, 1982
-
Esmeralda Mine Exploitation ProjectBy P Crorkan
Within the framework in which future exploitations for Codelco-Chile Divisi=n El Teniente are situated, regarding the deepening of its reserves and the geotechnical problems that affect their recovery
Jan 1, 2000
-
Conversion of a Pelletising Induration Furnace from a Haematite to Magnetite FeedBy R Jones
OneSteel Whyalla’s grate-kiln-cooler pelletising plant was commissioned in 1968 processing haematite feed from the local South Middleback Ranges mining area. The existence of a magnetite resource bene
Jul 11, 2011
-
Attritioner Scrubber Performance EvaluationBy O S. Maluleke
In some deposits valuable heavy mineral quality is poor due to increased mineral surface coatings from higher slimes and more competent sand orebodies. Mineral surface coating can include silica or al
Oct 5, 2011