Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Use of Psychometric, Thermodynamic and Transport Property Software in Mine Ventilation and Gas Drainage CalculationsBy T J. M Harvey
This paper gives an overview of the ASHRAE LibHuAirProp, CoolProp and REFPROP software packages. These packages were predominantly developed for heating, refrigerating and air conditioning engineers a
Aug 31, 2015
-
Drill hole spacing analysis for classification and cost optimisation – a critical review of techniquesBy J Levett, O Rondon, I Glacken
Reporting Codes are not prescriptive on methodologies to report or classify Mineral Resource Estimation results, but the assessment of risk and uncertainty is required, and is likely to be increasingl
May 24, 2023
-
Evaluation of the environmental benefits of using a conveyor belt mining system in an open pit mineBy G P. S Resende, D E. G Oliveira, E A. S Baeta, T F. Bravin
There is currently in the mining industry, as well as in other industries, a movement seeking to increase investments in decarbonisation processes to help combat global warming. Among some initiatives
Sep 18, 2023
-
Sampling Systems for Process Control and Metallurgical AccountingBy F F. Pitard
The optimisation of a metallurgical plant requires two kinds of sampling systems. The first provides samples to follow process changes, so in due time actions to maintain key parameters within pre-est
Jul 29, 2014
-
Implementing and Improving the Mine Plan at the Mt Wright ProjectBy D MacKay
The Mt Wright Project is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. Underground Development of
Mar 21, 2011
-
Platinum Mining and Sustainability - Understanding the Environmental Costs of Future TechnologiesBy G M. Mudd
The growing popularity of platinum and platinum group metals (or PGMs, including palladium, rhodium and others) for a wide range of applications leads to some interesting issues for mining and sustain
Jan 1, 2009
-
Effective Use of Mine Waste in the Design of a Residue Storage Facility, Pilbara Region, Western AustraliaBy A Wanninayake, E Novello, I Gillani
A residue storage facility (RSF) was designed to cater for Davidson Creek Area and Robertson Range Area operations under the FerrAus Pilbara iron ore development project in the Pilbara Region, Western
Aug 12, 2013
-
The importance of rate of rise in life-of-mine planning of an upstream raised tailings storage facility – a case studyBy D A. Williams, P J. Chapman
The acceptable rate of rise of the tailings beaches on upstream-raised tailings storage facilities (TSFs) is critical to life of mine planning. This is illustrated through a case study in Western Aus
Jul 23, 2018
-
An assessment of battery trolley systems’ performance in surface minesBy H Bao, M Nehring, M Kizil, P Knights
The mining sector, a notably energy-intensive industry worldwide, is a major consumer of fossil fuels, leading to significant carbon emissions globally. The move towards electrification, coupled with
Sep 1, 2024
-
Development of an Aquatic Habitat and Water Resource in Closing Out the Enterprise PitBy Fawcett M
Pine Creek Goldfields Limited (PCG) is rehabilitating the Enterprise Pit to an aquatic habitat and potential water resource. This paper discusses the development and implementation of that plan. Pin
Jan 1, 1994
-
Regional Trade-Offs Between Mine Water and Energy Use - A Water Treatment Case StudyBy A Woodley, G Keir
The mining industry faces concurrent pressures of reducing water use, energy consumption and greenhouse gas (GHG) emissions in coming years. However, the interactions between water and energy use, as
Nov 26, 2013
-
Quality Assurance Standards for Mine Ventilation Models and Ventilation PlanningBy D J. Brake
Most mine ventilation engineers are involved in ventilation planning and design in some capacity. Ventilation modelling software used by a competent experienced ventilation engineer is extremely usefu
Aug 31, 2015
-
The Wonawinta Silver Project – Value Engineering at WorkBy P G. Greenhill
The Wonawinta silver project near Cobar in NSW is under development by Cobar Consolidated Resources Limited (CCR). RMDSTEM Limited is part of the owner’s team for feasibility, design, engineering, con
Aug 8, 2011
-
The Benefits of Technology Partnerships during Brownfield UpgradesBy S Morgan, L C Pagdalian, S Serdzeff, C Malaloy-on
It is widely accepted that mineral deposits are decreasing in metal grades. To remain profitable and meet market demand, mining companies are expanding their operations by increasing the tonnage treat
Sep 1, 2014
-
No entry mechanised presink of the Wira Hoisting ShafBy D Kilkenny
This paper discusses the use of a mechanised shaft sinking machine Herrenknecht Vertical Shaft Sinking Machine (VSM) – to conduct the 93 m presink for the Wira Hoisting Shaft at the Prominent Hill Min
Mar 29, 2023
-
Screen Media Aperture Size Measurement Using MetsoÆs Screen TrackerBy G van Niekerk, M Wortley
Screening is a critical part of many mineral processing circuits and keeping the aperture of the screening media within specification is vital to ensure efficient performance of the processing plant.
Sep 26, 2011
-
Preliminary Design for the Rockwater Power Project, South Island, New ZealandBy H Asche
The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak
Mar 8, 2011
-
Measuring spatial domain models’ uncertainty for mining industriesBy S A. McManus
With the advances in software speed and capability, many of us now are running multiple scenarios on entire models rather than just testing small areas or a few blocks. In the authors experience both
Mar 22, 2022
-
Concentrating Practice of the Broken Hill South Limited, Broken Hill, New South Wales, AustraliaBy Read T. A
THE Broken Hill South Ltd. is one of ten companies operating on the Broken Hill lode (See Fig. 1). It has two leases-Blocks 7 and 8-of a total length of 2250 ft. on strike of lode.From the surface to
Jan 1, 1921
-
Optimal Inference of Modelling Parameters to Simulate Complex Trends across Soft Boundaries – A Case Study in Heavy Mineral SandsBy T Wambeke, J Benndorf
A risk-robust development of a heavy mineral resource requires an assessment of the geological uncertainty and spatial variability of the key factors impacting the mining and processing operation. Att
Nov 24, 2014