Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Changing Trends in Column Flotation Use – Their Impact for Australian Mill Operators

    By D Frost, G Harbort, T Lipiec, N Deonarain

    "The use of flotation columns has remained a contentious issue among mill operators. There are those who consider them an essential part of any mineral processing operation, while others consider them

    Oct 10, 2016

  • AUSIMM
    Case Study – Underhand Cut and Fill Stoping using Cemented Tailings Paste Fill at the Lanfranchi Nickel Mine

    By J Foster

    The Lanfranchi Nickel mine is located approximately 48 km south of Kambalda in Western Australia. Mining first commenced in the mid-1970s under the previous owner, Western Mining Corporation Ltd. Afte

    Mar 21, 2011

  • AUSIMM
    Curved Pulp Lifters – Can They Save Energy?

    By R J. Soriano, S Ciutina

    The Masbate gold deposits are situated on the island of Masbate, 350 km south of Manila. A new plant was commissioned in April 2009. The grinding circuit consists of one semi-autogenous (SAG) mill Ø9.

    Sep 1, 2014

  • AUSIMM
    Nova-Bollinger unfolding versus DA estimate

    By P M. Hetherington, M P. Murphy, K E. Crook, F Pym

    Resource characterisation is critical for informed decisions in both strategic and operational space. The sources of information for resource characterisation are limited by: direct measurement of res

    Mar 22, 2022

  • AUSIMM
    Some Notes on the Equipment of the Electrolytic Zinc Company of Australasia Limited, at Rosebery, Tasmania

    The purpose of this paper is to list by tabulation and flow sheet, the operating equipment and installations in use at Rosebery, and to refer to particular items which may be of interest for purposes

    Jan 1, 1949

  • AUSIMM
    The Use of Glass-Fibre Reinforced Plastic on the Northern Sewerage Project Stage 1 – Design and Construction Considerations

    By S Goff

    The Northern Sewerage Project (NSP) is a $650 M infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs while also helping to protect the

    Mar 8, 2011

  • AUSIMM
    Cooling on demand – the next step in ventilation automation

    By F C. D Michelin

    As mines get deeper, the critical underground temperature limits will be exceeded, and an increasing number of mines will need to implement, expand or modify cooling systems. Surface cooling plants ha

    Oct 12, 2022

  • AUSIMM
    Resource Efficient Mining Processes of Tomorrow

    By P Holtham, K Duffy, W Valery, A Jankovic

    In the face of increasing energy costs, limited water resources, more stringent legislation, and lower feed grades, the mining industry is searching for more sustainable technologies and practices. Me

    Nov 4, 2015

  • AUSIMM
    "Geometallurgy – Driving Innovation in the Mining Value Chain"

    "Geometallurgy is a discipline that seeks to improve the sustainability of the extraction of metals and minerals by promoting the smarter use of non-renewable resources, better energy efficiency and g

    Jun 15, 2016

  • AUSIMM
    Automated Textural Classification of Iron Ores Using æRecognitionÆ ù A Specialised Software Package for Studying Iron Ores

    By J M. F Clout

    Geological, textural and mineralogical classification of iron ores is routinely conducted by mine and exploration geologists on reverse circulation percussion, blasthole cone and bulk samples for grad

    Jan 1, 2005

  • AUSIMM
    Optimisation of cemented rock fill strength for open stope support

    By J Player, R de Vries, E Villaescusa, H Saw, R Hassell

    The use of cemented rock fill (CRF) for support of open stope walls has increased in the Australian underground mines operations over the last five years due in part to its low capital cost. In open s

    Oct 16, 2017

  • AUSIMM
    Quantifying Geotechnical Risk in the Mine Planning Process

    By T P. Medhurst

    In many cases mine design is the most important driver of the profitability of a mining project, however to reach an æoptimumÆ mine plan many compromises have to be made. Some of the fundamental profi

    Jan 1, 2000

  • AUSIMM
    Building Safe, Productive Cultures and Leadership

    By M I. Roberts

    Corporate and workplace culture, as many owners, directors, executives and managers know, is by far the most powerful determinant of productivity. It’s much more significant than buildings and equipme

    Jun 22, 2016

  • AUSIMM
    Australia’s hydrogen export in the form of embedded mineral derivatives

    By R Daiyan, G Burge, M Haider Ali Khan

    Australia’s mineral and metal exports have a substantial carbon footprint, twice that of its domestic emissions, mainly due to fossil-fuel-dependent downstream processes like processing into secondary

    Sep 1, 2024

  • AUSIMM
    Managing Collaboration Effectively at Newcrest

    By J Jones

    A common problem in the mining industry is that company exploration groups operate in relative isolation to the rest of the company; resulting in poor knowledge transfer (Qureshi and Briggs, 2006

    Aug 22, 2011

  • AUSIMM
    Local uncertainty benchmarking – a coal case study

    By R Saha, D Barry, C Mawdesley, O Bertoli

    Kriged estimates are not typically calculated on blocks substantially smaller than the sample spacing (eg the Standard Mining Unit or SMU). Moreover, the sample spacing for quality variables is often

    Sep 20, 2017

  • AUSIMM
    The Effect of Particle Size Distribution in Electrostatic and Magnetic Separation on Mineral Recovery and Yields

    By J Ledgerwood

    Namakwa Sands is a mineral processing company based on the West Coast of South Africa and is solely owned by Exxaro Resources Limited. Mineral ore is mined and processed, concentrated and both chemica

    Oct 5, 2011

  • AUSIMM
    Blast movement monitors or polypipe? A study into cost-effective blast movement monitoring at White Foil gold mine, Western Australia

    By M E. Watson

    Minimising dilution and ore loss is an important part of ensuring profitability of a gold mining operation. White Foil open pit gold deposit is a low-grade deposit and therefore managing ore quality i

    Sep 20, 2017

  • AUSIMM
    Use of Paste for Tailings Disposal (b5c201be-4c25-4c8e-a498-2a2e4672d3d4)

    By Shillabeer J

    Paste backfill has been adopted by many underground mines in North America and a growing number elsewhere. Paste offers a number of advantages. This paper suggests wider applications of paste techno

    Jan 1, 1998

  • AUSIMM
    Recent Advances in Iron Ore Sintering

    By O Ishiyama, L Lu

    Sintering is the most economic and widely used agglomeration process to prepare iron ore fines for blast furnace use. Due to the depleting reserves of traditional high-grade iron ore, there have been

    Jul 13, 2015