Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Systems Approach for the Application of Eco-Efficiency Indicators for Process Design in the Minerals Industry

    By H von Blottnitz, J L. Broadhurst

    Eco-efficiency has been proposed by the World Business Council on Sustainable Development as an environmental performance indicator framework that contributes to sustainability by assisting corporate

    Jan 1, 2009

  • AUSIMM
    A Formal Approach to Economic Analysis of Pit Slope Design

    By Coates D. F, Neil T. J, O&apos

    A proper economic analysis of pit slope design must reflect the trade-off between the benefits and the increased risks of slope fail- ure inherent in steeper slope angles. However, no formal framewo

    Jan 1, 1977

  • AUSIMM
    Criteria for the Design of Emergency Refuge Stations for an Underground Metal Mine

    By G P. Bates

    The rationale for the design of the Emergency Egress (escape andentrapment) strategy for one underground metal mine has beenpreviously described (Brake, 1999). Two of the key conclusionsfor this mine,

    Jan 1, 1999

  • AUSIMM
    Development of State-of-the-art Connection Types for Pipe Umbrella Support Systems

    By G M. Volkmann

    Pipe umbrella support systems – also called canopy tube systems – have been used successfully for tunnelling in challenging ground conditions since the 1970s. Historically, the drilling unit was the l

    Sep 17, 2014

  • AUSIMM
    Preconcentration in the pit – size matters

    By T BoBo, D La Rosa, P Cameron

    Efficient pre-concentration using natural and induced deportment starts with effective blast design. Leveraging these characteristics using Size-Based Grade Engineering® techniques requires detailed u

    Nov 10, 2020

  • AUSIMM
    Making a positive change – evolving the modern Integrated Remote Operations Centre (IROC) to optimise and support carbon-neutral value chains

    By G McCullough, J Els, J Bassan

    Integrated Remote Operations Centres (IROCs) have a crucial role in optimising a mine’s carbon emissions, especially as industry faces an imperative to achieve net-zero emissions on an accelerated tim

    Sep 18, 2023

  • AUSIMM
    Influence of Cognitive Biases on Project Evaluation

    By S Love, M Anderson, M Boland

    "The high rate of failure of new mine developments to meet feasibility study expectations has been the subject of many fine technical papers. Yet failure rates remain stubbornly high.Similarly, the co

    Mar 8, 2016

  • AUSIMM
    Better Prediction of Performance of a Slope Using Time-series Monitoring Data at Multiple Points in a Multistep Excavation

    By L M. Zhang, X Y. Li

    Surface displacements are routinely monitored at multiple points during slope excavation. The monitoring data reveals the safety status of the slope under current loading conditions. They can be used

    Nov 5, 2014

  • AUSIMM
    Determination of the Complete Sampling Distribution for a Particulate Material

    By G J. Lyman

    The theory of sampling has progressed slowly over the last century. The concepts of correct sampling were known to mining engineers such as D W Brunton in the 19th century. It was recognised early in

    Jul 29, 2014

  • AUSIMM
    The Value of Geological Human Capital in the Improvement and Maximisation of Ore Deposit Value – The Kalgoorlie Consolidated Gold Mines Experience

    By D Cooke

    In 2010, Kalgoorlie Consolidated Gold Mines (KCGM) was Australia’s largest gold producer, with total annual production of 788 000 ounces. Of the gold produced by KCGM in 2010, 95 per cent was extracte

    Aug 22, 2011

  • AUSIMM
    Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fill

    By D Pateman, F de Fredrick

    The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)

    Mar 15, 2021

  • AUSIMM
    The Preparation of Pastefill and its Use at Some Canadian Mines (6e4bc1a5-4335-470a-b421-2dd830dbe3e2)

    Two key elements in the design of a pastefill or high density hackfill system are the preparation of the backfill material and its distribution underground. This paper examines these two areas. Owin

    Jan 1, 1998

  • AUSIMM
    Dynamic Simulation in Iron Ore Pelletising Plants

    By P Navarra, R Kuhne

    Dynamic simulation (discrete event simulation) is the preferred methodology to evaluate the impact of dynamic aspects of processing plants on the overall plant capacity. This tool can be used to: iden

    Jan 1, 2009

  • AUSIMM
    Sulfidisation-Acidification-Recycling-Thickening (SART) for Complex Gold Ores

    By A Hall, D Kratochvil, P Littlejohn

    Economic recovery of gold from complex gold ores, including poly-metallic deposits, is impacted by the presence of cyanide-soluble base metals. These base metals can create both a metallurgical challe

    Sep 26, 2013

  • AUSIMM
    Interactions between Flash Flotation and Gravity Concentration – An Industrial Case Study of a Refractory Gold Concentrator

    By D Semini, B Newcombe

    Base-metal sulfide refractory gold ores often contain a portion of ‘free’ gold that is amenable to recovery using gravity concentration methods, whilst the refractory portion of the gold is better rec

    Sep 1, 2014

  • AUSIMM
    Towards the Elimination of Conventional Surface Slurried Tailings Storage Facilities

    By D J. Williams

    The approach to the disposal and storage of mine tailings is slowly evolving. Tailings disposal has been based on minimising short-term capital and operating costs, with rehabilitation costs discounte

    Jul 27, 2015

  • AUSIMM
    Optimum Dig Lines for Open Pit Grade Control

    By I Treloar, T Elenbaas, E Isaaks

    Critical reviews of grade control generally focus on blasthole sampling and the estimation of ore control block model (OCM) grades, with little or no attention given to dig-line design. For example, t

    Aug 18, 2014

  • AUSIMM
    The Use of Geotechnical Instrumentation to Optimise an Engineered Mine Design at Beaconsfield Gold Mine, Tasmania

    By P B. Hills, R J. Walton

    Geotechnical instrumentation has been implemented as a key step for monitoring and optimising an engineered mine design for managing seismicity at the Beaconsfield Gold Mine. Measurements of displacem

    Jan 1, 2008

  • AUSIMM
    Pre-concentration – more than bulk ore sorting

    By P Holtham, K Duffy, L Pyle, W Valery

    The mining industry is becoming increasingly focused on pre-concentration due to its potential economic and environmental benefits, particularly for the more complex, low-grade, high throughput operat

    Aug 24, 2022

  • AUSIMM
    Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based Simulators

    By P Wood, S Leveritt

    This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy

    Sep 18, 2012