Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A standardised method for the precise quantification of practical minimum comminution energyBy D K. Weatherley, G R. Ballantyne, S Ali, M Yahyaei, M S. Powell
This paper explores development of a novel ore characterisation method for the precise measurement of practical minimum comminution energy. A monolayer of particles with a narrow size distribution is
Aug 24, 2022
-
Making Studies Work – Organisation, Communication and ManagementBy P McCarthy
"This paper is based on 30 years of involvement in feasibility studies as a participant, study manager and the leader of a firm that provides study components and overall study management. The followi
Mar 8, 2016
-
Owner-Operator versus Contractor Production Scheduling - A Vision for the Effective Exploitation of Australian Gold Resources by Surface MiningBy R Halatchev
Production scheduling optimisation in open pit gold mining is a complex problem as it is driven by economic criteria reflecting particular economic interests of the concerned parties in the mining bus
Sep 26, 2013
-
Managing continuous improvement of Mine to Mill begins with measurementBy J Loeb, R Ramanathan, H Ingham, P Cameron
Most mining operations, including iron ore, maintain a focus on continuous improvement and asset optimisation in their operations. As all the unit operations in the Mine-to-Mill value chain are interd
Nov 8, 2021
-
Energy and Water Requirements in the Treatment of Refractory Gold OresBy R Dunne, J Dodd, J Snyder, F Roberto
Energy costs are steadily increasing worldwide while the availability and quality of water are becoming contentious issues between the users (municipalities/households, agriculture, manufacturing and
Sep 26, 2013
-
Grade control and deleterious materials in polymetallic depositsBy R J. Goldie
The Monty Copper Gold Deposit is an ultra-high grade mine in Sandfire Resource’s Doolgunna region which was completely drilled out and developed within two years of commencing mine development. During
Mar 22, 2022
-
Strategic Optimisation at Sierra Rutile - A Case Study in Maximising Project ValueBy P Myers, T Elkington, S Wonday
Sierra Rutile LimitedÆs (SRL) heavy mineral sand mining operation in Sierra Leone, West Africa, is embarking on a new phase of its life. After confronting many challenges during the 1990s and 2000s, S
May 24, 2012
-
"Development of a Synthetic Ore Deposit Model for Geometallurgy"By V Lishchuk, C Lund
"Geometallurgy aims to improve resource efficiency by creating a spatial model of an orebody in order to forecast ore processing behaviour. This enables calculation of the economic value of each ore b
Jun 15, 2016
-
Using high-efficiency downhole assay to improve the financial performance of open pit copper mining operationsBy H Rossiter, A Maddever, J Market, P Jeanneau, A Virani
It is generally acknowledged that the head grade of the world’s copper resources is declining. Accordingly, there is an increase in the volume of resource material being mined and processed to maintai
Nov 10, 2020
-
Strategies for Mine Planning and DesignBy S Coward, C Xu, P A. Dowd
"This paper provides an assessment of the current challenges in strategic mine planning and design and suggested approaches for addressing them. The specific challenges covered are: realistic quantif
Nov 24, 2014
-
Building a Geometallurgical Model for the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru - Past, Present and FutureBy M Dusci, A Trueman, S Poos, R Baumgartner, M Brittan
The Canahuire epithermal Au-Cu-Ag deposit in southern Peru is a complex and challenging deposit for metallurgical studies. It has issues of gold locking in sulfides and non-sulfides, deleterious eleme
Sep 29, 2013
-
Cost Management OptimisationBy B King
Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro
Nov 24, 2014
-
Transient slag behaviour in the Direct Reduced Iron (DRI) and scrapbased Electric Arc Furnace (EAF) process – case study for high and low-grade DRI inputBy S K. Panda, M A. Van Ende, S Chatterjee
Tata Steel Netherlands (TSN) aims to reduce its CO2 emissions by 35–40 per cent by 2030 and become CO2 neutral by 2045. A first step to reach these targets is via the utilisation of an Electric Arc Fu
Jun 19, 2024
-
Plant rejects disposal strategies applied at Caval Ridge open cut coal mineBy J Li, H Hooi, D Payne
Caval Ridge Mine (CVM) is one of the newly established open-cut coal mines of BHP in Queensland, where no tailings dam is planned to be built in order to minimise environmental impacts from mining act
Jul 23, 2018
-
Developing and maintaining mine site ventilation capability and new trends in mine ventilation career pathsBy D J. Brake
The importance of mine ventilation to health and safety in both coal and metalliferous mines has been long recognised. The primary and secondary ventilation systems in most metalliferous mines incur 5
Oct 12, 2022
-
The use of Geometallurgy to Estimate Comminution Parameters within Porphyry Copper DepositsBy G J. Harbort, K Lam, C Sola
The relationship between the geology of porphyry copper deposits and their processing performance is an area of interest. Being able to predict comminution properties of the ore from physical characte
Sep 29, 2013
-
Jaguar Raisebore design using LiDAR for back analysisBy R P. Varden
This paper looks at the design of the Bentayga raisebore with subsequent back analysis using a LiDAR survey. A search for LiDAR raisebore assessment publications shows little work has been done on thi
Mar 15, 2021
-
Go with the flow – managing hydrogeological staff turnover at Ernest Henry mineBy C Hawtin, B Miller, D Ashton
Ernest Henry mine (EHM) is an Iron oxide copper-gold sublevel cave mine located 30 minutes north of Cloncurry in North-West Queensland. The underground mine lies beneath open pit excavations, which we
Sep 20, 2017
-
Contract Considerations and Other Critical Ventilation Aspects in Achieving a New Mine Ramp UpBy B Broad
"Establishing ventilation in the early stages of a new mine is an essential step to achieve scheduled outcomes that ultimately drive the financial success of an operation. If the primary ventilation i
Jul 1, 2013
-
Autogenous Grinding in the Warrego Concentrator of Peko Mines N.L.By Stevenson C. H, Lynch A. J
The reasons for choosing autogenous grinding for the new Warrego concentrator of Peko Mines N.L. are discussed and the ores to be treated in the concentrator are described. The mill was designed on t
Jan 1, 1974