Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Improving Geological and Metallurgical Understanding of Plutonic Gold Mine, Western Australia, using Three-Dimensional Visualisation of Portable X-Ray Fluorescence DataBy M F. Gazley
The amphibolite-facies metabasaltic rocks of the Mine Mafic Package at Plutonic Gold Mine, Marymia Inlier, Western Australia, contain an estimated total endowment of 12.2 Moz of Au, which includes 4.7
Aug 22, 2011
-
Improving the dewatering efficiency of clay-rich tailings in saline waterBy D Liu, M Edraki, L Berry
The presence of clay minerals slows down the settling rate and mitigates compact consolidation efficiency in tailings dewatering. The increasing use of saline water in many plants, affects the dewater
Jul 23, 2018
-
One Orebody ù Two Tenements ù Multiple Owners: How to Apportion Costs and Production Equitably Over the Mine Life?Production sharing and cost apportionment in joint ventures is commonplace in Australasia today and elsewhere. It is a recognised convention that, with the exception of a free carry situation, joint v
Jan 1, 2002
-
True Pipe Sampler – A Correct Design Utilising the Principle of Symmetry in Pressurised Slurry Particulate StreamsBy G J. Halstead, R C. Steinhaus
The True Pipe® in-line sampler was developed in an attempt to address the need for a mechanically reliable and correctly designed sampler to suit one-dimensional pressurised slurry pipelines, often fo
Jul 29, 2014
-
Reduced Development through improved Rise and Widening Firings using Orica WebGen™ at Ernest Henry MineBy J Say, M Hawtin, L Carlon, P Cann
Historically, production from sublevels of the Ernest Henry Mine (EHM) started from blind uphole rises at the end of slot drives. Where previous investigations considered removing these slot drives an
Mar 15, 2021
-
Dilution rating system (DRS)By C Nyoni, T Nguyen, C R. W Seymour, G D. Dempers
Unplanned dilution directly adds cost to production from mining, milling, tailings disposal and administration. Additionally, unplanned dilution decreases the productivity, profitability and may affec
Mar 15, 2021
-
Rock Bolts for Permanent Tunnel LiningBy J de Witte
When used in suitable ground conditions, rock bolts can have advantages over other permanent tunnel lining solutions. Permanent rock bolts offer flexibility in tunnelling profile and rapid rock bolt i
Mar 8, 2011
-
Closure Cost Estimation - All Things to All Men?By H Jones
Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates
Nov 20, 2012
-
The challenges of the reuse of tailings and overburdenBy E M. Gama, L Resende
The tailings are waste from mineral processing operations. The type of tailings of iron ore processing are classified into sandy tailings and mud. Already the overburden are showing significant levels
Jul 23, 2018
-
Moisture/particle interactions under oscillatory motion – model developmentBy K Williams, A Lavrinec, V Gurung, D Ilic
The moisture content of iron ore during handling can range from the dust extinction moisture at the point of arrival at the port to the transportable moisture limit at the point of loading ships for m
Sep 18, 2023
-
Carrapateena Crows Foot Level Layout – Safety in design to support sub level cave production efficiency and automationBy A Mooney, J Marsden, H Grosser, G Dunstan
Carrapateena is a copper-gold deposit hosted in a brecciated granite complex, located 500km North of Adelaide, South Australia. The deposit is being mined using the Sub Level Caving (SLC) Mining metho
Mar 15, 2021
-
Real-time Mining – Moving Towards Continuous Process Management in Mineral Resource ExtractionBy N Jeannee, L Rattmann, M W. N Buxton, A deJong, K Nienhaus, A Soares, P Graham, A Korre, J Benndorf, D Buttgereit
The flow of information, and consequently the decision-making along the chain of mining from exploration to beneficiation, typically occurs in a discontinuous fashion over long timespans. In addition,
Nov 4, 2015
-
In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit ClosureBy D J. Robinson, L L. Kuhar
"Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to
Nov 15, 2016
-
Technology change by regulation – a cresting wave?By J D. Pease, J M. I Tuppurainen, P D. Munro
This paper examines how legislation and regulation can be external drivers of technical change in mineral processing and extractive metallurgy and how the industry can respond. Two examples are consid
Sep 11, 2017
-
A day in the life of a mineworker in 2045By G McCullough, J Bassan, d P. Knights, C T. Farrelly
By 2045, carbon-neutral mines will be economically producing products that are vital for the world’s transition to renewable energy. After overcoming significant technical challenges (and the investme
Sep 1, 2024
-
"Optimisation of Mining Policy Under Different Economical Conditions Using a Combination of Non-Linear Programming and Genetic Algorithm"By A Esfahanipour, M Osanloo
Determination of cut-off grade?strategy is one of the most important stages of open pit mine planning and design. It is the parameter directly influencing the financial, technical, economic, legal, en
Sep 26, 2011
-
The Gameta Gold Deposit Fergusson Island, Papua New GuineaBy Ibil S
The Gameta Gold Deposit is located on the north-eastern corner of Fergusson Island in the D'Entrecasteaux Islands of Milne Bay Province, PNG, at lat. 9¦ 25' 5, long. 150¦ 47' E or AMG
Jan 1, 1997
-
The ABC of Mine to Mill and Metal Price CyclesBy J Pease, P Cameron, D Drinkwater
"In the 1990s metal prices were trending in a long-term decline and the usual cost-cutting exercises were adopted. Cuts to research and development made innovation difficult and the outlook was grim.
Oct 10, 2016
-
Water Conservation at Construction ProjectsBy B Hannah, M Uriarte, F Labarca, C Madore, G Ganapathi, L Martin, T Haase
BechtelÆs Mining and Metals projects across the globe are executed in remote arid and semi-arid countries where providing even basic water supplies impose considerable challenges. Opportunities for wa
Nov 26, 2013
-
Improving the Flexibility of the Mount Gordon Ferric Leaching ProcessBy G Richmond, J R. Glen
Western Metals Mt Gordon Operation is a copper mine and processing plant situated 120 kilometres north of Mt Isa. The unique Mt Gordon copper process utilises a whole of ore acid/ferric pressure leach
Jan 1, 2003