Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Improving Geological and Metallurgical Understanding of Plutonic Gold Mine, Western Australia, using Three-Dimensional Visualisation of Portable X-Ray Fluorescence Data

    By M F. Gazley

    The amphibolite-facies metabasaltic rocks of the Mine Mafic Package at Plutonic Gold Mine, Marymia Inlier, Western Australia, contain an estimated total endowment of 12.2 Moz of Au, which includes 4.7

    Aug 22, 2011

  • AUSIMM
    Improving the dewatering efficiency of clay-rich tailings in saline water

    By D Liu, M Edraki, L Berry

    The presence of clay minerals slows down the settling rate and mitigates compact consolidation efficiency in tailings dewatering. The increasing use of saline water in many plants, affects the dewater

    Jul 23, 2018

  • AUSIMM
    One Orebody ù Two Tenements ù Multiple Owners: How to Apportion Costs and Production Equitably Over the Mine Life?

    Production sharing and cost apportionment in joint ventures is commonplace in Australasia today and elsewhere. It is a recognised convention that, with the exception of a free carry situation, joint v

    Jan 1, 2002

  • AUSIMM
    True Pipe Sampler – A Correct Design Utilising the Principle of Symmetry in Pressurised Slurry Particulate Streams

    By G J. Halstead, R C. Steinhaus

    The True Pipe® in-line sampler was developed in an attempt to address the need for a mechanically reliable and correctly designed sampler to suit one-dimensional pressurised slurry pipelines, often fo

    Jul 29, 2014

  • AUSIMM
    Reduced Development through improved Rise and Widening Firings using Orica WebGen™ at Ernest Henry Mine

    By J Say, M Hawtin, L Carlon, P Cann

    Historically, production from sublevels of the Ernest Henry Mine (EHM) started from blind uphole rises at the end of slot drives. Where previous investigations considered removing these slot drives an

    Mar 15, 2021

  • AUSIMM
    Dilution rating system (DRS)

    By C Nyoni, T Nguyen, C R. W Seymour, G D. Dempers

    Unplanned dilution directly adds cost to production from mining, milling, tailings disposal and administration. Additionally, unplanned dilution decreases the productivity, profitability and may affec

    Mar 15, 2021

  • AUSIMM
    Rock Bolts for Permanent Tunnel Lining

    By J de Witte

    When used in suitable ground conditions, rock bolts can have advantages over other permanent tunnel lining solutions. Permanent rock bolts offer flexibility in tunnelling profile and rapid rock bolt i

    Mar 8, 2011

  • AUSIMM
    Closure Cost Estimation - All Things to All Men?

    By H Jones

    Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates

    Nov 20, 2012

  • AUSIMM
    The challenges of the reuse of tailings and overburden

    By E M. Gama, L Resende

    The tailings are waste from mineral processing operations. The type of tailings of iron ore processing are classified into sandy tailings and mud. Already the overburden are showing significant levels

    Jul 23, 2018

  • AUSIMM
    Moisture/particle interactions under oscillatory motion – model development

    By K Williams, A Lavrinec, V Gurung, D Ilic

    The moisture content of iron ore during handling can range from the dust extinction moisture at the point of arrival at the port to the transportable moisture limit at the point of loading ships for m

    Sep 18, 2023

  • AUSIMM
    Carrapateena Crows Foot Level Layout – Safety in design to support sub level cave production efficiency and automation

    By A Mooney, J Marsden, H Grosser, G Dunstan

    Carrapateena is a copper-gold deposit hosted in a brecciated granite complex, located 500km North of Adelaide, South Australia. The deposit is being mined using the Sub Level Caving (SLC) Mining metho

    Mar 15, 2021

  • AUSIMM
    Real-time Mining – Moving Towards Continuous Process Management in Mineral Resource Extraction

    By N Jeannee, L Rattmann, M W. N Buxton, A deJong, K Nienhaus, A Soares, P Graham, A Korre, J Benndorf, D Buttgereit

    The flow of information, and consequently the decision-making along the chain of mining from exploration to beneficiation, typically occurs in a discontinuous fashion over long timespans. In addition,

    Nov 4, 2015

  • AUSIMM
    In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit Closure

    By D J. Robinson, L L. Kuhar

    "Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to

    Nov 15, 2016

  • AUSIMM
    Technology change by regulation – a cresting wave?

    By J D. Pease, J M. I Tuppurainen, P D. Munro

    This paper examines how legislation and regulation can be external drivers of technical change in mineral processing and extractive metallurgy and how the industry can respond. Two examples are consid

    Sep 11, 2017

  • AUSIMM
    A day in the life of a mineworker in 2045

    By G McCullough, J Bassan, d P. Knights, C T. Farrelly

    By 2045, carbon-neutral mines will be economically producing products that are vital for the world’s transition to renewable energy. After overcoming significant technical challenges (and the investme

    Sep 1, 2024

  • AUSIMM
    "Optimisation of Mining Policy Under Different Economical Conditions Using a Combination of Non-Linear Programming and Genetic Algorithm"

    By A Esfahanipour, M Osanloo

    Determination of cut-off grade?strategy is one of the most important stages of open pit mine planning and design. It is the parameter directly influencing the financial, technical, economic, legal, en

    Sep 26, 2011

  • AUSIMM
    The Gameta Gold Deposit Fergusson Island, Papua New Guinea

    By Ibil S

    The Gameta Gold Deposit is located on the north-eastern corner of Fergusson Island in the D'Entrecasteaux Islands of Milne Bay Province, PNG, at lat. 9¦ 25' 5, long. 150¦ 47' E or AMG

    Jan 1, 1997

  • AUSIMM
    The ABC of Mine to Mill and Metal Price Cycles

    By J Pease, P Cameron, D Drinkwater

    "In the 1990s metal prices were trending in a long-term decline and the usual cost-cutting exercises were adopted. Cuts to research and development made innovation difficult and the outlook was grim.

    Oct 10, 2016

  • AUSIMM
    Water Conservation at Construction Projects

    By B Hannah, M Uriarte, F Labarca, C Madore, G Ganapathi, L Martin, T Haase

    BechtelÆs Mining and Metals projects across the globe are executed in remote arid and semi-arid countries where providing even basic water supplies impose considerable challenges. Opportunities for wa

    Nov 26, 2013

  • AUSIMM
    Improving the Flexibility of the Mount Gordon Ferric Leaching Process

    By G Richmond, J R. Glen

    Western Metals Mt Gordon Operation is a copper mine and processing plant situated 120 kilometres north of Mt Isa. The unique Mt Gordon copper process utilises a whole of ore acid/ferric pressure leach

    Jan 1, 2003