Pre-concentration via waste rejection based on fragment size – Olympic Dam case studyBy K Ehrig, V Liebezeit, Y Li, B Pewkliang, M Smith, E Macmillan
Pre-concentration of low grade ores via the rejection of low/no value materials based on fragment size is the subject of many published papers and studies over the past decade. However, the possibilit
Nov 10, 2020
-
A New Approach to Flexible Open Pit Optimisation and SchedulingBy A Galli
Traditionally pit optimisation and scheduling is carried out assuming that the resources, the commodity prices and production costs are all known. Once the pit contour and the mining schedule have bee
Sep 26, 2011
-
Diversion decision making with an integrated approach to design for operations and mine closureBy M Rafty, A Markham, S Atkinson
Australia contains some of the most productive mining areas and is characterised by ancient landscapes and highly variable hydrology. Historical mining of iron ore, coal and other minerals has targete
Jul 25, 2018
-
Pit Backfilling - Managing Chemically Reactive Mine Wastes and Achieving Rehabilitation ObjectivesBy A A. Puhalovich
The placement of chemically reactive mine wastes in mined out pits (æpit backfillingÆ) is increasingly seen by industry as best practice to manage long-term environmental risks. This is primarily beca
Jul 10, 2012
-
Block Cave EvaluationBy R J. Butcher
Many deposits have been evaluated as potential block caves over the last 20 years due to the perceived benefit of low operating costs. However, block cave projects are typically capital intensive, wit
May 9, 2016
-
Four-Dimensional Network Relaxation Method for Long-Term Open Pit Mine SchedulingBy J Yamatomi, Y Tamanishi, S Miwa
The four-dimensional (4D) network relaxation method, originally developed by Akaike in 1999, uses Lagrange relaxation and is known for its ability to include the price change and possible better outpu
Sep 26, 2011
-
The Design, Installation and Commissioning of an Absorption Refrigeration System at Gwalia Gold Mine in Western AustraliaBy J deVries, A Broodryk, P Kyselica, K McLean
Gwalia gold mine is located close to the town of Leonora in the Goldfields region of Western Australia, some 830 km from Perth. The mine is wholly owned by St Barbara Ltd, an Australian Securities Exc
Aug 31, 2015
-
A Geometallurgical Approach at Anglo American PlatinumÆs Mogalakwena OperationBy T Muzondo, C Prins, D De Vaux, R Schouwstra
The Mogalakwena Platinum Mine in the northern limb of the Bushveld Complex is Anglo American PlatinumÆs only open cast operation exploiting the Platreef. The Platreef, which extends along the basal co
Sep 29, 2013
-
Resource and Reserve category inflation – known rewards, hidden risksBy M Bond, R R. Hargreaves, G W. Booth
There are numerous causes of speculative mineral resource and reserve inflation. Traditionally, these are linked to issues of data accuracy or misinterpretation, the use of overly optimistic estimatio
May 24, 2023
-
Reversing the Trend in Open Pit Mining Equipment OutputBy T Trott, M Lewis, G Lumley
The analysis of equipment trends in The AusIMMÆs revision of Monograph 19 - Australasian Mining and Metallurgical Operating Practices (AMMOP) (in prep) in the paper by Graham Lumley raised some intere
Sep 18, 2012
-
Case Study – Engineering Design for a Slurry Preparation Plant for a Paste Application in West AfricaBy G du Toit, P L. Gillot, M Swanepoel
Randgold Resources’ Loulo-Gounkoto Complex is one of the largest gold mining operations in Mali, West Africa. The mine, which is situated on the western border with Senegal, treats more than 4 Mt/a of
Sep 1, 2014
-
Integrated Landforms for the Storage of Tailings and Waste Rock at Magnetite Mines in Western AustraliaBy D R. Anstey
The mining of magnetite iron ore in Western Australia will generate large volumes of waste rock and tailings over many decades. The need to dispose of these materials will result in massive waste land
Jan 1, 2009
-
HRC™ HPGR as an energy efficient alternative to horizontal mills in the iron ore processing circuitBy E Nunes, R Mendes, D Jacobson, G Cota, T Machado, E Santos, J Almeida, E Pereira9, B Raso
Grinding circuits are known to be the highest consumer of energy used in the ore comminution process, with high operational costs and sensitivity to ore conditions. The mining industry is being encour
Sep 18, 2023
-
Modelling Geometallurgical Variability - A Case Study in Managing RiskBy S Khosrowshahi, A Weeks, W J. Shaw
"To provide an indication of expected performance of the mine and mill, feasibility studies should include an assessment of the expected day-to-day variability in process plant feed. Attempts to do th
Sep 29, 2013
-
Precharging in previously preconditioned groundBy E Hawkins, S Sheldon
Block caving is becoming a more widely adopted mining method allowing for underground massive low grade orebodies to be extracted economically. Underbreak during cave propagation is difficult to predi
Mar 15, 2021
-
Three-dimensional Mapping of Magnetite and Hematite Concentrations from Reprocessing of Detailed Aeromagnetic DataBy C A. Foss, D A. Clark, D Hillan
While magnetic surveys are the most common geophysical method used in mineral exploration, magnetics and geology remain to be fully integrated quantitatively in iron ore provinces. Although high-resol
Jul 13, 2015
-
Replacement of Pulverised Coal Injection (PCI) with hydrogen and its impact on blast furnace internal conditionsBy S Mitra, D O’Dea, N Barrett, T Honeyands, P Zulli
The steel industry continues to explore and demonstrate technologies that decrease its greenhouse gas emissions, especially in blast furnace ironmaking where alternate operating conditions will be req
Nov 8, 2021
-
Correlated Valuation MethodologyBy E C. Holloway
"The financial valuation of mining assets has a number of fundamental differences to the valuation of many other asset groupings. One such difference is that typically, the greater proportion of both
Mar 8, 2016
-
A New Tool for Optimisation of Mine Waste Management in Potential Acid Forming ConditionsBy Y Li, Z Fu, D J. Williams, E Topal
Mine waste rock is unavoidable in the recovery of ore by open pit mining methods. Effective management of waste rock movement covers the removal and placement of the waste rock, generally in a surface
Jul 27, 2015
-
Tailings process optimisation through automation and controls integrationBy R Williams, M Baxter, D Zink, R Cunningham
The purpose of this paper is to discuss the efficient operation of a tailings dewatering circuit comprising a thickener and filter press through proper control and automation. It is common to see thi
Jul 23, 2018