Work-Life Balance and Atypical Working Hours: Does FIFO Pass the Epicurean Test for Happiness?When I was first asked to give a paper on work-life balance in the mining industry I was both excited and aware of the incongruity of my position. I have never worked in mining operations nor have I h
Jan 1, 2005
-
Application of Risk-Cost-Benefit Analysis to Highway Subsidence Due to MiningBy J Joy, A Bye, G V. Kizil
This paper demonstrates an application of a recently developed Risk-Cost-Benefit (RCB) Framework to environmental risk management in the mining industry. The environmental application of the RCB Frame
Jul 10, 2012
-
A Dynamic Evaluation of Water Supply Security Susceptible to Climate SeasonalityBy G Fergus, M Hart, S W. Weeks
Rio Tinto Alcan has undertaken feasibility level assessments into the expansion of its bauxite mining operation in an area south of the Embley River in far north Queensland. The project has the potent
Nov 26, 2013
-
Lighting up the dark – the use of 3D seismic to optimise mine plans at structurally complex Blackwater mineBy N Pranoto, E Lawell, T Dean, M Grant
The Goonyella Riverside Mine is located 30 km north of Moranbah in Central Queensland, Australia. Recent mining activities have exposed the north–south striking Kenya and Zimbabwe thrust Faults. These
Mar 22, 2022
-
Re-Invigorating Unloved ProjectsBy D Price
Mining at the Tuckabianna Mining Centre in the Murchison district of Western Australia ceased in 1997, after the production of 550 000 ounces of gold at an average grade of 2.5 g/t from 22 separate op
Aug 22, 2011
-
Keynote Address The Human Element in Apcom's DevelopmentIt is indeed a privilege and honour to deliver the keynote address at this 15th APCOM symposium. APCOM has played a significant role in my own career and I am sure in the careers of many of the th
Jan 1, 1977
-
The Kwademen Gold Deposit: A Polymorphic Mineralization within a Precambrian (Birrimian) Greenstone Belt in Burkina Daso, West Africa: A Case HistoryThe Kwademen Au deposit was discovered in 1977- 1978 following a regional geochemical survey carried out as part of a UNDP (United Nations Development Programme) and BUMIGEB (Bureau des Mines et de
Jan 1, 1988
-
A Fortunate Life – 45 Years in Heavy MineralsBy A R. Sale
This paper highlights two aspects of the mineral sands industry in Australia: the development of the industry from approximately 1870 through to 1980, and the author’s experience in the industry from
Oct 5, 2011
-
Predicting Mill Ore Feed Variability Using Integrated Geotechnical/Geometallurgical ModelsBy M Astorga, J Jackson, J Gaunt
The Ban Houayxai mine (BHX) is a relatively low-grade, low-cost, open pit gold-silver deposit in Laos operated by Phu Bia Mining, a subsidiary of PanAust. The ore production rate at BHX is 4.5 Mt/a, w
Nov 24, 2014
-
Design considerations for an iron tailings filtration plant and their conveying and disposal systemsBy C Garrido, J Barrera, H Alvarez, L Perez, S Ramirez
In recent years, there has had a greater recurrence of studies and projects that consider tailings filtration followed by dry stacking to reduce the consumption of fresh water, the space required for
Nov 8, 2021
-
Application of Design by Measurement for Support and Pillar Design in Mechanised Room and Pillar Coal Mining in IndiaBy I D. Gregson, A Gandhe, A S. Garcia, K M. MacAndrew
"Falls of ground still cause around one-third of all underground mining fatalities. The recent introduction of mechanised room and pillar working into Indian coalmines is an example of the application
Nov 5, 2014
-
Application of Geographical Information System to Mineral Exploration - a 'Weights of Evidence' approach using Misima Island, Papua New Guinea as a Case StudyBy Bure R
Approximately 2.4 million ounces of gold and 11.3 million ounces of silver have been produced from the Umuna Lode by Misima Mines Pty Limited between June 1989 and the end of Decemeber 1996. Reserv
Jan 1, 1997
-
Design Selection for Large-Scale Grinding Operations ù AG/SAG or HPGR?By J Hudson
Autogenous (AG) and Semi Autogenous (SAG) grinding mills are the conventional selection for large-scale grinding circuits. It is accepted that these forms of comminution are not the most energy effici
Jan 1, 2006
-
Common Sense and Good Communication in Mineral Resource and Ore Reserve EstimationBy J Vann
Mineral Resource and Ore Reserve estimation is a challenging and demanding field, requiring application of professional knowledge, skill and experience of the highest order. If the many potential pitf
Jan 1, 1999
-
Ferroalloy extraction from a Zimbabwean chrome ore using a closed DC furnaceBy S Bright, M J. Masamvu, E K. Chiwandika, S Dandi, S M. Masuka
The depletion of high-grade hard and lumpy chrome ores has forced Zimbabwean ferrochrome producers to resort to low-grade friable ores that have an average of 28 per cent fines against a set limit of
Jun 19, 2024
-
An Overview of Geotechnical Issues in Narrow Vein MiningBy M P. Sandy, J B. Albrecht
"Narrow vein mining can be loosely defined as mining operations involving orebodies with a true thickness of less than 4 m. Some authors have limited the term to steeper-dipping orebodies where the or
Mar 26, 2012
-
Laboratory Studies in Comminution: Part V Simulation of an Industrial Rod MIll ProductIt is possible to closely simulate the product sizing distribution from an industrial rod mill by the correct choice of parameters in laboratory batch milling. For laboratory batch rod milling, change
Jan 1, 1998
-
Stable Isotopes and Ore Fluid Chemistry of Gold Mineralisation at Waitangi Deposit, Thames District, Coromandel Peninsula, North Island, New ZealandBy C G. Ryan, D R. Cooke
The Thames gold-silver deposits are part of the Hauraki goldfield, situated within the Miocene to Pliocene calc-alkaline Coromandel Volcanic Zone (CVZ). The Waitangi vein system is one of the minerali
Jan 1, 1999
-
Is a 2.5áper cent Success Rate Good Enough? Traditional Mine Development Methods have the Tail Wagging the DogBy J Jackson, D C. Curry, A C. Keith
Australian Bureau of Statistics (ABS) data shows that since 2006 the balance of capital costs associated with mine development has become weighted greater than 75 per cent to enabling infrastructure a
Sep 29, 2013
-
Applying Modern Heuristics to Maximising Net Present Value through Cut-off Grade OptimisationBy C A. Myburgh, S Craig, K Deb
In focusing on open pit mine scheduling, one of the biggest areas that a mining engineer can add value is in the area of cut-off grade optimisation. It is not atypical to add up to an extra 20 per cen
Nov 24, 2014