Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Professional Engineering Competency Standards in the Queensland Mining Industry

    A key issue in maintaining the mining industryÆs social contract to access community-owned resources, is the need to be able to demonstrate professional management of resource extraction and the risk

    Jan 1, 2009

  • AUSIMM
    Process Implications of Ferrolysis in Hyper-Saline Water

    By J Bean

    Iluka Resources Ltd developed the Jacinth-Ambrosia Mine (Jacinth) in the Eucla Basin during 2009 and 2010. In this arid climate the operation relies on hyper-saline groundwater from a palaeochannel fo

    Oct 5, 2011

  • AUSIMM
    Integrated Sustainable Water Management in Mining for Development in the Philippines

    By A N. Danoucaras, S E. Goater, D Hearne, A M. Bansuan

    It is globally recognised that existing and emerging mining activities should be conducted in a æsustainableÆ manner for the entire life of mine. Many companies annually publish corporate sustainabili

    Nov 20, 2012

  • AUSIMM
    Development of a Segmental Lining Specification for Steel Fibre Reinforced Concrete Flexural Strength Testing Using Round Panel Tests

    By S Kost, R Nievergelt, F Cortes

    In recent years, the use of steel fibre-reinforced concrete (SFRC) for segmental tunnel linings has become increasingly popular due to numerous advantages including durability, resistance to spalling,

    Sep 17, 2014

  • AUSIMM
    Conversion of hard-to-use wastes to new raw materials for low-energy glass/mineral-wool manufacturing

    By Z Li, Z Yan, T Htet, S Zhang

    During the pyrometallurgical processes, a substantial quantity of high-temperature ironmaking and steelmaking slags, generated at temperatures ranging from 1400 to 1600°C, is wasted, as the heat conta

    Aug 21, 2024

  • AUSIMM
    Defining Sustainability Criteria in Project Design - A Case Study of the Olympic Dam Expansion

    By H Bateman, I Cawrse, G Carnes, S Cawrse

    In developing mineral resources, the focus typically centres on the management of identified social and environmental impacts and compliance with regulatory requirements. However, opportunities to pro

    Jan 1, 2009

  • AUSIMM
    What is Expected of Explorers

    Miners and explorers in New Zealand are expected to consult with stakeholders, keep out of core conservation areas, and operate a high standard of environmental management and rehabilitation. These re

    Jan 1, 1997

  • AUSIMM
    Conditions and Design Considerations for Maximising Recoverable Gold in Roasting of Refractory Gold Ores

    By M G. Aylmore, L W. de Klerk

    Roasting of refractory gold ores has been a commercial process for many years. Improvements in design of fluidised bed roasting technologies and low capital and operating costs compared with other ref

    Sep 26, 2013

  • AUSIMM
    The Geology of Kalgoorlie

    CHAPTER 1 - GENERALIn the introduction to this chapter a general account is given of the growth of the mining industry in Western Australia from J88G, when the output of gold for the whole State was o

    Jan 1, 1912

  • AUSIMM
    The Evolution of Block Caving Technology

    By A J. Weston

    Block or panel caving technology is far removed from that of the top slicing and block caving of the late nineteenth or early twentieth centuries. The rapid mechanisation and expansion of these method

    May 9, 2016

  • AUSIMM
    Operational readiness – what is it and how to get it done?

    By A G. L Pratt

    Operational readiness is a commonly used term in mining and many other industry settings. However, translating this term into a coherent scope of work that is practical and meaningful is a challenge f

    Mar 29, 2023

  • AUSIMM
    Increased Productivity through Short-Term Scheduling and Management Operating Systems at the Hilton Mine

    By A Clark

    When production targets are not being reached it is essential to determine what the operating problems are so that remedial action can be taken. It is also imperative that all persons who are part of

    Jan 1, 1998

  • AUSIMM
    Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland

    Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland

    Sep 13, 2010

  • AUSIMM
    Environmental Assessment of Iron Ore Agglomeration Processes

    By K R. Vining, T E. Norgate

    A study was carried out to compare the environmental impacts of the two major iron ore agglomeration processes, sintering and pelletising, using life cycle assessment (LCA) methodology. The following

    Jan 1, 2006

  • AUSIMM
    Reducing the environmental and economic cost of metal extraction by optimal blast design

    By A Tsang, D La Rosa, L Julian, W Hunt, R Pratama

    Mineral extraction is facing the twin challenges of finite resources and increasing environmental and economic costs. Society’s growth is matched by an increase in demand for the earth’s resources. It

    Sep 1, 2024

  • AUSIMM
    JORC and Mineral Resource Classification Systems

    The JORC Code contains a mandatory classification system for Mineral Resource and Ore Reserve estimates for public reporting. The classification is a statement of the Competent PersonÆs confidence in

    Sep 26, 2011

  • AUSIMM
    Technical Note - A Test and Comment on Taylor's Rule of Mine Life

    By Schaap W

    A test on Taylor's rule of mine life using published data on open pit porphyry copper mines confirmed that mine life is, on average proportional to the fourth root of reserve tonnage. Deviations

    Jan 1, 1984

  • AUSIMM
    Stable Isotope Relationships in Epithermal Gold Deposits, Queensland

    By Wilson AF

    Gold-silver mineralization at Cracow and Ukalunda in Queensland comprise quartz-filled veins, fissures and breccia zones hosted by propylitically altered volcanics and epizonal intrusions which are st

    Jan 1, 1984

  • AUSIMM
    Integration of Mine Planning with Groundwater Modelling to Optimise Mine Closure Plans at the Marillana Creek (Yandi) Mine

    By K Rozlapa, P Waters, H Middlemis

    A major challenge for closure planning at mining operations below the water table is evaporation from final void pit lakes and concentration of salts, which can impact on downstream groundwater (and s

    Jan 1, 2006

  • AUSIMM
    Selecting Optimal Operating Conditions for Knelson Concentrators

    By G K. N Subasinghe

    Metallurgists operating Knelson Concentrators (KC) often rely on manufacturerÆs recommendations for selecting operating parameters, such as fluidising water flow rate and cycle time. Recent studies ha

    Jan 1, 2006