Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Major Hazard Risk Assessment Applied To Pillar Recovery Operations (ad413764-c947-4465-9ec3-62ea91281168)By A. T. Iannacchione
Recent fatal injuries occurring during pillar retreat coal mining call for better identification of the hazards and recognition of risks. Ground control hazards associated with room-and-pillar retrea
Jan 1, 2009
-
A Retrospective Assessment of Longwall Roof Support with a Focus on Challenging Accepted Roof Support Concepts and Design PremisesBy Thomas M. Barczak
The era of the shield-supported longwall face began in the United States a little over 25 years ago. The most fundamental development of the shield in the past 25 years has been an increase in size a
Jan 1, 2006
-
Subsidence Misconceptions And MythsBy Richard E. Gray
Subsidence due to coal mining is poorly understood by non-specialists. This has led to numerous misconceptions and myths based on limited observations and lack of knowledge. The three most common are:
Jan 1, 1996
-
Ultra-Close Multiple-Seam Mining ? Analysis and VerificationBy Daniel W. Su
This paper presents the results of a detailed geotechnical study on the potential multiple seam interaction between the No. 2 Gas (upper) and the Powellton seams, which are separated by an average int
Jan 1, 2012
-
Advancements in the Use of High-Modulus Polymer Mining Grids to Speed Longwall RecoveryBy Thomas A. Bailey
Since the advent of longwall mining, various methods and materials have been used during relocation to control the intrusion of the gob in the shield/panline area. (figure 1) Controlling this gob is c
Jan 1, 2006
-
Roadway Roof Support Design in Critical Areas at Anglo American Metallurgical Coal's Underground OperationsBy Ismet Canbulat
"In order to ensure the stability of roadways, Anglo American Metallurgical Coal (AAMC) has developed a roof support design methodology that integrates analytical, numerical and empirical modelling. T
Jan 1, 2010
-
Development of a Numerical Model for the Approximation of Stress Distribution for a Single Vertical Backfilled StopeBy Christopher Newman, Zach Agioutantis, Gabriel S. Esterhuizen
"As conventional underground deposits are continuing to be depleted, mining operations have been forced to produce at greater depths and in more geologically and geometrically challenging conditions.
Jan 1, 2018
-
Investigations into the Corrosive Environments Contributing to Premature Failure of Australian Coal Mine Rock BoltsBy Elia Elias, Alan Crosky, Paul Hagan, Damon Vandermaat, Serkan Saydam, Peter H. Craig
"The University of New South Wales (UNSW Australia) had been involved in the study of premature failure of rock bolts in Australian coal mines from the initial identification of the problem in 1999 (C
Jan 1, 2015
-
Assessment of Rockburst Hazard by Quantifying the Consequence with Plastic Strain Work and Released Energy in Numerical ModelsBy R. Kaund
"Quantifying the rockburst consequence is of critical importance to reduce the hazards with preventative measures in underground mines and deep tunnels. Contours of energy components within a pillar m
Jan 1, 2018
-
Laboratory and Field Testing of Bolting Systems Subjected to Highly Corrosive EnvironmentsBy Stephen C. Tadolini, John Bolton, Bre-Anne Sainsbury, Tom Meikle
"The capacity of ground support components which have been affected by corrosion is reduced and may ultimately lead to dynamic failure of the component and the strata. In order to maintain an effectiv
Jan 1, 2016
-
Determination of the Optimum Crown Pillar Thickness between Open Pit and Block CavingBy Kourosh Shahriar, Kazem Oraee, Ezzeddin Bakhtavar
"In this paper, a relationship between dependant parameters and the crown pillar thickness is first introduced. This relationship defines geotechnical problems caused by thin pillars and economic cons
Jan 1, 2010
-
Selection of Tunnel Support System by Using Multi Criteria Decision Making ToolsBy Kazem Orace, Navid Hosseini, Mehran Gholinejad
"Selection of the optimum support system for underground openings such as tunnels is a complex process. In this paper a new approach, based on a combination of the Analytical Hierarchy Process (AHP) t
Jan 1, 2010
-
Statistical Characterization Of Coal-Mine Roof Failure: Suggestions And Case StudyBy Alan D. Smith
[A standardized checklist in a questionnaire format, was established to investigate selected factors associated with coal nips roof falls, as derived from an intensive review of the literature. A plot
Jan 1, 1984
-
Analysis of the Design and Performance Characteristics of Pumpable Roof SupportsBy Timothy Batchler
"Pumpable roof supports are currently being used to provide a safe working environment for longwall mining. Because different pumpable supports are visually similar and installed fundamentally in the
Jan 1, 2016
-
Variation of Horizontal Stresses and Strains in Mines in Bedded Deposits in the Eastern and Midwestern United States (18e10a78-83b8-48d9-ab61-d01619f77fb4)By Dennis Dolinar
In general, the direction of the maximum horizontal stress in the eastern United States is fairly well defined. However, the variation of the magnitudes of the horizontal stresses is not very well und
Jan 1, 2003
-
Numerical Modeling of Standing Support Performance in Entries between Longwall GobsBy Benjamin Mirabile
"Current and emerging practices to ventilate longwall gobs are prompting increased design and analysis of standing support requirements related to longwall mining. Specifically, additional design meth
Jan 1, 2015
-
Longwall Roof Fall Prediction and Shield Support RecommendationsBy Ulrich Langosch
In the 1990s the German mining industry introduced a new generation of shield supports. The new design of support has a maximum load capacity of 10,000 kN, making these units as strong as the shields
Jan 1, 2003
-
Challenges of Mining the First Right-Handed Longwall Panel in a New Reserve Block in Pittsburgh SeamBy Jun Lu, Greg Hasenfus
"In this paper, the mining experience and challenges for the first right-handed longwall panel in the Pittsburgh seam are introduced. The longwall headgate T-junction experienced very high face conver
Jan 1, 2018
-
In Situ Stress For Underground Excavation Design In A Naturally Fractured Rock MassBy Andrew J. Hyett
The ISRM commission on testing methods has recently presented Suggested Methods for rock stress determination (Kim & Franklin, 1987). This proposes that even if the magnitude of in situ stress is not
Jan 1, 1989
-
A Procedure for the Rapid Assessment of Coal Mine Roof Stability against Large Roof FallsBy Ted Klemetti, Gabriel Esterhuizen, John L. Ellenberger
"Advanced numerical models can be used to evaluate entry support systems in coal mines. However, these methods require specialized software and specialized skills to create the models and evaluate the
Jan 1, 2015