Design of the Epping to Chatswood Rail Line, Sydney, AustraliaBy Jim Rozek, Robert A. Gee
The Epping to Chatswood Rail Line project is the largest publicly funded infrastructure project in New South Wales. Construction commenced in November2002 with opening scheduled for 2008. The work inc
Jan 1, 2005
-
Establishing Geotechnical Baseline Values for Deep Soft Ground TunnelsBy John E. Newby
The Brightwater Conveyance System consists of four tunnel segments in three tunnel con-tracts, comprising over 21,760 m (71,400 ft) of pressurized face tunneling in complex glacial and non-glacial sof
Jan 1, 2008
-
Large-Diameter Tunneling Collapses: Recovery Design and ExecutionBy Bradford F. Townsend
A study was made on six collapses that occurred during large-diameter tunnelling through weak sedimentary rocks and soil using SES methods in three stages?top heading, bench and invert. The collapsed
Jan 1, 2008
-
Shaft Sinking at the Seymour?Capilano Filtration PlantBy Andreas Prucker
The Greater Vancouver Water District (GVWD) is currently constructing the largest water treatment plant in Canada. As part of this treatment scheme twin water transfer tunnels are being constructed. W
Jan 1, 2008
-
Stillwater?s Blitz TBM Project UpdateStillwater Mining Company (SMC) has an extensive history with tunnel boring machines (TBM) at the Stillwater and East Boulder underground PGM mines in Montana. The most recent TBM used is for the Blit
Feb 23, 2014
-
Improving Grinding Efficiency By Rationed Ball Charging At Amax's Climax Molybdenum MineBy Robert R. Dorfler
AMPS[. has completed a rationed grinding ball test in a 2.93 m x 2.93 m ball mill at Climax Molybdenum Company. The test consisted of purging the ball distribution formed by charging 100%, 76 mm carbo
Jan 1, 1981
-
Micro Seismic Monitoring and Analysis for Rock Burst Prone Tunnels Utilizing TBMsBy G. A. Rosario, G. Peach
Twin 8.5 m diameter, 10 km long headrace tunnels under overburdens of up to 1870 m were excavated for the neelum jhelum hydroelectric project in north-eastern pakistan using two main beam gripper tunn
Dec 1, 2022
-
Characteristics Of Column Flotation Utilizing Aspirated AerationBy Donald E. Zipperian
The studies described in this paper have established that flotation conducted in a column cell provided with gas generation by aspiration into surface tension lowered water, may considerably increase
Jan 1, 1984
-
Carrying Capacity In A Pilot Flotation Column (c455c347-57bd-4dda-bdf0-0cf485eb7e53)By M. T. Ityokumbul
Concentrate flowrates have been measured for the flotation of -100 mesh Lower Kittaning coal in a computer controlled 0.076 m x 3.5 m pilot flotation column. The variables studied were recovery zone h
Jan 1, 1997
-
Use Of Amino Acids For Copper Dissolution - SME Annual Meeting 2022By C. Perea, O. Restrepo, C. Ihle, H. Estay
In this study, research on the use of monosodium glutamate for copper leaching, with emphasis on the thermodynamics and oxidant characteristics, is presented. Copper dissolution was conducted followin
Mar 2, 2022
-
Planning Considerations For Quartz Hill Mine Southeast AlaskaBy K. M. Reim
Planning the development of the Quartz Hill molybdenum open pit mine in Southeast Alaska required a number of special considerations. Located in mountainous glaciated terrain, about 3.8 m (150 in.) of
Jan 1, 1988
-
The Machine Within a Machine: TBM Innovation in Vancouver, British Columbia, Canada - NAT2022By B. Catalano, D. Ifrim
The Annacis Island Outfall Project includes two TBM bored tunnels with face pressures above 3.5 bar, with an internal diameter of 4.2 metres. This paper discusses the innovative approach to TBM tunnel
Dec 1, 2022
-
The Effect Of Mining Method On Coal Surface Mine Spoil StrengthBy D. R. Lanners
Samples of the same coal measure overburden spoil were obtained from three different mine sites. Site A used a 27-m3 tub-mounted dragline, Site S used a front-end loader and truck combination, and Sit
Jan 1, 1993
-
Grade Control And Ore Selection Practices At The Colosseum Gold Mine (726eb0cc-482f-447f-b766-e17d077ed6f0)By B. M. Davis
The Colosseum Mine is within the Clark Mountain mining district located approximately 72 km (42 miles) southwest of Las Vegas. Nevada in San Bernardino County, California. Gold mineralization at the C
Jan 1, 1989
-
Ventilation Of An Underground Testing Facility In Salt (5ff6f90b-f560-41cb-9026-760af7f90788)By W. S. Sadik
This paper presents the ventilation design for an underground testing facility in a salt medium. The underground workings consist of two-12 ft. (3.66 m) diameter watertight shafts and approximately 60
Jan 1, 1988
-
Design and Construction of a Vehicular Underpass Under a Live HighwayBy Nai-piu Tong, Huaren Dou, Sui-shun Poon, Leslie H. Swann
This paper mainly presents geotechnical aspects of a vehicular underpass that was built across under one of the busiest highway in Hong Kong. The underpass, in a section comprising an upper arch and i
Jan 1, 2003
-
Meraaker Hydro-Tunneling the “Norwegian Way”By Odd G. Askilsrud, Steinar Johannessen
New powerplants, tunnels and dams are currently under construction at Meraaker to triple the annual power production of a nearly 100 year old power scheme. A total of 44 km tunnels with cross sections
Jan 1, 1993
-
Tunnel Boring Machines in Hong KongBy Ian McFeat-Smith, Odd G. Askilsrud
Introduction Given the mountainous nature of the local igneous terrain, hard rock tunnelling plays an important role in the development of Hong Kong's infrastructure. In 1990, tenderers for
Jan 1, 1993
-
Lysimeters allow quicker monitoring of heap leaching and tailing sitesBy William R. Bond, Jim V. Rouse
Introduction The pressure/vacuum (p/v) lysimeter or soil water sampler has become useful for monitoring vadose zone or unsaturated zone water conditions. The soil water sampler was first introduced a
Jan 4, 1985
-
Arsenic Leaching From A Mine Tailing By Acidithiobacillus Ferrooxidans: Role Of Temperature, Ph, And Pulp DensityArsenic (As) removal behavior from Changgoon mine tailings was investigated using Acidithiobacillus ferrooxidans (A. ferrooxidans) in well-controlled batch reactors by varying pulp density (0.5?4%, pH
Feb 27, 2013