Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Airblast Problem in the Orepasses of the Grasberg Mine, PT Freeport IndonesiaBy Nigel Pearson, Malcolm J. McPherson
In the Grasberg Mine, a series of orepasses of diameter 2 to 4m are being constructed, each one to carry as much as 10,000 tlhour of copper- and gold-bearing ore through single stage vertical drops of
Jan 1, 1997
-
The Influence of GOB Gas Venthole Location on Methane Drainage: A Case Study In The Lower Kittannig Coalbed, PaBy William P. Diamond
Production trends have been analyzed for 82 gob gas ventholes on 7 longwall panels in the Lower Kittanning Coalbed, Pennsylvania. Cumulative production from individual holes was found to vary consider
Jan 1, 1995
-
Airflow In Ventilation And Hoisting ShaftsBy Keith G. Wallace, Gary K. Rogers
As a supplement to an analysis involving methodologies for the estimation of airflow resistance in shafts used for both ventilation and hoisting, a detailed shaft characterization survey was distribut
Jan 1, 1987
-
Roof Control Technologies of Lower Layer Mining in Close Distance Coal SeamsBy Weixiang Meng, Zhao Song, Ming Guo, Zhigao Liu, Shoubao Zhang
"There are many multi-layer coal reserves in China which account for nearly 20 to 25% of the existing proven reserves. When the coals are mined in a descending order using the fully mechanized long wa
Jan 1, 2019
-
Geophysics And Its Role In The Discovery Of The Candelaria Copper-Gold Deposit In ChileBy Jr. Matthews
The Candelaria copper-gold deposit is located in Region m of Chile, 805 kilometers north of the capital, Santiago. Candelaria was discovered in 1987, following a six month exploration program. In late
Jan 1, 1996
-
Chicago TARP McCook Main Tunnel - World’s Largest Live Tunnel Connection is Underway at Chicago’s Tunnel and Reservoir Plan (TARP)By Faruk Oksuz, Dave Schiemann, Matt Trotter, Mike Padilla, Miguel Sanchez, Carmen Scalise
"Chicago’s Tunnel and Reservoir Plan (TARP) is a nearly $4.0 billion and over 30 years long program and arguably the largest and longest combined sewer tunnel and reservoir system in the world. Recent
Jan 1, 2016
-
CSM-USBM Rotary Cutting Machine: Research Capabilities And Trials For Improving The Performance Of Tunnel, Shaft And Raise Boring MachinesBy Levent Ozdemir, Robert J. Evans, Russell J. Miller, William Sharp
This paper describes the specifications and capabilities of a 6 ft (1.83 m) diameter laboratory rotary cutting machine which was designed and fabricated under a Bureau of Mines (USBM) contract awarded
Jan 1, 1983
-
Remote Sensing Study Of The Mid-Continent Geophysical Anomaly In Iowa ? IntroductionBy J. Herman
The Mid-Continent Geophysical Anomaly (M.G.A.) which extends from Michigan into Wisconsin, Minnesota, Iowa, Nebraska, and Kansas, has recently been the object of intense preliminary oil and gas explor
Jan 1, 1986
-
Ground Freezing Deep Shaft Excavation Shaft 17B-1 New York City Water Tunnel No. 3 New York, New York - RETC2023By Andrew Chegwidden, Tara Wilk
Construction of Shaft 17B-1, a part of The New York City water supply system, required an excavation of approximately 38 m (123 ft) through water-bearing overburden soil and more than 152 m (500 ft) o
Jun 13, 2023
-
Significance Of Measured And Modeled Unsaturated Flow Results In Heap Leach Materials Using Large Diameter Column Tests ? Preprint 09-091By V. Galla
In the present paper, two large diameter columns 2 m tall and 1.3 m diameter filled with crushed (finer) and run off mine (coarser) heap leach materials respectively were used to perform unsaturated f
Jan 1, 2009
-
South Mountain Water Facilities–Reach 3BBy Mark R. Rybak, James Delmonte, Travis Hartman
The City of Phoenix, Arizona designed a 7.2 km (4.5 mi) long water transmission main from the South Mountain Reservoir to the Ahwatukee Foothills Reservoir to address the growing demand for drinking w
Jan 1, 2003
-
Implemented Hazard Mitigation Strategy for DMLZ-DOZ Cave Interaction - RASIM2022By Hendri Silaen, Charles Leatemia, Monang Napitupulu, John Kamarea, Arwin Edijanto, Riza Hasan, Avesiena Primadiansyah
The Deep Mill Level Zone (DMLZ) is the fourth panel cave mine in the East Ertsberg Skarn System, (EESS) which lies 500 m below the producing Deep Ore Zone (DOZ) mine and up to 1,700 m below the surfac
Apr 26, 2022
-
Geotechnical Exploration For The Proposed Crosstown Transport Facility San Francisco, CaliforniaBy Timothy N. Dunne, Joseph M. Gonzalez
This paper presents the case history of a comprehensive geotechnical investigation for the Crosstown Transport Facility, a 10,880 m long, 3.2 m diameter pressure tunnel proposed for construction in Sa
Jan 1, 1983
-
Mini Symposium - Rock Mechanics - Effects Of Moisture On Ground Control In Mining And Tunneling - Design And Construction Of Tunnels In Swelling Rock ? 1. IntroductionBy Herbert H. Einstein
Swelling ground is one of the most feared problem in tunneling. Although usually not causing sudden failures during construction, the very large and long- lasting deformations give contractors and des
Jan 1, 1981
-
Development of a roof bolter canopy air curtain for respirable dust controlDevelopment of a roof bolter canopy air curtain for respirable dust controlBy W. R. Reed, G. J. Joy, B. Kendall, A. Bailey
"Testing of the roof bolter canopy air curtain (CAC) designed by the U.S. National Institute for Occupational Safety and Health (NIOSH) has gone through many iterations, demonstrating successful dust
Jan 1, 2017
-
Flotation Machine DynamicsBy N. Arbiter
During the first four decades of flotation practice, close to 200 machine designs were patented, although only about a score were ever used commercially. By the end of that period, the rigors of use h
Jan 1, 1989
-
Ventilation Modeling of a Low-Seam Coal Mine to Optimize VentilationBy B. A. Ashley
Rosebud Mining Co. (RMC) is based in Kittanning, PA. As of October 2013, it operated 24 active underground mines in Pennsylvania and Ohio. RMC?s Tracy Lynne Mine is located approximately 5 km (3 mile
-
Extraction Of Manganese From Low-Grade Nishikhal Ore Using Pyritiferous Lignite In Acidic MediumBy P. K. Naik, S. C. Das
Leaching studies of low-grade manganese ore containing 31.77% Mn and 23.71 % Fe from Nishikhal, India, were carried out using pyritiferous lignite as a reductant in sulfuric acid medium. The variables
Jan 1, 2003
-
Present Status And Future Plan For Slurry Face Machine Tunneling - Experiences Until Now And Future Development -By Yoshihiro Kawarabata
INTRODUCTION The shield-driven method in Japan has been adopted widely in soft ground tunneling, namely, subway, water supply, sewer and utility tunnels, and recently this is an indispensable metho
Jan 1, 1979
-
World?s Largest TBM Keeps Niagara Project On TrackBy Doug Harding
The Niagara Tunnel Project (NTP) is a 10.4-km- (6.5- mile-) long, 14.4-m (47.5-ft) bored tunnel that will run under the city of Niagara Falls from the Upper Niagara River to the Sir Adam Beck power st
Jan 1, 2008