Micro Tunneling 1.2-Mile, 72-In RCP With Crossings Of NJ Turnpike And CSX RailroadsBy Zhenqi Cai
The ongoing Overpeck Valley Parallel Sewer Project of Bergen County Utilities Authority (BCUA), New Jersey, is a US $65 million CSO improvement program to meet a State DEP consent order by 2010. One m
-
Testing of Ground Truth Instruments for Use in Evaluating Haul Truck Collision Warning and Avoidance Systems - SME Annual Meeting 2024By C. R. DeGennaro, Yongjun Zhang, J. Bickson, J. L. Carr, Chenming Zhou, J. R. Srednicki, B. Lambie, M. Girman, J. A. Galanko
Between 2005 and 2021, surface mining haul trucks were involved in 54 fatal incidents in the United States [1]. Collision warning and avoidance systems (CXS) can help haul truck operators navigate the
Feb 1, 2024
-
Undercut-and-Fill Mining at Falconbridge Mine of Falconbridge Nickel Mines Md.By S. A. Tims
INTRODUCTION The Falconbridge mine ore body extends about 1.6 km (1 mile) in length and the deepest developed ore is on the 6050 level below surface. The ore zone varies in width from a few inches to
Jan 1, 1982
-
Manganese And Copper Removal From Leachates Using Slag And Red Mud Reactive BarriersBy I. Fafoutis
Laboratory column studies were conducted in order to assess the effectiveness of slag and red mud reactive barriers for cleaning up leachates generated at mining and waste disposal sites and loaded wi
Jan 1, 2006
-
St. Louis Skinker–McCausland TunnelBy Jozef F. Zurawski
River Des Peres Foul water Interceptor (Skinker–McCausland Tunnel) is a gravity sewer tunnel constructed to eliminate dry sewage overflows during high river stages and to improve the wastewater collec
Jan 1, 2001
-
Interpretive Geotechnical Investigation For Onion Creek Wastewater Interceptor Tunnels - Austin, TexasBy Robert M. Valentine, Randall L. Lentell
Interpretive geotechnical investigations were performed for the construction of approximately 15,250 m (50,000 ft) of wastewater interceptor tunnels in Austin, Texas. Subsurface materials consist of c
Jan 1, 1985
-
Role and Performance of Chemical Grout in the Underpinning of an Active Subway StationBy Daniel J. Dobbels, Eric R. Drooff, James R. Wheeler
Construction of Boston’s C11A1 Section of the Central Artery (I-93)/Tunnel(I-90) Project beneath the existing MBTA Red Line Subway at South Station required excavation to depths in excess of 33.5 m (1
Jan 1, 1999
-
Geology And Evaluation Of The Asbestos Hill OrebodyBy R. V. Stewart
This chrysotile asbestos orebody is located near the northern tip of the Province of Quebec, Canada. It is some 1818 km (1130 mi) north of Montreal; 480 km (300 mi) north of the tree line and is situa
Jan 1, 1978
-
High Intensity Autogenous Impact BreakingBy Bryan A. Bartley
About 1,000 machines around the world are breaking rock and hard abrasive materials by a very economic, high intensity, autogenous process, but this method is largely ignored by the mining industry.
Jan 1, 1992
-
Second Manapouri Tailrace Tunnel Design and Construction ConsiderationsBy Brian Heer, David Young, Randall Essex
The Manapouri Power Station is New Zealand’s largest hydroelectric facility located on the South Island of New Zealand. Constructed in the 1960’s, it includes a 700 MW under-ground power station and
Jan 1, 1997
-
Continuous Pilot Scale Testing Of Column Flotation For Recovery Of Fine Coal (Preprint 90-153)By J. G. Groppo
A series of performance studies have been conducted using counter-current column flotation to recover a marketable clean coal product from existing preparation plant fine waste streams. The test work
Jan 1, 1990
-
Air quality impact assessment and management of mining activities around an international heritage site in India (MME Technical-Paper Abstracts)By S. K. MONDAL, K. K. K. SINGH, S. Singh, R. K. TIWARY, S. K. Chaulya, G. C. MONDAL, R. S. Singh, T. B. SINGH
In this work, a comprehensive field study was carried out to measure the background air quality status and identify the air pollution sources from opencast mines around a heritage site in India. Air q
-
Applicability of Electrostatic Pseudo-Liquid Membrane Technique to Ni(I1) RecoveryBy Tetsuji Hirato, A. J. Monhemius, Yasuhiro Awakura, G. W. Warren, E. Peters
An electrostatic pseudo-liquid membrane technique, in which extraction and stripping take place simultaneously in a single reaction vessel using an electrostatic dispersion, was applied to recover Ni(
Jan 1, 1993
-
Laboratory evaluation of shield dust entrainment in high-velocity airstreams (f1c7e8d5-6daf-4be6-a7d2-022a85a6cb07)In conjunction with steady increases in production levels, longwall operators have applied greater quantities of ventilating air and spray water in an effort to control respirable dust and/or methane.
Jan 1, 2002
-
Short Term Mine Planning And Grade Control Practice At The Mesquite Mine (b9fe8c31-659a-4850-a163-7cd7260c5540)The Mesquite mine is being operated by Gold Fields Operating Co.-Mesquite, a subsidiary of Gold Fields Mining Corp. The mine Is located in southeastern California about 56 km (35 miles) east of the fa
Jan 1, 1989
-
Construction Of The 1122 / 1130 Tunnels on the Superconducting Super Collider ProjectBy Tom B. Corry
INTRODUCTION Located approximately 48 km (30 miles) south of Dallas, Texas, use to be the site of the Superconducting Super Collider. For those of you unfamiliar with the project, this was a multi-
Jan 1, 1995
-
Modelling Of A Phosphate Deposit By Geostatistical MethodsBy E. Lefeuvre
Precambien in age, the phospate deposit under study which outcrops to the south forms a synclinal consisting of only one mineralized horizon. The synclinal strikes SSW/NNE, dips from 30 to 60 NNE and
Jan 1, 1986
-
The Critical Pillar Concept In Yield Pillar-Based Longwall Gate Road DesignBy J. R. Koehler
Yield pillar-based gate road designs oftentimes fail to provide mine operators with adequate ground control because of the unknowing misemployment of "critically" sized pillars. A "critical" pillar is
Jan 1, 1995
-
Micro- and macro-structural investigations of faulting in deep South African gold mines - RASIM2022By Nomuqhele N. Nkosi, Yasuo Yabe, Musa D. Manzi, Raymond J. Durrheim, Siyanda B. Mngadi
This study examined rock failure in brittle rocks hosting the deep gold-bearing ore bodies on scales between millimeters and kilometres. This research study is part of the International Continental sc
Apr 26, 2022
-
Practical Applications Of Fully-Bonded Rock Bolts To Unstable Underground In Japanese Kuroko Deposit - 1. IntroductionBy Kunzo Amano
Fully-bonded rock bolts have been widely used in construction sites and mines in recent years. The purpose of this investigation is to prove the effectiveness of rock bolt supports in unstable ground
Jan 1, 1982