Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Support Of Excavation System - Columbia Heights Metro Station Project - Washington, D.C. - Summary:By Robert W. Bergwall
The $58,000,000.00 Columbia Heights Metro Station project (Section E3-a) forms a part of the Washington Metropolitan Area Transit Authority's (WMATA) Greenbelt Route - Green Line subway system. T
Jan 1, 1997
-
Augered Cast-In-Place Pile Manual (Model Specification with Commentary)"Guideline Augered Cast-In-Place (ACIP) Pile Specification and Commentary11.0 GENERAL1.1 SCOPEThe Pile Contractor shall furnish all labor, materials, tools and equipment necessary for furnishing, inst
Jan 1, 2016
-
Extensive Pile Testing of Auger Pressure Grouted Displacement (APGD) Piles, Los Angeles, CaliforniaBy Todd W. Armstrong, Michael D. Reader
"INTRODUCTIONThe Playa Vista Development is the largest urban infill development in the history of the United States. Overall, it encompasses about 1100 acres in the City of Los Angeles and is situate
Jan 1, 2005
-
Installation of 10 Feet Diameter CIDHs in Soft Clay Using Rotator/Oscillator on TrestleBy Babak Mamaqani, Pirooz Barar
The Moanalua trestle spanned over Moanalua Stream, Honolulu, HI and was designed to accommodate construction of five 10 feet diameter cast in drilled hole (CIDH) piers as a part of Honolulu Authority
Jan 1, 2019
-
Case Study: Stability Analysis for an Existing Bridge Experiencing Riverbank ErosionBy Brandon Smith, William Bohlen
Riverbank erosion along the Brazos River has modified the structural support conditions for an existing bridge structure in Southeast Texas. The 8-span, 1,200-foot long bridge was completed in 1992 al
Jan 1, 2019
-
Guideline for Interpretation of Nondestructive Integrity Testing of Augered Cast-In-Place and Drilled Displacement Piles"1 INTRODUCTIONThe use of nondestructive testing (NDT) methods to evaluate the integrity of Augered Cast-in-Place (ACIP) and Drilled Displacement (DD) piles has been a subject of significant debate am
Jan 1, 2016
-
Cutter Soil Mixing Solutions at the Leixões Cruise TerminalBy Xavier Pita, Alexandre Pinto, António Cristovão, Rui Tomásio
"The cutter soil mixing technology was been applied in Portugal since the last seven years. The aim of this paper is to present the main design and execution criteria, related with both the cofferdam
Jan 1, 2015
-
Indicator Pile Program at Port of Oakland, CaliforniaBy Partha Sircar
"For Berth 22 modifications at the Port of Oakland, nearly 600 octagonal 24-inch ‘diameter’ precast-prestressed concrete piles were driven, some piles over 160 feet long. Prior to production pile driv
Jan 1, 2015
-
Levee Rehabilitation, Lower Wood River Phase II– East Alton IL. Deep Cutoff WallBy Gene Bryant, Wesley Schmutzler, Matteo Bertoni
The levees where the Mississippi River and the Lower Wood River meet near East Alton Illinois have been a problem area for years due to underseepage. The first phase of the deep cutoff wall was a 2,00
Jan 1, 2019
-
Grouting Methods Involved in Stabilization of TBM Tunnel near CP-06, UAA-04, Chennai MetroBy Yeruva Ramanareddy, Sohail Wajid, Ahmed Shaz, K. Bhavani
"CP-06 is an NATM cross passage which connects up-line and down-line metro tunnels near Kilpauk Medical College, Chennai. It lies completely in loose silty sand to dense sand with water table almost t
Jan 1, 2017
-
A Study in Extreme Event Large Displacement Analysis of Large Diameter PilesBy Bret N. Lingwall, Byron Foster
The problem of reliable extreme event modeling of large diameter piles under enormous structural or kinematic loads has gained more attention in recent years. In particular, the soil response around t
Jan 1, 2018
-
Resonant Driving of Sheet Piles: High Production Sheet Pile Driving With Zero Ground VibrationBy Mathew Janes
"Sheet piles remain an economic solution to many shoring problems. However, installation of sheet piling suffers high noise and vibration with conventional impact or vibratory methods or low productio
Jan 1, 2014
-
Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)By I. D. Dayal, Anil Kumar Jain
"Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat
Jan 1, 2016
-
Application of Large-Scale and Rapid Construction of Lightweight Stabilized Soil with Air Foam for Deep Water Zone to Stabilize Existing Quay WallBy Yoshio Mitarai, Takeshi Nagatome, Yosuke Tanaka
"This paper describes an application of lightweight soil in a deep water area to stabilize an existing quay wall at the Port of Tokyo. Super Geo Material, abbreviated SGM, is a type of lightweight soi
Jan 1, 2015
-
On The Use of Cement Content Determination Tests for Deep Mixing ProjectsBy Emilie Lapointe, Fernando Famania
"A reliable determination of the in-placed cement factor, as defined by mass of cement over volume of final element of treated soil, allows the optimization of cement usage to achieve treated soil req
Jan 1, 2015
-
Vsm And Ofd® Technology: Mechanized Solutions For Deep On- And Offshore FoundationsBy Nils Schneider, Marc Peters, Stefan Frey, Andrea Fluck
Due to the worldwide population growth, the development of sustainable infrastructure and the exploration of renewable energies plays a key role to handle the rising megacity trends and to limit carbo
Nov 1, 2022
-
Metro Rome Line “C” - Artificial Ground Freezing Application for the Underpass of the Existing Metro Station San Giovanni - Line “A”By Giulia M. B., Ferruccio Cribari, Alessandro Bertero, Eliano Romani, Roberto Sorge, Francesca Casini
"The use of Artificial Ground Freezing (AGF) to form earth support and seepage control barrier systems has had applications worldwide. These cover a variety of construction problems, including the for
Jan 1, 2016
-
Ground Improvement for New Jersey Turnpike Interchange 14A: A Case StudyBy Sarah Ramp, Daniel V. Cacciola, Justin Labrozzi, Shafiq I. Siddiqui, Faisal Ahmed
"Construction of embankments up to 34 ft in height for twelve ramps and roadways needed for the New Jersey Turnpike Interchange 14A project required ground improvement. The subsurface conditions, cons
Jan 1, 2017
-
Rock Excavation and Underpinning below a 19-Story BuildingBy Kevin P. Gleckler, Steven C. Highfill
"Escalators to access platforms for the Second Avenue Subway Station at 72nd Street in Manhattan are to be installed in the basement of an existing 19-Story residential building. The escalators, which
Jan 1, 2016
-
Capacity Of Piles And Settlement Of Pile FoundationsBy M. Mets
Pile foundations have been used in Estonia since the beginning of 1960's. To evaluate the capacity of piles nearly 2,500 pile tests and 1,800 pile loading tests Have been carried out. The pile fo
Jan 1, 2000