Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Rehabilitation of an Existing Mechanically Stabilized Earth Wall Using Soil NailsBy Daniel A. Thome, Robert C. Janke
"Installation of permanent soil nails through distressed mechanically stabilized earth retaining walls is a cost effective and aesthetically pleasing solution when using the appropriate equipment and
Jan 1, 2005
-
Design and Construction of Permanent Sheet and Pipe Pile Basement Walls with the Press-in Piling MethodBy Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
Using sheet piles and pipe piles for permanent earth retaining is one of the most economical methods for constructing basement walls since they can also work as temporary shoring during construction.
Jan 1, 2019
-
Piling Adjacent To Rail Tunnels At King’S Cross CentralBy David A. Hart, Barry P. Osborn, Richard J. Totty, Ana T. Carvalho, Max B. Elliott
This paper addresses the experience designing and installing bored piles for the King’s Cross area. This includes continuous flight auger and rotary bored piles, with a range of diameters between 600
May 1, 2022
-
Remedial Work On Large Pile Deviation In The Very Thick Marine Swamp Clay DepositBy Wanchai Teparaksa
Pile deviation generally can happen after installation of driven pile particularly in soft soil layers. In this case study, all 242 diameter 0.8 m spun piles were deviated from 20 to 820 mm. The large
Jan 1, 2002
-
Emergency Stabilization to Maintain CN Rail ServiceBy Rick Deschamps
"Fountain Slide is located approximately 10 mi (16 km) northeast of Lillooet, British Columbia, Canada, within the Coastal Mountain Range, and has been locally active since the 1970s. The project site
Jan 1, 2017
-
Design of a Raft Assisted Piled Foundation for a High Rise Prefabricated Hotel Structure in Perth, Wa.By Lucie Spencer, Craig Butterworth
"This paper presents the design of a raft enhanced pile group recently constructed for a hotel development in Perth, WA. At the time of construction in 2016 the hotel was the tallest prefabricated hot
Jan 1, 1900
-
Monitoring Auger Cast in Place Pile Construction and Testing in Hard Clay (c1a730a8-7e87-4cd7-85b2-336e4f7995da)By Onur Guvener, Kalaiarasi Vembu, C. Vipulanandan
"Installation procedure and the quality of the material used in the construction have significant effects on the behavior of the Auger Cast in Place (ACIP) piles. In this study, Installation and curin
Jan 1, 2017
-
OPA Contender Features Innovative ACIP Pile TestBy Andres M. Baquerizo, Matthew E. Meyer, Carlos Ortiz
"The Metropolitan Miami development, a downtown mixed-use complex developed by Miami-based MDM Development Group, has weathered the economic downturn by adapting to the needs and pressures of the loca
Jan 1, 2012
-
Ground Improvement by Dynamic Replacement within Intertidal Mangrove Mud Environment, Ichthys LNG, DarwinBy J. Racinais, P. Vincent
"In September 2011, Menard Oceania (MO) was engaged by Mac Mahon John Holland Joint Venture (MJHJV) to provide ground improvement solution for the $34bn Ichthys LNG development. With close to 400,000m
Jan 1, 1900
-
Pile Load Test Results Using The New Statnamic MethodBy Matthew Janes
Quality control procedures are increasingly important with today's higher capacity foundations and complex loading conditions. The need for a mobile, repeatable, nondestructive and economical loa
Jan 1, 1990
-
Parametric Study for Narrow Mechanically Stabilized Earth WallsBy Gihan E. Abdelraham, Youssef G. Youssef, Mohamed M. Kamel
"Previous studies defined Narrow Mechanically Stabilized Earth, NMSE, walls as a retaining wall with aspect ratio (wall width to its height, L/H) less than 0.70 as in traditional walls. Some studies i
Jan 1, 2017
-
Cut-and-Cover Excavation ChallengesBy Sitotaw Y. Fantaye
"The first segment of the Second Avenue Subway extension is approaching construction completion. The new extension will operate along Second Avenue from 96th Street to 63rd Street, where it will diver
Jan 1, 2016
-
Three Mass Stabilization Phases in the West Harbor of Helsinki, Finland – Geotechnical and Environmental Properties of Mass Stabilized Dredged Sediments as Construction MaterialBy Leena Korkiala-Tanttu, Noora Lindroos, Juha Forsman
"Construction works at the Helsinki city sea shoreline requires dredging and handling of contaminated sediments. Most of these soft dredged sediments are regarded as too poor quality material for eart
Jan 1, 2015
-
The Keys to Success in WaikikiBy Alison Savage, Michael Terry
"For decades, the International Market Place (IMP) has been an icon in the heart of Waikiki in Honolulu, Hawaii. It was famous for Duke Kahanamoku’s restaurant where people flocked to hear Don Ho sing
Jan 1, 2016
-
Little Britain Project: Construction Of BasementBy R. H. Wright
This paper describes the design philosophy and methods employed in constructing the foundation elements for the Little Britain Project in the City of London. The Contract is a design and construct pac
Jan 1, 1989
-
Strengthening Of A Cardboard Machine Foundation In Kemi, Finland ? SummaryBy J. Hartikainen
Kemi cardboard mill is founded on the alluvial bed of Kemi river at the north-eastern cost of Botnic Culf in Northern Finland. The alluvium consists of sandy and silty layers underlain by thick medium
Jan 1, 2010
-
Soil Improvement Through Rammed Aggregate Piers To Mitigate Liquefaction Risk In Storage TanksBy Francisco A. Flores, José L. Aguirre, Héctor A. de la Fuente, Erika Bernal, Jorge Arroyo-Esquedla
This paper presents the analysis, design, and construction of soil improvement for storage tanks foundation support at a site in Tabasco, Mexico. A total of 980 Rammed Aggregate Piers of 12.5 m in len
Oct 1, 2022
-
Dynamic Load Testing of 2 Metre Steel Tubular Piles Driven into Foliated Phyllite BedrockBy Bosco Poon, Kim Chan, Luis Raúl Castañeda, Geoff McKay
"Driven steel tubular piles of up to 2 m diameter have been used to support abutments and piers of a bridge over Nambucca River and floodplain. The bridge was designed by Arup-Aurecon Design Joint Ven
Jan 1, 1900
-
Anchored Hollow Bar Tangent Pile System For UnderpinningBy Marco D. Boscardin, Benjamin H. MacKinney, Kenneth R. Allard, Kenneth A. Pidgeon, Adriane G. Boscardin
This paper presents a case history for a unique application of a system of vertical micropiles with horizontal soil nail bracing and shotcrete facing for underpinning. The system was used to support a
Oct 1, 2022
-
Assessment Of Impacts And Challenges Of Existing Codes Of The Bi-Directional Static Load Test (Bdslt)By Danielle Nhanqulumanga, Pranith Bhatt, Snehal Patel, Khadeeja Priyan
The Bi-Directional Static Load Test (BDSLT) is a test that determines the capacity of piles when loaded under bi-axial static compression. In recent years the BDSLT has seen an increase in demand due
Sep 1, 2022