Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
- 
                     Hybrid Shoring System for a Deep Temporary Excavation Hybrid Shoring System for a Deep Temporary ExcavationBy Nadir Ansari, Brian W. Wilson, Marina S. W. Li "A hybrid Deep Mixing (DM) shoring system was recently constructed for a high-rise development in downtown Vancouver, British Columbia, Canada for the temporary support of a five-level basement excava Jan 1, 2017 
- 
                     Cockatoo Island Seawall Seepage Barrier Cockatoo Island Seawall Seepage BarrierBy Chris L. Powell, Russell J. Denny "The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165 Jan 1, 2017 
- 
                     Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control ? Introduction Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control ? IntroductionBy Rudolph P. Frizzi Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is Jan 1, 2004 
- 
                     Quality Control Of Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Piles ? Introduction Quality Control Of Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Piles ? IntroductionBy Rudolph P. Frizzi Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is Jan 1, 2003 
- 
                     Quality Control Of Augered Cast-In-Place And Displacement Piles ? Introduction Quality Control Of Augered Cast-In-Place And Displacement Piles ? IntroductionBy Rudolph P. Frizzi Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and augered displacement (AD) piles since the pile is Jan 1, 2002 
- 
                     Design And Field Comparison Of Ground Improvement And Bored Piles For Large Diameter Steel Water Tanks Design And Field Comparison Of Ground Improvement And Bored Piles For Large Diameter Steel Water TanksBy Vijaya Bhushan Rao, Ali Semercioglu, Jason Redgers Large diameter steel water tanks with high storage capacities impart heavy loads deep into the ground, generally requiring deep foundations to adequately support them. The use of ground improvement as Oct 1, 2022 
- 
                     Geotechnical Monitoring Of Deep Shoring Adjacent To Train Infrastructure Geotechnical Monitoring Of Deep Shoring Adjacent To Train InfrastructureBy Jakub Szary Excavation and shoring adjacent to the above-grade Gilmore train station and elevated guideway was undertaken in 2019. A perimeter secant pile cut-off wall was constructed to a depth 37 m (121 ft) bel Sep 1, 2022 
- 
                     Minipiles In Soft Marine Deposits Rescue Sinking Warehouse Minipiles In Soft Marine Deposits Rescue Sinking WarehouseBy Bruno Gemmi A new warehouse built with prefabricated components over an area underlined by soft marine soil deposits started showing differential settlements well before its completion. Its 103 spread footings c Jan 1, 2011 
- 
                     Capitol Complex Phase 1 Expansion Capitol Complex Phase 1 ExpansionBy Eric S. Lindquist, Charles A. Luxford The State of Texas recently adopted a master plan to expand the existing Capitol Complex in Austin. Phase 1 of this expansion will add two new State office buildings and five levels of underground par 
- 
                     After Sandy: Bay Park Sewage Treatment Plant Flood Protection After Sandy: Bay Park Sewage Treatment Plant Flood ProtectionBy David Guy, John Stanbury, Gilbert Tallard "In 2009, storm surge from Hurricane Sandy inundated the Bay Park Sewage Treatment Plant located at El. +4 to +12 (+1.2 to +3.6 m) in East Rockaway, Long Island, NY. With all systems down, raw sewage Jan 1, 2016 
- 
                     Author index Author indexAbouleid,A.F.327 Ajdic, I.451 Albert, L.F. 221,307 Alem, A. 525 Asama, T. 431 Avgherinos, P. J. 373 Baker Jr, C.N. 331 Balossi Restelli, A. 171 Beckwith,G.H.33 Bellini, A. 469 Ber Jan 1, 1994 
- 
                     Discussion On Base Grouted Piles Discussion On Base Grouted PilesBy V. M. Troughton Further pile load testing has been carried out at Canary Wharf to compare the performance of base grouted and ungrouted bored piles founded in the Thanet Sand. The testing regime included three prelim Jan 1, 1991 
- 
                     Execution Example of the Expanded Dry Jet Mixing (EX-DJM) Method (71db6e71-57a4-4d54-81bc-d746d501291d) Execution Example of the Expanded Dry Jet Mixing (EX-DJM) Method (71db6e71-57a4-4d54-81bc-d746d501291d)By Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki "The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX Jan 1, 2015 
- 
                     Execution Example of the Expanded Dry Jet Mixing (EX-DJM) Method Execution Example of the Expanded Dry Jet Mixing (EX-DJM) MethodBy Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki "The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX Jan 1, 2015 
- 
                     Construction of Long Deep Mixing Columns by Low-Height Rig Construction of Long Deep Mixing Columns by Low-Height RigBy Shigenori Horikawa, Nobutaka Tanaka, Toshiro Hara, Kengo Yamamoto "The CDM-LODIC method(Low Displacement and Control method), a modified the CDM(Cement Deep Mixing) method, reduces the ground displacement through the removal of in-situ soil equivalent to the amount Jan 1, 2015 
- 
                     Case Study: Load Transfer Analysis on an Instrumented Augercast Pile Using EDC Strain Gauges and Geokon Rebar Strainmeters Case Study: Load Transfer Analysis on an Instrumented Augercast Pile Using EDC Strain Gauges and Geokon Rebar StrainmetersBy Sastry Putcha, Santosh Mummaneni, Swamy Avasarala, Vamshi Vemula "This paper presents the results from a case study on the comparison of two strain acquisition instrumentation technologies, Geokon rebar strainmeters and Embedded Data Collectors (EDC) for the DC Wat Jan 1, 1900 
- 
                     Behavior of a Piled Raft in Dry Cohesionless Soil Subjected to Lateral Loading Behavior of a Piled Raft in Dry Cohesionless Soil Subjected to Lateral LoadingBy Srijit Bandyopadhyay, Aniruddha Sengupta, G. R. Reddy, Raj Banerjee The objective of the present endeavor is to compare the performance of a pile raft system in foundation sand subjected to lateral loads. To study the behavior of pile raft system in sand a laboratory Jan 1, 2015 
- 
                     Some Experience With Large Diameter Caissons ? Synopsis Some Experience With Large Diameter Caissons ? SynopsisBy I. H. Wong The large diameter caisson foundations and their construction methods for three 50 to 60 storey high buildings in Singapore are described. The caissons are 5 m to 8 m in diameter and 40 m to 100 m dee Jan 1, 2010 
- 
                     Experiences of High Strain Dynamics Pile Testing (HSDPT) in Accordance with EC7 in Sweden Experiences of High Strain Dynamics Pile Testing (HSDPT) in Accordance with EC7 in SwedenBy Ingemar Hermansson, Thomas Bjerendal, Mattias Grävare, Carl-John Grävare "AbstractHigh strain dynamic pile tests (HSDPT) on driven piles have been carried out on a routine basis in Sweden for more than 30 years. The Swedish Commission on Pile research established, in the e Jan 1, 2014 
- 
                     Level Crossing Removal Project – Package 1 Level Crossing Removal Project – Package 1By Andrew Middleton, Mick Stadter, Chris Crowe, David Chong "The Level Crossing Removal Project – Package 1 is part of the Victorian Governments commitment to remove 50 of the most dangerous and congested level crossings across Melbourne. This involved removin Jan 1, 1900 
