Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
- 
                     "Comparative Pile Load Tests In Alluvial Sands" - I. Introduction "Comparative Pile Load Tests In Alluvial Sands" - I. IntroductionBy Lawrence F. Johnsen In 1989, the Connecticut Department of Transportation authorized the evaluation and design for a reconstructed Route 1 bridge over the Quinnipiac River in the City of New Haven, Connecticut. The proje Jan 1, 1993 
- 
                     "Renovation Of The Amsterdam Concert Hall, Replacing 2000 Wooden Piles By 400 Vibration-Free Tubex Piles In Restricted Room." "Renovation Of The Amsterdam Concert Hall, Replacing 2000 Wooden Piles By 400 Vibration-Free Tubex Piles In Restricted Room."By Alexander J. Verstraeten Work started on the building of the Amsterdam Concert Hall in 1880 by driving over 2000 wooden piles of 13 m on which foundation-beams out of wood and brickwork were made. During construction the de Jan 1, 1987 
- 
                     "Static Load Testing" How Important Is It? ? Introduction "Static Load Testing" How Important Is It? ? IntroductionBy Jack Hayes The design and construction of deep foundations involve many uncertainties. For the designer there are uncertainties regarding soil and ground water variability, regarding sampling and lab testing, re Jan 1, 2000 
- 
                     "Underpinning By Jet Grouting" - Summary "Underpinning By Jet Grouting" - SummaryBy George K. Burke Underpinning of a structure has been traditionally expensive, time consuming, and, in many cases, caused as much settlement to the existing structure as it was trying to prevent. As underpinning is no Jan 1, 1991 
- 
                     "Value Engineering" In United States Of America "Value Engineering" In United States Of AmericaBy Maral Papazian Bedian Construction contracts in the USA contain the clause "Value Engineering" ? an interesting and curious clause allowing contractor initiated design changes. Misleading is the interpretation of value eng Jan 1, 2002 
- 
                     1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papers 1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papersBy J. Hartikainen 19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an Jan 1, 1994 
- 
                     100-Day Document - Mandatory Discussion, Mediation And Arbitration Of Construction Disputes ? 1.0 Coverage 100-Day Document - Mandatory Discussion, Mediation And Arbitration Of Construction Disputes ? 1.0 Coverage1.1 The parties agree to submit all claims, disputes or controversies arising out of, or in relation to, the interpretation, application or enforcement of this agreement, including dispute resolution Jan 1, 1994 
- 
                     10th International Conference On Piling And Deep Foundations: Amsterdam 2006 - Title ? Table Of Contents - Welcome Address From The Mayor Of Amsterdam, Job Cohen 10th International Conference On Piling And Deep Foundations: Amsterdam 2006 - Title ? Table Of Contents - Welcome Address From The Mayor Of Amsterdam, Job CohenIt is my great pleasure as mayor of the city of Amsterdam to welcome you today to Amsterdam, and to the 10th International Conference on Piling and Deep Foundations. The history of Amsterdam has b Jan 1, 2006 
- 
                     111,000m Of Continuous Flight Auger Piling For LNG Tank Bases In Poor Alluvial Soils, Isle Of Grain, UK 111,000m Of Continuous Flight Auger Piling For LNG Tank Bases In Poor Alluvial Soils, Isle Of Grain, UKBy Shane Baker Cementation Foundations Skanska Ltd encountered many significant challenges in designing and constructing the foundations for the LNG (Liquefied Natural Gas) tanks and associated structures at the Isl Jan 1, 2006 
- 
                     120 Years of Caisson Foundations in Chicago 120 Years of Caisson Foundations in ChicagoBy Robert E. Schock, Eric J. Risberg "Less than 20,000 years ago, the last of the glaciers retreated from the Chicago region. They left behind sheets of glacial clay till underlain by dense, over-consolidated till (“hardpan”) below which Jan 1, 2016 
- 
                     130 M Deep Bored Piles – A New Superlative 130 M Deep Bored Piles – A New SuperlativeBy Vijay Kumar, Serhat Baycan, Karsten Beckhans For the deep foundation of podium and tower of the Kuala Lumpur City Centre, BAUER (MALAYSIA) SDN. BHD. constructed 225 bored piles with diameter range of 2.0 to 2.5 m. In order to comply with the dep Nov 1, 2022 
- 
                     1785 Massachusetts Ave. NW, Washington, D.C. 1785 Massachusetts Ave. NW, Washington, D.C.By Daniel Stevenson, Richard Guenther "The preservation of historic buildings is not only essential to the understanding of our national heritage, but it is also environmentally responsible to adapt existing buildings to compatible new us Jan 1, 2017 
- 
                     2 Recent Technological Developments In Deep Foundations Without Soil Excavation - Recent Technological Developments In Deep Foundations Without Soil Excavation - Brief Review Of Papers To Session 2 2 Recent Technological Developments In Deep Foundations Without Soil Excavation - Recent Technological Developments In Deep Foundations Without Soil Excavation - Brief Review Of Papers To Session 2By Bengt H. Fellenius Session 2, Deep Foundation without Soil Excavation, has attracted no fewer than 22 papers dealing with subjects from soil improvement by grouting, injection, and deep mixing techniques through vibrofl Jan 1, 1994 
- 
                     2013 OPA Winner: Wolf Creek Dam Rehabilitation 2013 OPA Winner: Wolf Creek Dam RehabilitationBy Fabio Santillan, Michael F. Zoccola "Wolf Creek Dam and Lake Cum berland in Russell County Kentucky is operated by the United States Army Corps of Engineers (USAGE) Nashville District It is a combination 3,940 ft long (1,200 m) non-zone Jan 1, 2013 
- 
                     2017 OPA WINNER - Tri-Pod Suction Buckets for Offshore Wind Turbine Foundation 2017 OPA WINNER - Tri-Pod Suction Buckets for Offshore Wind Turbine FoundationBy Tae Hwan Lee, Jun-Shin Lee, Daejin Kwag, Sangchul Bang, Gerard T. Houlahan, Moo Sung Ryu "Geotechnical engineers have been installing innovative, permanent underwater foundation systems utilizing suction buckets for the offshore industry since the early 1980s (Senpere and Auvergne, 1982). Jan 1, 2017 
- 
                     2022 OPA Winner: Mosul Dam Rehabilitation Project 2022 OPA Winner: Mosul Dam Rehabilitation ProjectBy Raffaella Granta Mosul Dam is an earth fill dam located on the Tigris River, approximately 40 km (25 mi) northwest of Mosul, Iraq. The construction of the dam was completed in 1984. It is one of the largest multipurpo Oct 1, 2022 
- 
                     2023 OPA Winner: Climate Pledge Arena 2023 OPA Winner: Climate Pledge ArenaBy Meeok Kim, Thornton Tomasetti, Seth Knihtila, Michael Oakland, Shawn Leary The transformation of Seattle's historic KeyArena into the state-of-the-art Climate Pledge Arena, home to the NHL's Seattle Kraken, was no small feat. The $930-million renovation and expansion require Sep 1, 2023 
- 
                      
- 
                     25 Story Structure On River Flood Plain Soils Improved By Vibrocompaction And Compaction Grouting 25 Story Structure On River Flood Plain Soils Improved By Vibrocompaction And Compaction GroutingBy Frank Callanan The Ameristar Casino expansion project included the design and construction of a 25-story hotel and 9-story parking structure expansion. The site is located in a floodplain on the banks of the Missour Jan 1, 2009 
- 
                     250 M Ultra Deep Milled Diaphragm Wall: The New Frontier for the Cut off Wall Depth has Been Doubled by Trevi Group Technology 250 M Ultra Deep Milled Diaphragm Wall: The New Frontier for the Cut off Wall Depth has Been Doubled by Trevi Group TechnologyBy Maurizio Siepi, Stefano Trevisani, Pagliaccim Federico, Daniele Vanni "Abstract: The paper describes a large innovative project completed in 2012-20123 by Trevi Group, to develop equipment capable to install ultra-deep diaphragm wall. The project highlights the capacity Jan 1, 2014 
