Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Controlled Recirculation and Refrigeration at ValeÆs Taquari Potash Mine

    By S Bluhm, LádeáOliveira, R Funnell

    Taquari Vasouras potash mine (Vale Fertilizantes) has many interesting features including virgin rock temperatures of 50¦C at depths of 700 m. The mine has a relatively small shaft system with limited

    Jul 1, 2013

  • AUSIMM
    Unlocking Plant Capability through Targeted Debottlenecking of Arrium’s Magnetite Concentrator

    By C Jenkins, M Mativenga, C Stanton, J Gerber

    In 2014, Arrium completed an optimisation program on its magnetite concentrator, enabling a reduction in the overall cost base of producing concentrate through an increased ability to treat a wider ra

    Jul 13, 2015

  • AUSIMM
    Solving a Large Stochastic Integer Programming Model for Production Scheduling at a Gold Mine with Multiple Processing Streams and Uncertain Geology

    By M de Freitas Silva

    One of the main steps during the decision-making process of long-term mine planning is the definition of the optimal sequence of extraction, which usually is synonymous with maximising the discounted

    Nov 24, 2014

  • AUSIMM
    Predictive Three-Dimensional Modelling of Nuggety Gold Orebodies, Sunrise Dam, Western Australia

    By M J. Nugus, F Clark, E J. Hill, J T. Carswell, J S. Cleverley, N H. S Oliver

    High-nugget gold orebodies are difficult to model in 3D because samples from diamond drill core are generally too small to provide reliable estimates of the gold content of the larger body of rock, an

    Sep 26, 2013

  • AUSIMM
    The Application of Rock Engineering Systems to Block Caving to Identify the Effective Parameters

    By M Mohammad Khani

    An economic block cave is dependent to the characteristics of the rock mass at stages of caving. These are cave initiation, propagation and ore flow. In this research, the rock engineering system (RES

    May 9, 2016

  • AUSIMM
    Charles Dickens on the (potentially) changing role of globalisation and sustainability in the long-term future of mining and exploration

    By J P. Sykes, T C. McCuaig, M Jessell, A Trench

    The election of Donald Trump and the Brexit referendum herald a shift towards a tighter definition of economic value, at the expense of the broader value concept of sustainable development; as well as

    Sep 20, 2017

  • AUSIMM
    Closure Planning Lessons Learnt from the Century Mine

    By J Crosbie, M Lord, R Bitencourt, P Defferrard

    The MMG Century mine, which is the largest zinc/lead mine in Australia, began operating in 1999 and ceased mining from the open pit in July 2015, with processing completed in early 2016. Closure plans

    Jun 22, 2016

  • AUSIMM
    Building a Geometallurgical Model in Iron Ores using a Mineralogical Approach with Liberation Data

    By F Minz, P Lamberg, A Mwanga, C Lund, C Wanhainen, M Amiri Parian, J Rosenkranz

    A geometallurgical model is currently built in two different ways. The first and the most common way relies on geometallurgical testing, where a large number of samples are analysed for metallurgical

    Sep 29, 2013

  • AUSIMM
    Fluid Pressure, Geomechanical Evolution and Predictive Targeting of the Sunrise Dam Gold Deposit, Western Australia

    By M J. Nugus, J G. McLellan, T G. Blenkinsop

    High fluid pressures and deformation have been instrumental in the formation of high-grade gold lodes at the Archaean granite greenstone 12 Moz Sunrise Dam gold deposit in Western Australia. Historica

    Sep 26, 2013

  • AUSIMM
    Iron RoadÆs Prediction of Magnetite Concentrate Production from the Central Eyre Iron Project

    By P J. Marsh, P J. Bartsch, N J. Semler

    Iron Road Limited is currently studying the feasibility of producing 20 Mt/a of high-grade (67 per cent Fe) magnetite concentrate from a 2.6 Bt resource (JORC) located at Warramboo on the central Eyre

    Aug 12, 2013

  • AUSIMM
    Implementation of a Zoned Trigger Action Response Plan Associated with Changing Mine Conditions at Narrabri Mine

    By M Brady, O Salisbury, C Claassen, B Beamish, H Baxter

    Monitoring for signs of elevated spontaneous combustion in the active goaf behind the longwall face is crucial for early intervention of any potential heating incidents. Typically, trigger action resp

    Aug 31, 2015

  • AUSIMM
    Geometallurgical Characterisation of Australian Iron Ores – from Ore to Processed Product

    By M I. Pownceby, J Manuel, S Suthers, A Poliakov, E Donskoi, N Ware

    "The mining industry is constantly seeking methods for optimising the exploitation of mineral resources, such as iron ore, in a sustainable and eco-efficient manner for economic and social benefit. Wh

    Jun 15, 2016

  • AUSIMM
    Reduction in Diesel Particulate Matter at Oaky North

    By A Melloy, D Holt, M Jurak

    Oaky North is AustraliaÆs highest producing underground coal mine. In 2011, the mine produced 8.7 Mt of high-quality coking coal. The high quantities are a result of the constant strive for optimising

    Jul 1, 2013

  • AUSIMM
    Permanent Creek Diversion Through Spoil ù Back Creek, Queensland

    By P Bethune

    Back Creek is a tributary of the Condamine River. It flows in a northerly direction across the existing Commodore coal reserves. The diversion of Back Creek was proposed to minimise sterilisation of t

    Jan 1, 2003

  • AUSIMM
    RISKGATE and Underground Operations

    By J Harris, J Li, M Shi, P A. Kirsch, D Sprott

    Australia has an enviable global reputation as a leader in health and safety outcomes in the hazardous industry of mining, in part due to an increased application of risk management regarding operatio

    Mar 24, 2014

  • AUSIMM
    Advanced Ventilation Control – An Analysis of Innovation and Environmental Sustainability

    By V S. Mutton, M J. Shearer

    "The current economic challenges faced by the mining industry led to a review of options for reducing the cost of ventilation control devices (VCDs). The VCDs at the Mount Isa Mines site operated by G

    Aug 31, 2015

  • AUSIMM
    Simulating Time versus Mass Basis?Sampling

    By J Ta’ala, M Handyside

    Mechanical sampling from conveyors has historically been a staple in the iron ore industry when information related to chemistry, sizing and moisture is required. In order to comply with ISO 3082:2009

    Jul 29, 2014

  • AUSIMM
    Introducing and Sustaining a Continuous Improvement Program in Mines and Smelters

    By M Costa, L Polizzi

    Process optimisation and continuous improvement are usually acknowledged when making a process more effective, efficient and transparent. During the last few decades, thousands of companies around the

    Sep 1, 2014

  • AUSIMM
    Hydrothermal Rare Earth Element Mobilisation Processes in the Yinachang Fe-Cu-(REE) Deposit, South-west China

    By X Li, M-F Zhou

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Yinachang deposit in south-west China contains large amounts of Fe, Cu and rare earth e

    Mar 18, 2015

  • AUSIMM
    The Bau Gold District -- East Malaysia

    The Bau Goldfield lies in the southwestern corner of Sarawak in East Malaysia. Evidence of past mining in the form of open pits and adits can be found over an area of 250 sq kin, centred on the townsh

    Jan 1, 1997