Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Overburden Preparation Moura-Kianga Coal Mines, Bowen BasinQuite apart from economic considerations, the following performance parameters must be considered when selecting an explosive for a particular blasting operation. 1. total energy yield/kg, and more
Jan 1, 1974
-
High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, PhilippinesBy C Harrison, A Bowskill
The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to
Sep 17, 2014
-
Underground Footwall Monitoring at the Sublevel Caving Mine – Kiirunavaara, SwedenBy M Svartsjaern, D Saiang and K Mäkitaavola
The Kiirunavaara mine is a large-scale (28 Mt/a) iron ore mine located in northern Sweden. The mine is owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB) using sublevel caving (SLC). The
May 9, 2016
-
The Nature and Origin of the Gold-Bearing Laterities at Mount Gibson, Western AustraliaBy Sale M, Clarke R, Parker M
The Mount Gibson goidmine is located at the southern end of the Retaliation greenstone belt within the Murchison Province, approximately 300 km northeast of Perth, Western Australia. Economic gold m
Jan 1, 1988
-
Rakeless Thickener Operation at St Ives Gold PlantThe first 12 m diameter rakeless thickener in the Australian gold mining industry was installed to treat plant tailings at the St Ives gold plant in April 2000. The plant processes approximately 3.2 M
Jan 1, 2002
-
Life-of-Mine Ventilation System Upgrade at Springvale Colliery - A Case StudyBy B Smith, R Gelson
Springvale Colliery is an underground longwall mine situated approximately 10 km north-west of Lithgow in the western coalfields of New South Wales. Following a full-scale review of the mineÆs ventila
Jul 1, 2013
-
Optimal goaf hole spacing in high production gassy Australian longwall mines – operational experiencesBy B Belle
In a predrained gassy coalmine, ventilation control plays a secondary role to the longwall (LW) goaf drainage systems to safely manage panel return gas levels. Typically, the LW specific gas emission
Aug 28, 2017
-
Ashers-Waituna and Hawkdun Lignite Deposits: Their Resources and Use PotentialBy A M. Sherwood
The Otago and Southland lignite deposits represent by far the largest known fossil energy resources in New Zealand. Despite their size they have remained virtually untouched since exploration in the 1
Jan 1, 2005
-
Applying Controlling Blasting to Minimise the Damage at the Water Dam Ramp 23 at Ensham ResourcesBy I Villalba
The need to continue the development of the Ensham mine has led to blast up to 75 m to the Eastern side of a water dam in the vicinity of Ramp 23. The water dam wall is exposed to blasting over a
Nov 8, 2011
-
Application of steel bollards for managing the hazards associated with open stopes, Waihi Underground OperationsBy C E. Gawith
The Waihi underground mining operation currently mines epithermal veins ranging from two metres up to ten metres in width using a ‘Modified Avoca’ stoping method. This method consists of longhole benc
Mar 15, 2021
-
From Inception to Completion ù A Blind Bored Ventilation Shaft and Watertight Lining for the Springvale Coal MineBy J Zeni
In 2001, the Springvale Coal Mine determined a requirement for a 360 m deep vertical airway to ventilate ongoing underground longwall mining operations. The project, referred to as the Springvale No 3
Jan 1, 2005
-
Grasberg Block Cave Haulage Project – Design and Construction UpdateBy B Mead, N D. Pascoe
The Grasberg block cave rail haulage system will be located in the Grasberg mining district on the island of Papua, Indonesia at an elevation of almost 3000 m above sea level. It will transport 160 00
May 9, 2016
-
Evidence of Reduced Water Infiltration by Microhardpans û Electrical Resistivity Measurements at Pe±a de Hierro, Rio Tinto, SpainBy M Furche, U Noell, C Grissemann, J A. Meima, T Graupner, A Romero-Baena
The mining residues at the abandoned copper mine site Pe±a de Hierro, located at the headwaters of the Rio Tinto, contribute substantially to the pollution of the river with high loads of Fe, As, Pb,
Jan 1, 2008
-
Resource Estimation and Grade Assignment - A Comparison Between Historical Production and Current Maxwell Mining Validation Case Study at Morning Star Gold Mine, Woods PointBy P Jackson, J Rea, M D. Goodz
The Morning Star Gold Mine has operated over a 101-year period, producing gold from narrow quartz veins and sulfide stockworks hosted mainly within a dioritic-gabbroic dyke. The deposit has been devel
Jan 1, 2008
-
Formation of <i>O,OÆ</i>-Di-Alkyl-Dithiophosphate Copper(I) Complexes on the Surface of Synthetic Chalcocite ù NMR and SEM StudiesBy O N. Antzutkin, W Forsling, K J. Pike an
The adsorption mechanism of three different O,OÆ-di-alkyl-dithiophosphate (dtp) collectors, K[S2P(OR)2] with R = Et, i-Bu and i-Amyl, on the surface of synthetic chalcocite (Cu2S) was studied by means
Jan 1, 2005
-
The Dugald River Zinc-Lead-Silver Deposit; An Example of a Tectonised Proterozoic Sratabound Sulphide DepositBy Allnutt S. L, Carswell J. T, Mutton A. J
The Dugald River Zn-Pb-Ag deposit occurs within the complexly deformed and metamorphosed sediments of the Middle Proterozoic Cloncurry Terrane, Eastern Succession, Mount Isa Inlier. The sedimentary
Jan 1, 1993
-
Composition, Lithochemistry and Radiogenic Isotopes of Porphyritic and Equigranular Intrusions in the Ertsberg Mining District, Papua, IndonesiaBy G de Jong, W Sunyoto, M Cloos
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Ertsberg mining district is a 100 km2 area in the highlands of Papua, Indonesia. The di
Mar 18, 2015
-
Selection of Mine Water Management Options Considering both Water and Energy ImpactsBy M T. Nguyen, S Vink, M Ziemski
On any given mine site the water system is contingent upon its initial design. Through time the initial design is adjusted by a myriad of water management options in order to improve water system perf
Nov 26, 2013
-
Piling and Raise Bore Construction – Key Learnings from a Client’s PerspectiveBy R Austerberry, S Green
Highly weathered ground, limited collar options and the need to achieve a desired outcome at the lowest possible cost led to the need to adopt a construction approach that had no established design me
Mar 24, 2014
-
Geology and Exploration of the Hamata DepositBy Young DJ
Gold mineralisation at the Hamata prospect is related to a series of stacked pyrite and quartz-pyrite veins associated with a number of shears which strike N to NE and dip E. Mineralisation is con
Jan 1, 1991