Search Documents

  • AUSIMM
    Statistical Analysis of Sampling and Assaying Results, Drilling Campaign, King Island Scheelite Mine, Tasmania

    During the drilling campaign conducted between October, 1942; and May, 1943, to prove the extent of the scheelite deposit worked by King Island Scheelite N.L. at Grassy, King Island, Tasmania, 35 hole

    Jan 1, 1950

  • NIOSH
    RI 3407 Earth Vibrations Caused By Mine Blasting Progress Report 2 ? Introduction

    By J. R. Thoenen

    In Progress Report 1,4/ a number of facto mere demonstrated and conclusions drawn from experimental tests and records made during commercial blasting operations at a number of quarries. For example, t

    Jan 1, 1938

  • AUSIMM
    Nature Conservation and the Minerals Industry

    This paper examines the reform of mining legislation over recent years, the establishment of new Crown land management agencies, and the role of the Crown and environmental groups in nature conservati

    Jan 1, 1995

  • SME-ICGCM
    Rating Coal Mine Roof Strength From Exploratory Drill Core

    Characterizing coal mine roof rock is extremely important for hazard assessment, reinforcement, and entry design. The Coal Mine Roof Rating (CMRR) is an innovative rock mass classification that has fo

    Jan 1, 1996

  • IOM3
    Components of a recovery factor in gold and tin dredging

    By R. H. T. Garnett

    N.B. This paper provoked much (positive!) discussion in later issues, with responses from the author (and thanks also for the many private contributions he had received) - see under Garnett R.H.T. Exp

    Sep 1, 1991

  • AIME
    Getting The Foreign Workman's Viewpoint

    By Prince Lazarovich, Hrebelianovich

    I WAS asked by the chairman of one of the Sessions on Employment Problems to talk about the viewpoint of the foreign workingman. I am not a workingman. I have never done what a work-hand might call an

    Jan 4, 1918

  • CIM
    Deep Bed Thickener Operation at the EKATITM Diamond Mine

    By T. G. Paradis, C. A. Mohns

    "This paper summarizes the Wren CAT (Clarifier and Accelerated Thickener) deep bed thickener operation at the EKATITM Diamond Mine in Canada’s Northwest Territories. EKATITMs’ thickener project is pre

    Jan 1, 2000

  • CIM
    Optimization of the Xstrata Copper-Horne Smelter Operation Using Discrete Event Simulation

    By J. M. Simard, S. Morissette, P. Coursol, P. Mackey

    A new, powerful model is presented that focuses on plant logistics and scheduling aspects of the smelting, converting, fire refining and casting operations at the Horne smelter. This plant complex is

    Jan 1, 2009

  • AUSIMM
    Pressurized Grouting of a Deep Diamond Drill Hole by Broken Hill South Ltd.

    By Jones S. C

    The problem of sealing a fluid serieite zone at a hole depth of 4000 ft was overcome by using a composite non-return valve plug and rod assembly which enabled cement to be forced under pressure into t

    Jan 1, 1966

  • NIOSH
    RI 8285 Prediction of Failures in Mines - An Overview

    By B. T. Brady

    Recent theoretical, experimental, and field studies conducted by the Bureau of Mines suggest that rock failures may be predicted and, in some instances, controlled. Theoretical studies that were later

    Jan 1, 1978

  • SME
    The Expectations For Coal: Is Our Government And The Coal Industry Prepared?

    By M. S. Miller

    With prevailing assumptions that plentiful domestic coal reserves will be available for meeting our Nation’s expectations for on future low emission, coal-fired power plants, major government funding

    Jan 1, 2004

  • SME
    Optimizing Influences In The Selection of Grinding Mill Technology

    By G. Duncan, K. Winther, R. Ericsson

    Distinct trends in grinding mill technology have emerged in recent years. In an effort to optimize overall mill performance for the needs of the End User, broad measures of logistical speed, process f

    Jan 1, 1999

  • IOM3
    Ammonia leaching process for Escondida copper concentrates

    By W. P. C. Duyvesteyn, B. J. Sabacky

    Reprinted with revisions from Extractive metallurgy of copper, nickel and cobalt, volume I: Fundamental aspects. ed. Reddy R.G., Weizenbach R.N. Warrendale, Pennsylvania: The Minerals, Metals and Mate

    Dec 1, 1995

  • NIOSH
    IC 9178 - A Catastrophe-Theory Model For Simulating Behavioral Accidents

    By William E. Souder

    Behavioral accidents are a particular type of accident. They are caused by inappropriate individual behaviors and faulty reactions. Catastrophe theory is a means for mathematically modeling the dynami

  • SME-ICGCM
    A Case History of the Effect of Mine Subsidence on a Concrete Arch Bridge in Northern West Virginia

    By R. B. Alke

    Request to Mine Beneath Bridge The Jabs Run Bridge is a reinforced portland concrete arch filled bridge located on WV Bouts 7 near Pentress, WV. The bridge has a span of 22.9 m (meters) and a height o

    Jan 1, 1984

  • DFI
    Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project

    By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres

    In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma

    Jan 1, 2018

  • IOM3
    Earthing practice in metalliferous mining: results of study at Mount Isa mine, Queensland, Australia

    By R. Sankey, L. Gatty, F. Bizzozero, G. F. Shannon, F. Savaglio, L. McDonald

    State mining regulations in Queensland stipulate that a mine be provided with an earth installed on surface and that all underground equipment that needs to be earthed should be connected via a copper

    May 1, 1991

  • SME-ICGCM
    Passive Seismic Imaging for Determination of the Longwall Rear Abutment Location

    By Erik Westman

    Few studies have been conducted regarding the location, movement, and relative magnitude of the rear abutment of a longwall coal mine. The rear abutment, or the abutment pressure arch in the gob area,

    Jan 1, 2012

  • TMS
    The Problem Of Sulphur Dioxide Emissions From Canadian Copper And Nickel Smelters

    By E. Ozberk

    The copper and nickel smelting industries are important contributors to the technical and economic well-being of Canada while some of the smelters are among the largest sources of sulphur dioxide emis

    Jan 1, 1983

  • DFI
    Test Pile Program To Determine Axial Capacity And Pile Setup For The Biloxi Bay Bridge

    By W. Robert Thompson

    Hurricane Katrina caused significant damage to transportation structures on the Gulf coast in August, 2005, including the destruction of the US 90 Bridge over Biloxi Bay, Mississippi. Part of the suc

    Jan 1, 2009