Search Documents

  • ISEE
    Implosive-Type Electrical/Mechanical Conectors-Noise Spectrum and Blast Pressure Modificiation

    By Ettore Contestabile, Cameron Thomas

    Implosive connectors such as XECONEXTn have been used extensively for joining electrical conductors. This implosive action of explosives has also been used in other forms of high-energy metal working

    Jan 1, 1994

  • AUSIMM
    Geological and metallurgical characteristics of banded iron formation associated detrital iron mineralisation in Central West Africa

    By F Linares, B De Waele, K Bischoff, M Lacorde, G Loveday

    Recent exploration has identified the presence of detrital iron deposits (DIDs) associated with banded iron formation (BIF) units in the north-west of the Congo Craton, Gabon. The regional geology com

    Jul 24, 2017

  • NIOSH
    Technology Transfer (5ba8a74b-ef04-4afb-bca6-57c0afc4bc82)

    "Research on the control of exposure to respirable contaminants in mine atmospheres is conducted in five areas; 1) control of dust generation, 2) dilution, dispersion and collection of dust in mine ai

    Aug 31, 1989

  • NIOSH
    RI 6594 The Hafnium-Vanadium System

    By D. K. Deardorff

    The hafnium-vanadium phase diagram was constructed within an estimated accuracy of ± 10° C and ± 2 wt pct composition. Alloys for investigation were melted under an atmosphere of purified helium by no

    Jan 1, 1965

  • AUSIMM
    Philex Gold Philippines, Inc's Bulawan Mine - The Philippines Largest Primary Gold Producer

    By Anievas JB, Sevillano AC

    This paper describes the acquisition, exploration, development, initial operation and subsequent financing of the Bulawan mine by means of a listing on the Toronto Stock Exchange of a subsidiary of th

    Jan 1, 1997

  • AUSIMM
    The Gosowong Goldfield – A World-class Epithermal Gold-silver District in Indonesia

    By A Harris, N Fitzpatrick, F MacCorquodale

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Gosowong epithermal Au-Ag deposits, located on the island of Halmahera, North Maluku Pr

    Mar 18, 2015

  • CIM
    A Standards Based Approach to Mobile Equipment Data

    By Peter Cunningham

    General Description of Projects The objective is to streamline data transfer within our Process Control and Business Systems for the purposes of tracking actual production, reducing manual record kee

    May 1, 2013

  • ISEE
    Optimization of Blast Fragmentation at Kisladag Gold Mine

    By Erkan Bayrak, Serkan Erkara, Ozkan Duzgun, Ekin Gungor

    This paper presents part of the outcomes of the drill and blast optimization project carried out at Kisladag Gold Mine in Turkey. Kisladag Gold Mine is the largest gold mine in Turkey with a low-grade

    Jan 1, 2015

  • CIM
    Predicting the Effect of Grinding Media Size Distribution on the Performance of a Ball Mill Using Discrete Element Method (DEM) and Population Balance Techniques

    By S. Makni, A. Faucher, F. Robichaud, A. Bouajila

    "Optimizing the ball charge in a grinding mill may be needed to maximise throughput or alternatively, to achieve proper product size in more challenging situations. Efforts to optimise the ball charge

    Jan 1, 2012

  • SME
    The QIT Madagascar minerals deposits - geology, mining & mineral processing

    By M. Mead, J. Dumouchel, W. Yule, J. Giroux

    The QMM mineral sands of South East Madagascar contain approximately 1,900 million tonnes of mineable sand with a total heavy mineral (THM) content of roughly 4.5wt%. The QMM deposits are the world’s

    Jan 1, 2005

  • NIOSH
    Static Electricity In Hospital Operating Suites - Direct And Related Hazards And Pertinent Remedies - Preface And Summary

    By P. G. Guest

    MANY of the gases and vapors used in anesthesia form explosive mixtures with oxygen or air. Sources of ignition for these mixtures always have existed in operating and anesthetizing areas. When ether

    Jan 1, 1953

  • DFI
    Session IV - Notable International Projects - Special Foundation Technique For The Intersection Of Two Canals Near Magdeburg, Germany - Summary:

    By Wolfgang G. Brunner

    The closing of the gap in the European waterway- net is one of the big and challenging traffic projects following the German reunification. The water canals in the North German plain connect the Rhine

    Jan 1, 2000

  • NIOSH
    Ergonomic And Existing Seat Designs Compared On Underground Mine Haulage Vehicles

    By Chris Jobes, Alan Mayton, N. Kumar Kittusamy, Dean Ambrose

    NIOSH researchers conducted a study to compare seat designs on underground coal mine haulage vehicles. The objective of the study was to support prior findings that NIOSH-designed seats, which incorpo

  • SME
    Excavation Support And Groundwater Control Using Soil-Cement Mixing Wall For Subway Projects

    By David S. Yang, Osamu Taki

    The innovative Soil-Cement Mixing Wall Technique, developed independently in Japan, consists of mixing in-place soils with cement grout using multi-axis augers and mixing paddles to construct overlapp

    Jan 1, 1989

  • SME
    Ergonomic Interventions At Badger Mining Corporation (30a13109-bb6a-4698-a288-c4dfde51a853)

    By J. Torma-Krajewski, M. Lehman

    In 2005, NIOSH and Badger Mining Corporation entered a partnership to implement ergonomic interventions, including a systematic process, to address exposures to risk factors that may result in musculo

    Jan 1, 2007

  • AUSIMM
    Quantifying Domain Uncertainty for an Iron Ore Deposit

    By A Jewbali, J Phillips, C Boyle

    Normal practice in the mining industry is the creation of a single geological model. These models provide a single interpretation of the geological and mineralisation domains. These interpretations in

    Aug 12, 2013

  • AUSIMM
    Study of Bauxite Separation by Using Flotation Column

    Study of Bauxite Separation by Using Flotation Column

    Sep 13, 2010

  • SME
    Development Of A Tool To Predict Performance Of Debladed Main Fans At Henderson Mine

    By D. Loring, J. Almgren

    Climax Molybdenum Company’s Henderson Mine is a large panel caving molybdenum mine located about 43 miles west of Denver, Colorado. Three Joy M120-72-880 fans are installed in parallel on the No. 1 ex

    Jan 1, 2007

  • SME
    Bias And Error In Mine Project Capital Cost Estimation

    By J. Bertisen, G. Davis

    Previous analyses of small samples of mining projects have found that feasibility studies tend to well under-estimate the actual capital costs of the project. Our review of 63 mining and smelting pro

    Jan 1, 2007

  • AUSIMM
    Plastics recycling and sampling

    By S C. Dominy

    This contribution examines the effect of feedstock sampling before the sorting stage of polyethylene terephtalate (PET) bottle recycling. Batches of waste PET bottles may contain non-PET bottles which

    May 9, 2017