Search Documents

  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal Using the Parry Process (6d646f40-1507-4d07-950f-53652f2f845c)

    A pilot plant was constructed for the low temperature carbonization of Wallarah (N.S.W.) coal at the rate of 300 lb/hr. The design was based on an entrained state carbonizer developed by Parry and D.S

    Jan 1, 1963

  • TMS
    The Recovery of Valuable Metals Containing in the Slag of Jamesonite Smelting in the Blast Furnace

    By Zhao-feng Xie

    A new process of recycling valuable metals containing in the slag of jamesonite smelting in the blast furnace was studied. In this process, the valuable metals such as Pb, Sb, Zn and In etc. were fume

    Jan 1, 2009

  • AIME
    Rock Mechanics Studies In A Mechanized Longwall Coal Mine

    By Paul H. Lu

    Methods and results of measuring three basic parameters for ground stability control, ground pressure, strata movement, and geomechanical properties of mine rock are presented in this paper. It is fou

    Jan 1, 1984

  • NIOSH
    IC 8034 Bibliography Of Bureau Of Mines Articles On Thermodynamics Of Petroleum Constituents And Related Compounds: January I, 1944-December 31, 1960 ? Introduction

    By J. P. McCullough

    In 1943, the Federal Bureau of Mines began a program of thermodynamic investigations of petroleum constituents and related compounds. These systematic, long-range studies, which were conducted in the

    Jan 1, 1961

  • CIM
    Propriétés des roches et réponse du massif lors du minage sous contrainte modérée à élevée Partie A - Historique des travaux

    By Denis Labrie

    Le minage en profondeur sous contrainte modérée à élevée présente de nombreux défis aux opérateurs et aux ingénieurs de mine notamment au niveau du contrôle de terrain et de l?environnement minier sou

    May 1, 2002

  • NIOSH
    RI 5311 Consumable-Electrode Arc Melting Of Titanium And Its Alloys ? Summary

    By R. W. Huber

    A consumable-electrode arc-melting furnace was constructed at the Bureau of Mines Physical Metallurgy Laboratory, College Park, Md., for the production of uncontaminated titanium and titanium-alloy in

    Jan 1, 1957

  • CIM
    The Minexan on Stream Analyser Evaluation by Selco Mining

    By G. A. Mallory

    "The South Bay Division of Selco Mining is located fifty-four miles northeast of Ear Falls Ontario on Confederation Lake. The concentrator operates five days a week and processes six hundred tons per

    Jan 1, 1981

  • IIMP
    Tecnología de la información geológica aplicada a la minería de pequeña escala

    By Rómulo Mucho Mamani

    El presente trabajo señala el uso de la tecnología existente en INGEMMET para el servicio de los operadores mineros de pequeña escala, orientados fundamentalmente a la explotación del oro. En este se

    Sep 12, 2005

  • CIM
    Murrin Murrin CCD1 Rake Mechanism Modification the Decision and the Result (3e495dbc-2cca-4184-88b3-9cc5914b2481)

    By Brad Hewitt, Jeff Belke

    "Murrin Murrin Operations has not had a successful beginning. Numerous reliability and operability issues many of which are the result of design decisions have been addressed through mechanical and op

    Jan 1, 2005

  • AUSIMM
    Ore Genesis in Fracture-Controlled Hydrothermal Systems: Percolation Theory Approaches

    By M A. Knackstedt

    Coupling between deformation processes and rock permeability is a major factor influencing the architecture of fluid migration and the localisation of ore deposition in several types of hydrothermal o

    Jan 1, 1999

  • SME
    Factors Affecting The Location Of The Neutral Point In Ventilation Systems (4b1f3a2d-a6d9-44c2-9c56-0100dbf7a4af)

    By J. M. Wempen

    Booster fans in underground coal mines are often located using the concept of a neutral point. Normally, intake airways are maintained at higher absolute pressure than return airways, so air leaks fro

    Jan 1, 2012

  • SME
    Masbate gold operation is site of first commercial heap leaching plant in Philippines

    By Libby R. Ricafort, Victorio V. Pato, R. S. Pizarro

    Introduction Atlas Consolidated Mining and Development Corp. (ACMDC) started gold production at its Masbate gold mine early in 1980. This involved an open-pit mine and a 3.5-k/d (3850-stpd) carbon-in

    Jan 9, 1987

  • AUSIMM
    Diamond Drill, Calyx and Hand Boring by the Victorian Mines Department

    Very few of those occupied in pursuits other than mining have any conception of the extent of boring operations that have been carried out on the gold and coal fields of Victoria, or of the valuable a

    Jan 1, 1901

  • AUSIMM
    Digital rocks for iron ore sinters – towards a D quantification of sinter textures

    By D O’Dea, B Godel, T Honeyands, B Ellis, T Harvey

    X-ray computed tomography (XCT) is a non-destructive technique that allows the exploration of the internal structure of solid objects in 3D. Over the past ten years, the combination of XCT with more c

    Jul 24, 2017

  • SME
    A Citizens Guide to Uranium: Recent Experiences in Communicating With the Public and Public Officials on New Uranium Recovery Projects

    By S. H. Brown

    In our work as health physicists*, we do a lot of public speaking and interaction with the public on issues related to development of uranium mining and milling (?uranium recovery?) in the US. Underst

    Feb 23, 2014

  • AIME
    Bougainville's EDP Techniques Up Mine Productivity, Simplify Planning

    By H. David Swain

    On Bougainville Island in Papua New Guinea, Bougainville Copper Ltd. (BCL) has successfully applied electronic data processing (EDP) techniques to pit operations and mine planning. Though the EDP prog

    Jan 3, 1979

  • SAIMM
    Ventilation For Sinking Vertical, Sub Vertical And Decline Shafts.

    By D. M. Walters

    To achieve safe and healthy working conditions in shaft sinking operations, ventilation, and where necessary cooling, must be provided. These requirements are considered for sinking vertical, sub-vert

    Jan 1, 2009

  • SME
    Electrical Resistivity: An Answer to the Challenges Raised by the Design of a 17 Km-long Tunnel in the Andes

    By Farrukh M. Mazhar, Philippe P. Martin

    Electrical Vertical Sounding (EVS) profiling has proven to be a valuable tool to set the alignment and guide the design of a 17 km-long, 4.7m diameter water-conveyance tunnel in the Peruvian Andes at

    Jan 1, 2003

  • AUSIMM
  • NIOSH
    OFR-48-83 System To Prevent Clogging Of Gas Sampling Tubes

    By Kyle W. Charlton

    The Bureau of Mines utilizes special testing methods for the analysis of underground mine atmospheres for use during or after mine disasters and fires. These methods depend upon drawing sample gas to

    Jan 1, 1981