Theoretical, practical, and economic difficulties in sampling for trace constituents - SynopsisMany industries base their decisions on the assaying of tiny analytical sub-samples. The problem is that most of the time several sampling and sub-sampling stages are required before the laboratory pr
Jan 1, 2010
-
Lucky Friday’s No. 4 Shaft - Ten Years from Concept to CompletionBy David Berberick
"Hecla Limited’s No. 4 Shaft at the Lucky Friday Mine is the largest capital expenditure in the corporation’s 128-year history and is considered the deepest shaft in the United States. This paper will
Jan 1, 2019
-
Developing a Training Strategy for Quality, Safe and Productive Extracting OperationsThe extractive industry has been faced with a situation where there has been no systematic and formalised training and education structure available. Previous structures which were available, e.g. the
Jan 1, 1997
-
Ground Stability Problems Associated with the Black Rock Open Cut at Mount IsaOpen cut mining of the Black Rock chalcocite ore started in 1963. A ground movement monitoring programme was commencing in the early stages of mining when signs of instabilityof the western wall becam
Jan 1, 1968
-
RI 5209 The Three Kids Manganese Deposit Clark County, Nev.: Exploration, Mining, And Processing ? SummaryBy A. C. Johnson
The Bureau of Mines explored the Three Kids deposit in 1941 as part of a strategic minerals program. Earlier mining and exploration had established the presence of a substantial tonnage of medium-grad
Jan 1, 1956
-
Battery Grade Manganese Dioxide From Risdon Anode MudA process was developed to produce electrolytic manganese dioxide, suitable for use in high quality dry cells, from Risdon anode mud. ImpurItIes present In the anode mud were removed prior to the elec
Jan 1, 1968
-
Capping Stations on Broken Hill South Ltd.In the Broken Hill South mine tile practice of issuing to the miner a quantity of fuse and a box of caps from which he made up the "rods" required for a particular blast, has been abandoned.
Jan 1, 1932
-
IC 6901 Gold Mining And Milling In The Black Mountains, Western Mohave County, Ariz. ? IntroductionBy E. D. Gardner
This is one of a series of papers describing mining and related subjects affecting mining in western mining districts and mineralized areas. The parts of this paper pertaining to current production, m
Jan 1, 1936
-
New CIGMAT Downhole Penetrometer (DHP-CIGMAT) For Use During Drilled Shaft ConstructionBy C. Vipulanandan
It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increas
-
Optimization Of The Pig Iron Desulfurization Inside A Torpedo Car By Physical Modeling Techniques.By Varadajan Seshadri
Keywords: torpedo car, kinetics, physical modeling A 1:6 torpedo car physical model was built to assess the optimum refining conditions for pig iron desulfurization in the torpedo car considering t
Jan 1, 2005
-
Flotation of Base Metals from Grinding Mill DischargesBy A. J. Williams
"Conventional base metal milling practice normally consists of crushing, grinding and cyclone classification followed by flotation. It is the authors' belief that the commencement of flotation after c
Jan 1, 1984
-
Rare Earth Elements and selected major elements distribution in the siliceous-clayey silts from the NE Pacific abyssal Basin (Clarion-Clipperton Fracture Zone)By Lukasz Maciag, Ryszard Andrzej Kotlinski, Ryszard Krzysztof Borówka, Dominik Zawadzki
Concentration and composition of rare earth elements (REE) and major elements in the sediment samples from the IOM H11 Fe-Mn nodule deposit, eastern part of the Clarion-Clipperton nodule field (locate
Sep 1, 2014
-
Some Myths About DC Arc FurnacesBy R. T. Jones
Keywords: Pyrometallurgy, DC arc furnace, myths, history, hollow electrode, radiation, resistance, flicker, AC DC arc furnaces are widely used for steel scrap melting as well as for reductive smel
Jan 1, 2011
-
Presplitting Techniques for Conventional, Air Deck and Dimension Stone Applications"The objective in controlled blasting is to reduce overbreak to control the final pit wall slope, shaft, drift ditch, bench, etc. to the final planned excavation limit. The six main types of controlle
Jan 1, 1994
-
FLSmidth Flotation Developments - Dorr Oliver MachinesBy S Vianna, K Caldwell, R Silva, T Olson, D Bell
Studies to enhance the FLSmidth forced air machine through changes in the design, showed important improvements through changes in the number of Rotor blades, stator designs, rotor air distribution an
Jul 15, 2013
-
Cadmuim-Base Bearing MetalsIn considering the preparation of any paper concerning bearing metals, one feels a certain amount of diffidence in venturing into a field which has been capably explored at great length and in great d
Jan 1, 1934
-
Effect of Heat Treatment on Microstructure and Mechanical Properties of Cast Al-Si-Cu-Mg Alloy with Micro Additions of Zr-Ti-VBy S. K. Shaha, W. Kasprzak, D. L. Chen, J. Friedman, F. Czerwinski
The role of solutionizing conditions within the T6 heat treatment of the cast Al-Si-Cu-Mg alloy with micro-additions of Zr-Ti-V was assessed in terms of their influence on microstructure and mechanica
Jan 1, 2015
-
Interpretation Of The Effect Of Frother Type And Concentration On Flotation Performance In An OK3 CellBy B. A. Comley
Over the past few decades a great deal of effort has gone into characterizing the effects of frother type and concentration in flotation using a variety of two-phase techniques. Whilst useful and info
Jan 1, 2007
-
Predictive Control and Real Time Optimization in the Minerals IndustryBy Quin Dennis
Process Optimization ?What is it really? It is NOT ?a larger fan to increase draft through a process ?a larger pump on a wet circuit ?a wider conveyor belt for solid materials ?a larger feed el
Nov 1, 2011
-
Developments in the Design of Quarry Crushing Plants and Storage Bins at the Broken Hill Proprietary Co. Ltd.The changes in layout and design over 48 years, from the first crushing and shiploading plant installed at Whyalla in 1915, up to the present plant being built at Koolan Island, Yampi Sound may be sum
Jan 1, 1963