  • SAIMM
    Observations Of Behaviour Of Oxide Inclusions At Molten Slag/Steel Interfaces

    By Y. Wang, S. Sridhar, B. Coletti, G. N. Shannon, S. Vantilt

    The final removal of inclusions in the ladle, tundish, and mold in a continuous casting process involves the kinetic steps of liquid film drainage, interface rupture, and absorption of the inclusion i

    Jan 1, 2004

  • SAIMM
    Evaluation Of A Limit Equilibrium Model To Simulate Crush Pillar Behaviour - Synopsis

    By M. du Plessis

    This paper describes the evaluation of a limit equilibrium model to simulate the behaviour of crush pillars in platinum mines. An analytical model was derived to calculate the residual average pillar

    Jan 1, 2011

  • AUSIMM
    The Importance of Mineral Processing Technology for Establishing a Sustainable Society with an Environmentally-Sound Material Cycle

    For establishing sustainable material cycle process in human system, a brand new concept should be created, which could recycle the waste materials, which are land-filled and discarded under present e

    Sep 13, 2010

  • SME
    Current Gold Rush in Madre de Dios Department, Peru

    By J. D. Bliss

    The discovery that triggered the current gold rush in southeastern Peru was made in about 1975 along the Rio Madre de Dios in Madre de Dios Department (Fig. 1). About 5000 to 10,000 miners (called chi

    Jan 1, 1992

  • AUSIMM
    Some Notes on the Geology of Stannary Hills, North Queensland

    THE following notes were accumulated during the years 1905 to 1911, when the writer was employed at Stannary Hills. The writer's duty took him over the underground workings daily. In odd moments

    Jan 1, 1918

  • SME
    Rehabilitation of New Croton Aqueduct Shafts

    By W. James Marold

    The New Croton Aqueduct (NCA) was the first major water supply tunnel for New York City. The 50-km (31-mi) long tunnel has 33 open shafts 6 m (20 ft) to 121 m (397 ft) deep. The tunnel and shafts are

    Jan 1, 2008

  • ISEE
    Hole Deviations in Mining Operations: Types, Sources and Effects

    By Sam Kangwa, Thomson Sinkala

    Th e re are three basic types of hole deviations in long hole d ri l l i n g , n a m e l y collar i n g , alignment and tr a j e c t o r y dev i a t i o n s . In mining, the accur a cy in drilling has

    Jan 1, 2004

  • ISEE
    *Kuz-Ram and Digital Image Processing System Combination to Determine Specific Blasting Parameters

    By A. Karadogan, G. Tuncer, A. Kahriman

    Determination of optimal blast parameters have been the priority act for blasters on the field due to financial and technical properties of the operation. Therefore many researchs were done to establi

    Jan 1, 2005

  • SME-ICGCM
    Designing for Upper Seam Stability in Multiple Seam Mining

    Historically, the selection of mining sequence for multiple seam conditions has been based on many factors other than ground control considerations and minimization of interaction effects. Today, nume

    Jan 1, 1986

  • SME
    Optimization of Tellurium and Antimony Extraction from Residue Generated in Alkaline Sulfide Leaching of Tellurium-Bearing Alkaline Skimming Slag Using Central Composite Design Mining, Metallurgy and Exploration (e0c562d4-30bd-4458-b8cb-8e6a1cd409aa)

    By Qinghua Tian, Zhipeng Xu, Dong Li, Xueyi Guo, Liu Zhu

    A possible process for extracting tellurium and antimony from a residue generated in alkaline sulfide leaching of telluriumbearing alkaline skimming slag was proposed. The central composite design was

  • DFI
    Soil Damping In Saturated Sandy Soils For Determining Capacity Of Piles By Wave Equation Analysis

    By Mark R. Svinkin

    This paper deals with application of the wave equation analysis to determine capacities of piles driven in saturated sandy soils. It shows that pile capacity in sandy soils changes with time after the

    Jan 1, 1995

  • CIM
    Milling Circuit Control and Optimisation: The Millstar with IES

    By J. R. Hart, V. C. Smith, V. P. Babarovich-Hansen, J. H. Schubert

    "An introduction and case study of Mintek's latest generation of Milling Circuit controller, the MillStarTM with IES (Interpreting Expert System) is presented. This paper also describes as a case stud

    Jan 1, 2000

  • AIME
    Beer Cans - A New Use for Tin and Steel

    By M. W. BERNEWITZ

    ALL live producers and manufacturers of metals and alloys are investigating new uses for their products. The tin and tin-plate industry is no exception. One-third of all the new tin mined and refined

    Jan 1, 1935

  • CIM
    Honeywell Multivariable Predictive Control Implementation in the Goldex Grinding Circuit

    By M. R. Dion, K. Frenette, R. K. Jonas, S. Simard, F. Robichaud

    "In 2011, a site study indicated that the application of Honeywell’s Multivariable Predictive Control Technology (MPC) to the Goldex processing facility would provide significant opportunities for imp

    Jan 1, 2017

  • AUSIMM
    The Geotechnical Input into the Mining Process at George Fisher South Mine

    Geotechnical input is interwoven into the mining process at George Fisher South Mine from the planning and design of working areas to the closure of worked out areas and maintenance of life of mine an

    Nov 25, 2010

  • SAIMM
    Impurities Removal From High Carbon Ferrochromium By Treatment With Slag Mixtures

    By A. V. Pavlov, A. V. Dubachev, K. L. Kossyrev

    The purpose of the given research was to investigate the possibility of high-carbon ferrochromium refining to remove harmful impurities as a result of metal treatment by slag mixtures on the basis of

    Jan 1, 2004

  • DFI
    Untangling The Octopus" Bored-In Pile Construction - On Nysdot Project D256424 Ithaca, New York - Executive Summary - Bored-In Pile Construction

    By Andrew L. Peterson

    CATOH Inc. of Weedsport, New York recently completed a very challenging Bored-In Pile project which features unique construction techniques in the installation and load testing of 45 and 100 ton capac

    Jan 1, 1997

  • AUSIMM
    Structural Controls on the Development of a Mineralised Fault ù Fracture Network, NW Otago, New Zealand

    Vein swarms in metamorphic terranes such as the Otago Schist Belt, New Zealand provide evidence of past hydrothermal flow systems leading to fault initiation and reactivation. A major episode of hydro

    Jan 1, 2002

  • CIM
    A Simple Estimation Method of Materials Handling Specific Energy Consumption in HPGR Circuits

    By A. G. Doll

    "Multi-stage crushing plants, including high pressure grinding roll (HPGR) circuits, require more materials handling equipment than SAG and ball mill circuits. A temptation exists to neglect the energ

    Jan 1, 2015

  • DFI
    Wanapum Dam Repaired Using Post-Tensioning Anchors

    By Rick Deschamps, Brian Barkauskas, Aled Hughes, Abigail Stein

    In central Washington, six miles south of the small town of Vantage, the flow of the Columbia River is harnessed by the Wanapum Dam which is part of the Priest Rapids Hydroelectric Project owned and o

    Jan 1, 2018